Coordinated Regional Transmission Expansion Planning Sample Clauses

Coordinated Regional Transmission Expansion Planning. In recognition that coordination transmission planning across regions will reduce congestion, the Parties agreed to form a Joint Planning Committee (“JPC”) to facilitate the coordination of transmission planning activities. The JPC will coordinate activities such as Coordinated Transmission Planning Studies, when mutually agreed, and the exchange of data under this Article Eight and developing necessary report and study protocols and methods for communication of information related to the coordinated planning process.48 The Parties agreed to coordinate any relevant planning and studies in accordance with each 41 JRCA § 7.1.1. 42 JRCA §§ 7.1.2 - 7.1.5. 43 See ER19-1905 Order (accepting Duke Energy Progress-PJM JOA § 8.1.5); ER16-1304 Order (accepting MISO-PJM JOA § 8.1.2). 44 JRCA § 7.1.6. 45 See ER19-1905 Order (accepting Duke Energy Progress-PJM JOA § 8.1.6).
AutoNDA by SimpleDocs
Coordinated Regional Transmission Expansion Planning 

Related to Coordinated Regional Transmission Expansion Planning

  • Traditional Medicine Cooperation 1. The aims of Traditional Medicine cooperation will be: (a) to build on existing agreements or arrangements already in place for Traditional Medicine cooperation; and (b) to promote information exchanges on Traditional Medicine between the Parties. 2. In pursuit of the objectives in Article 149 (Objectives), the Parties will encourage and facilitate, as appropriate, the following activities, including, but not limited to: (a) encouraging dialogue on Traditional Medicine policies and promotion of respective Traditional Medicine; (b) raising awareness of active effects of Traditional Medicine; (c) encouraging exchange of experience in conservation and restoration of Traditional Medicine; (d) encouraging exchange of experience on management, research and development for Traditional Medicine; (e) encouraging cooperation in the Traditional Medicine education field, mainly through training programs and means of communication; (f) having a consultation mechanism between the Parties' Traditional Medicine authorities; (g) encouraging cooperation in Traditional Medicine therapeutic services and products manufacturing; and (h) encouraging cooperation in research in the fields of Traditional Medicine in order to contribute in efficacy and safety assessments of natural resources and products used in health care.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting the HUB Program at 000-000-0000 or toll-free in Texas at 0-000-000-0000.

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35

  • Requirement for Project Planning No physical work will begin on the construction site until the receipt of a Proceed Order issued by the Owner. The Contract assumes that a Proceed Order will be issued in not more than sixty days from the Effective Date of the Contract. Failure of the Contractor to provide the necessary documentation for the issuance of a Proceed Order shall not entitle the Contractor to any extension of time. If a Proceed Order is not issued within sixty days from the award of the Contract and non-issuance is due to nonperformance by the Contractor, the Contractor may be in default.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Additional Information for Product Development Projects Outcome of product development efforts, such copyrights and license agreements. • Units sold or projected to be sold in California and outside of California. • Total annual sales or projected annual sales (in dollars) of products developed under the Agreement. • Investment dollars/follow-on private funding as a result of Energy Commission funding. • Patent numbers and applications, along with dates and brief descriptions.  Additional Information for Product Demonstrations: • Outcome of demonstrations and status of technology. • Number of similar installations. • Jobs created/retained as a result of the Agreement.