Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities. 3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule. 3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project. 3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures. 3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. Contractor shall follow Owner’s guidelines on the use of e-Builder®. 3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion. 3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project. 3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner. 3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC. 3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process. 3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable. 3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 18 contracts
Samples: Construction Contract, Construction Management Agreement, Construction Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application applications e-Builder® and Autodesk Build as the primary system systems for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and Autodesk Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ xxxxx://xxx.xxxxx.xxx/business/hub-procurement/hub-programs-3/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 10 contracts
Samples: Construction Manager at Risk Agreement, Construction Management Agreement, Construction Management Agreement
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application applications e-Builder® and BIM360 Build as the primary system systems for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and BIM360 Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ xxxxx://xxx.xxxxx.xxx/business/hub-procurement/hub-programs-3/system-offices-hub-program/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 10 contracts
Samples: Construction Management Agreement, Construction Management Agreement, Construction Management Agreement
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction processservices with that provided to Owner under separate contracts. Separate contracts will include, but not necessarily be limited to the following:
3.9.1. Owner supplied furnishings and equipment.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows3.9.2. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptableOwner’s document review services.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design 3.9.3. Owner’s quality assurance services.
Appears in 4 contracts
Samples: Design Build Contract, Design Build Contract, Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM usesservices with that provided to Owner under separate contracts. Separate contracts will include, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall but not necessarily be submitted limited to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.following:
Appears in 3 contracts
Samples: Design Build Contract, Design Build Contract, Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® and Autodesk Build as the primary system systems for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and Autodesk Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ xxxxx://xxx.xxxxx.xxx/business/hub-procurement/hub-programs-3/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction processservices with that provided to Owner under separate contracts. Separate contracts will include, but not necessarily be limited to the following:
3.9.1. Owner supplied furnishings and equipment.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows3.9.2. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptableOwner’s document review services.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design 3.9.3. Owner’s quality assurance services.
Appears in 3 contracts
Samples: Design Build Contract, Design Build Contract, Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 3 contracts
Samples: Construction Management Agreement, Construction Management Agreement, Construction Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction processservices with that provided to Owner under separate contracts. Separate contracts will include, but not necessarily be limited to the following:
3.9.1. Owner supplied furnishings and equipment.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows3.9.2. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptableOwner’s document review services.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design 3.9.3. Owner’s quality assurance services.
Appears in 3 contracts
Samples: Design Build Contract, Design Build Contract, Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. Contractor shall follow Owner’s guidelines on the use of e-Builder®.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.:
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 2 contracts
Samples: Construction Contract, Construction Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® and BIM360 Build as the primary system systems for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and BIM360 Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 1 contract
Samples: Construction Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-Builder® as the primary system for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.:
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM usesservices with that provided to Owner under separate contracts. Separate contracts will include, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall but not necessarily be submitted limited to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.following:
Appears in 1 contract
Samples: Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application e-information systems (PMIS), e- Builder® and BIM360 Build as the primary system for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and BIM360 Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction processservices with that provided to Owner under separate contracts. Separate contracts will include, but not necessarily be limited to the following:
3.9.1. Owner supplied furnishings and equipment.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows3.9.2. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptableOwner’s document review services.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design 3.9.3. Owner’s quality assurance services.
Appears in 1 contract
Samples: Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Construction Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate contract directly with such subcontractors and suppliers as may be necessary for construction or supply of the Project. All such contracts shall be issued consistent with the applicable provisions of this Contract.
3.3 Contractor shall cooperate with A/E CM and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 3.4 Contractor shall designate in writing a representative authorized to act on Contractor’s behalf with respect to this Master Agreement and the Project. That individual shall not be changed during the term of this Master Agreement without the prior written consent of the Owner, which consent shall not be unreasonably withheld.
3.4 3.5 Contractor shall work with the Owner to establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures. Contractor shall be responsible for communicating the status of the construction of the Project to the Owner in a timely manner.
3.5 3.6 Contractor shall utilize Owner’s project management software application e-Builder® as the primary establish and maintain a numbering and tracking system for all project documentation through all phases of the Project.. Project records, including changes, requests for information, submittals, and supplementary instructions and shall provide updated records at each Owner meeting and when requested.
3.7 Contractor shall follow provide and update the Work Progress Schedule routinely, such schedule to incorporate the Owner’s guidelines on the use of e-Builder®.
3.6 Preliminary Schedule. If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACCBudgeted Construction Cost, at Owner’s discretion.
3.7 3.8 Contractor shall identify to Owner the has identified those employees and other personnel that it will assign to the Project and management of the Project. Within 10 days of the Effective Date of this Master Agreement, Contractor will provide a document to the Owner listing the Monthly Salary Rate or Worker Wage Rate for each of them. them which will be incorporated into this Master Agreement as Exhibit F. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Master Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable areasonable objection. Contractor shall promptly update the list of persons and consultants if they a change is required during the course of the Project.
3.8 The 3.9 Contractor shall be responsible for preparing copies of the Contract Documents needed for its use and that of any of its consultants or subcontractors for performing reviews, preparing cost estimates and GMP proposals, obtaining bids/proposals for the work and constructing the Project as set forth in this Master Agreement. Contractor shall also be responsible for maintaining a register of document distribution, and distributing documents to its consultants, subcontractors, bidders, proposers and plan rooms.
3.10 Owner’s HUB Subcontracting Plan for Construction Services Policy on Participation by Historically Underutilized Business (HUB) is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ attached as Exhibit G. Contractor, as a provision of the Master Agreement, must comply with the requirements of the Owner’s HUB policies policy and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively Owner in accordance with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction processPolicy.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM usesfurnish its skill and judgment consistent with the industry standards and with due care in accordance with applicable federal, analysis technologies state and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer local laws and Contractor is also acceptableregulations.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 1 contract
Samples: CMR Services Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application applications e-Builder® and BIM360 Build as the primary system systems for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and BIM360 Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the design and construction process.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design services.
Appears in 1 contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize an Owner’s project management software application website, e-Builder® as the primary system Builder for all project documentation through all phases of the Project.. Contractor shall follow Owner’s guidelines on the use of efor Pre-Builder®Construction and Construction Phase Services.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ attached as Exhibit “B” to this Agreement. Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class cooperate and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the coordinate its design and construction processservices with that provided to Owner under separate contracts. Separate contracts will include, but not necessarily be limited to the following:
a). Owner supplied furnishings and equipment. b). Owner’s document review services.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflowsc). The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptable.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design Owner’s quality assurance services.
Appears in 1 contract
Samples: Design Build Contract
Contractor’s General Responsibilities. 3.1 Contractor shall perform all services specifically allocated to it by the Contract Documents, BIM Execution Plan, “Facility Design Guidelines” Documents as well as those services reasonably inferable from the Contract Documents as necessary for completion of the Work and the Project. Contractor agrees to perform these services using its best efforts, skills, judgments and abilities.
3.2 Contractor shall collaborate and cooperate coordinate with A/E and endeavor to further the interests of Owner and the Project. Contractor shall furnish Pre-Construction Phase Services and Construction Phase Services and complete the Project in an expeditious and economical manner consistent with the interests of Owner and in accordance with the Work Project Schedule.
3.3 Contractor shall designate a representative authorized to act on Contractor’s behalf with respect to the Project.
3.4 Contractor shall establish procedures for communication and coordination among the Project Team, Subcontractors, separate contractors, and others with respect to all aspects of the construction of the Project, and implement such procedures.
3.5 Contractor shall utilize Owner’s project management software application applications e-Builder® and BIM360 Build as the primary system systems for all project documentation through all phases of the Project.. . Contractor shall follow Owner’s guidelines on the use of e-Builder®® and BIM360 Build.
3.6 If Owner elects to “fast-track” or develop the Project in multiple stages, Contractor shall organize and perform its services as appropriate to each stage. Each stage of the Project may have a unique schedule for completion and a specific AACC, at Owner’s discretion.
3.7 Contractor shall identify to Owner the employees and other personnel that it will assign to the Project and provide the Monthly Salary Rate or Worker Wage Rate for each of them. Contractor shall also identify any consultants that will be performing services for the Project. After execution of this Agreement by Owner, Contractor shall not remove or replace the persons or entities assigned to the Project except with Owner’s written consent, which consent shall not be unreasonably withheld. Contractor shall not assign to the Project or contract with any person or entity to which Owner has a reasonable objection. Contractor shall promptly update the list of persons and consultants if they change during the course of the Project.
3.8 The Owner’s HUB Subcontracting Plan for Construction Services is available on the following website: xxxx://xxx.xxxxx.xxx/business/facilities-planning-construction/forms-guidelines-wage-rates/ xxxxx://xxx.xxxxx.xxx/business/hub-procurement/hub-programs-3/system-offices-hub-program/ Contractor, as a provision of the Agreement, must comply with the requirements of the Owner’s HUB policies and adhere to the HUB Subcontracting Plans submitted for Pre-Construction Phase and Construction Phase Services. No changes to the HUB Subcontracting Plans can be made by Contractor without the prior written approval of Owner.
3.9 Contractor shall coordinate its services and work collaboratively with the A/E design team and provide cost information to the design team and the Owner at all stages of the design. It is the Contractor’s responsibility to keep the design within the project AACC.
3.10 The Architect/Engineer shall utilize a Building Information Modeling (BIM) authoring software compliant with Industry Foundation Class and BIM based design processes to produce a building information model(s) (model) for this project. The Contractor shall be knowledgeable of BIM use for all phases of the cooperate and coordinate its design and construction processservices with that provided to Owner under separate contracts. Separate contracts will include, but not necessarily be limited to the following:
3.9.1. Owner supplied furnishings and equipment.
3.11 The Contractor shall develop a project BIM Execution Plan documenting BIM uses, analysis technologies and workflows3.9.2. The BIM Execution Plan (Exhibit H) shall be submitted to the Owner within 30 days of the execution of this Agreement. A combined BIM Execution Plan from both Architect/Engineer and Contractor is also acceptableOwner’s document review services.
3.12 Participation of Contractor or its subcontractors and suppliers in contributions to the BIM process or model(s) shall not constitute the performance of design 3.9.3. Owner’s quality assurance services.
Appears in 1 contract
Samples: Design Build Contract