Chester Sanitary Landfill (Facility No Sample Clauses

Chester Sanitary Landfill (Facility No. 32-AA-0009): A 40 acre parcel of County- owned land located in the east one-half of Section 36, Township 29 North, Range 7 East, Mount Diablo Base and Meridian (MDM). This landfill is open to the public for the disposal of inert construction and demolition materials by appointment only. The landfill is operated by County - not by a solid waste franchise contractor, and is it presently not available for a solid waste franchise contractor’s disposal/use.
AutoNDA by SimpleDocs

Related to Chester Sanitary Landfill (Facility No

  • Sanitary Facilities (as per Occupational Health and Safety [Building Industry] Regulations 1985)

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Skilled Nursing Facilities a. The following Health Care Services may be Covered Services when you are a patient in a Skilled Nursing Facility: i. room and board;

  • MAINTENANCE OF THE BUILDING /APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the Association upon the issuance of the completion certificate of the Project. The cost of such maintenance has been included in the Total Extras and Deposits as mentioned in clause 1.2.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!