Construction Phase Criteria Sample Clauses

Construction Phase Criteria. Upon the issuance of the Notice to Proceed to the construction contractor, the OFPC Project Manager (PM) assumes management responsibility for the Agreement Between the Board of Regents, The University of Texas System, Owner, and the Project Architect/Engineer, and the construction contract. See APPENDIX D, Construction Phase Criteria
AutoNDA by SimpleDocs
Construction Phase Criteria. Upon the issuance of the Notice to Proceed to the construction contractor, the OFPC Resident Construction Manager (RCM) assumes management responsibility for the Agreement Between the Owner’s Design Guidelines 10/1/10 Page 2 Board of Regents, The University of Texas System, Owner, and the Project Architect/Engineer, and the construction contract. See APPENDIX D, Construction Phase Criteria
Construction Phase Criteria. Upon the issuance of the Notice to Proceed to the construction contractor, the CPO Project Manager (PM) assumes management responsibility for the Agreement Between the The University of Texas Health Science Center at San Antonio, and the Project Architect/Engineer, and the construction contract. See APPENDIX D, Construction Phase Criteria
Construction Phase Criteria. Upon the issuance of the Notice to Proceed to the construction contractor, the UTH Project Manager (PM) assumes management responsibility for the Agreement Between the Board of Regents, The University of Texas System, Owner, and the Project Architect/Engineer, and the construction contract.

Related to Construction Phase Criteria

  • Construction Phase Part 1 –

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items:

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Project Goals The schedule, budget, physical, technical and other objectives for the Project shall be defined.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Subprojects 1. The Borrower shall make Grants to Beneficiaries (Small Farmers, Municipalities and Organizations) for Subprojects (Farmers’ Business Initiatives, Infrastructure Subprojects and Environmental Subprojects) in accordance with eligibility criteria and procedures acceptable to the Bank as further detailed in the Project Operational Manual.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.

  • Preconstruction Phase The Preconstruction Phase shall mean the period commencing on the date of this CM/GC Contract and ending upon commencement of the Construction Phase; provided that if the Owner and CM/GC agree, the Construction Phase may commence before the Preconstruction Phase is completed, in which case both phases shall proceed concurrently, subject to the terms and conditions of the Contract Documents.