Control and Monitoring System Sample Clauses

Control and Monitoring System. 6.1. The Parties agree that the Orderer is authorized to independently verify the Olive tree(s), in so doing, it is necessary to inform the Managing Company in written 10 calendar days before visit at the territory of the tree growing;
AutoNDA by SimpleDocs
Control and Monitoring System. (CMS) The following technical parameters are required to measure and monitor the plants: • AC energy output at the point of supply (kWh); • AC energy output from each inverter (kWh); • Ambient air temperature (°C); • Module temperature (°C); • Global solar irradiation on plane of array (kWh/m2); • Global solar irradiation on horizontal surface (kWh/m2). • Wind speed (km/h) A 24/7 metering and monitoring system are required, including the following: • Web display with a content and functionality, similar or equally approved to SMA’s “Webconnect”; • Weather station equipped with a pyranometer integrated with the web portal, similar or equally approved to SMA’s “Meteo Station”; The display shall include the following minimum items: • Current power in kW; • Inverter comparison status; • Energy for the current day and running total for the plant; • Reimbursement; • CO2 avoided;
Control and Monitoring System. (CMS): Apart from the obvious controlling functionality, the CMS in this scenario needs to operate as an intermediary between the Maintenance Tool and the IoT6 Gateway, accepting access requests from the former, and passing them on to the latter. Furthermore, it should accept notifications from the Maintenance Tool concerning the failure of a device as well as its replacement.
Control and Monitoring System a) SCADA System The Client’s requirements include provision of a comprehensive Supervisory, Control and Data Acquisition (SCADA) system with the following functions: • Real-time monitoring • Remote monitoring • Data capturing • Fault/incident loggingData analysis The above implies that the current SCADA system should be upgraded to replace the existing hardware with modern type. The new electronic devices to be installed on the switchgear and control panels for different purposes shall also be linked to the new control and monitoring system. The hardware that will be in different locations shall be interlinked by fibre optic cabling. The fibre optic cables installation will require trenching on parts of the routes and new racks in other parts. Coaxial and network cables will be considered for the connection of equipment installed in the same space. These cables shall be supported on suitable racks, trunking and conduits.

Related to Control and Monitoring System

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.