Condensing gas boiler Sample Clauses

Condensing gas boiler. The condensing gas boilers are used both in single and central heating systems. An optimal use combines a condensing boiler, a heating solar panel and a low temperature heating system (floor heating) so as to achieve an optimal condensation and exchange of latent heat of exhaust gas fumes. From a technical point of view the condensing gas boilers operate in two different fields of temperature with different efficiency: at 50/30°C (between sent and return temperature), they achieve a mean efficiency of 105% (Best available technology – BAT: 107%), while in the field between 80/60°C they achieve a mean efficiency of 96% (BAT 98%). The difference is due to the recovery of condensation heat in exhaust gas fumes. The energy efficiency of the condensing gas boilers has been increased from the variable flame, where the variation of the air flow in the burner according to instantaneous needs, avoids low efficiency on-off cycles. From the ecological and waste emission point of view, the emissions are respectively: CO2 9 mg/kWh NOx 40-44 mg/kWh, CO 15-19 mg/kWh. The generators available on the market are of various sizes that cover all the requirements of a traditional heating system, but a higher initial investment is necessary.
AutoNDA by SimpleDocs
Condensing gas boiler. The gas boiler, installed in 2008 in the boiler room on the ground floor to produce DHW and for heating, is of the wall-mounted condensing type, branded "Ecoflam", model "Blumax 80".

Related to Condensing gas boiler

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Fuel 28.1 The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 including GST per litre (which includes a service component).

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

Time is Money Join Law Insider Premium to draft better contracts faster.