Construction of Saltwater Disposal Terminal Sample Clauses

Construction of Saltwater Disposal Terminal. HWR shall, at its sole cost, obtain all necessary permits, rights of way and other approvals as may be required to construct and commence operation of the first Saltwater Disposal Terminal to be constructed pursuant to this Agreement (the “Primary Delivery Point”) within three miles from the location specified on Exhibit A, attached hereto. Upon receipt of such permits, rights of way and other approvals, HWR, at its sole cost risk and expense, shall install, own, operate and maintain the Primary Delivery Point.

Related to Construction of Saltwater Disposal Terminal

  • Trash Disposal Tenant shall provide trash bins or other adequate garbage disposal facilities within the trash enclosure areas provided or permitted by Landlord outside the Leased Premises sufficient for the interim disposal of all of its trash, garbage and waste. All such trash, garbage and waste temporarily stored in such areas shall be stored in such a manner so that it is not visible from outside of such areas, and Tenant shall cause such trash, garbage and waste to be regularly removed from the Property. Tenant shall keep the Leased Premises and the Outside Areas in a clean, safe and neat condition free and clear of all of Tenant's trash, garbage, waste and/or boxes, pallets and containers containing same at all times.

  • Slash Disposal Purchaser’s timing of product removal and preparatory work shall not unnecessarily xx- xxx slash disposal. Specific slash disposal measures to be employed by Purchaser are stated in C6.7 and are in ad- dition to Required Deposits for slash disposal.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Garbage Disposal You are responsible for ensuring Your and Your guests’ rubbish is removed from the Room, Building and Common Property in a timely manner and properly deposited in the communal rubbish areas allocated by Us for collection. You must use all garbage chutes according to pasted instructions near chutes.

  • Operating Environment Per specifications given in Ref. [1]

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Use of Interconnection Facilities by Third Parties 494950 9.9.1 Purpose of Interconnection Facilities 494950 9.9.2 Third Party Users. 50 9.10 Disturbance Analysis Data Exchange. 50 ARTICLE 10. MAINTENANCE 50 10.1 Participating TO Obligations. 50 10.2 Interconnection Customer Obligations. 50 10.3 Coordination 505051

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.