Conceptual Proposed Condition Hydraulic Analysis Sample Clauses

Conceptual Proposed Condition Hydraulic Analysis. Send the Hydrologic and Hydraulic Design Engineer the proposed design information including the proposed bridge span length, piers, abutments, and any erosion control to confirm whether the design meets Town criteria for water surface elevations, velocities, and valley storage requirements. • Provide information to the Hydrologic and Hydraulic Design Engineer for alternative for the proposed bridge crossing as needed to mitigate any adverse impacts.
AutoNDA by SimpleDocs
Conceptual Proposed Condition Hydraulic Analysis. Copy the Revised Existing model and update with proposed conditions. • Evaluate up to one (1) alternative for the proposed bridge crossing. Modeling will include the proposed bridge span length, piers, abutments, and any erosion control. • This task includes analyzing the hydraulic impacts of this alternative in relation to Town criteria for water surface elevations, velocities, and valley storage requirements. • Detailed hydraulic modeling to mitigate any adverse impacts will not be performed under this task.

Related to Conceptual Proposed Condition Hydraulic Analysis

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin. b) The Supplier shall be entitled to disclaim responsibility for any design, data, drawing, specification or other document, or any modification thereof provided or designed by or on behalf of the Procuring Entity, by giving a notice of such disclaimer to the Procuring Entity. c) Wherever references are made in the Contract to codes and standards in accordance with which it shall be executed, the edition or the revised version of such codes and standards shall be those specified in the Schedule of Requirements. During Contract execution, any changes in any such codes and standards shall be applied only after approval by the Procuring Entity and shall be treated in accordance with GCC Clause 33.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Investment Analysis and Implementation In carrying out its obligations under Section 1 hereof, the Advisor shall: (a) supervise all aspects of the operations of the Funds; (b) obtain and evaluate pertinent information about significant developments and economic, statistical and financial data, domestic, foreign or otherwise, whether affecting the economy generally or the Funds, and whether concerning the individual issuers whose securities are included in the assets of the Funds or the activities in which such issuers engage, or with respect to securities which the Advisor considers desirable for inclusion in the Funds' assets; (c) determine which issuers and securities shall be represented in the Funds' investment portfolios and regularly report thereon to the Board of Trustees; (d) formulate and implement continuing programs for the purchases and sales of the securities of such issuers and regularly report thereon to the Board of Trustees; and (e) take, on behalf of the Trust and the Funds, all actions which appear to the Trust and the Funds necessary to carry into effect such purchase and sale programs and supervisory functions as aforesaid, including but not limited to the placing of orders for the purchase and sale of securities for the Funds.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Statistical Sampling Documentation a. A copy of the printout of the random numbers generated by the “Random Numbers” function of the statistical sampling software used by the IRO.‌ b. A description or identification of the statistical sampling software package used by the IRO.‌

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.