DESIGN MATURITY ASSESSMENT Sample Clauses

DESIGN MATURITY ASSESSMENT. The DMA shall demonstrate the readiness of the Contractor’s design and selected technologies for proceeding into the Contract Design phase. The Contractor shall present the DMA at the time of their choosing, at least forty-five
AutoNDA by SimpleDocs

Related to DESIGN MATURITY ASSESSMENT

  • Security Assessment If Accenture reasonably determines, or in good faith believes, that Supplier’s security practices or procedures do not meet Supplier’s obligations under the Agreement, then Accenture will notify Supplier of the deficiencies. Supplier will without unreasonable delay: (i) correct such deficiencies at its own expense; (ii) permit Accenture, or its duly authorized representatives, to assess Supplier’s security-related activities that are relevant to the Agreement; and (iii) timely complete a security questionnaire from Accenture on a periodic basis upon Accenture’s request. Security issues identified by Accenture will be assigned risk ratings and an agreed-to timeframe to remediate. Supplier will remediate all the security issues identified within the agreed to timeframes. Upon Supplier’s failure to remediate any high or medium rated security issues within the stated timeframes, Accenture may terminate the Agreement in accordance with Section 8 above.

  • Security Assessments Upon advance written notice by the JBE, Contractor agrees that the JBE shall have reasonable access to Contractor’s operational documentation, records, logs, and databases that relate to data security and the Contractor’s Information Security Program. Upon the JBE’s request, Contractor shall, at its expense, perform, or cause to have performed an assessment of Contractor’s compliance with its privacy and data security obligations. Contractor shall provide to the JBE the results, including any findings and recommendations made by Contractor’s assessors, of such assessment, and, at its expense, take any corrective actions.

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items:

  • Facility Maintenance Seller shall perform, or cause to be performed, all scheduled and unscheduled maintenance required on the Facilities in order to meet the Warranty Specifications and Performance Standards. In that regard, Seller’s responsibilities hereunder shall include, without limitation, promptly correcting any Bloom System or BOF malfunctions, either by (i) recalibrating or resetting the malfunctioning Bloom System or BOF, or (ii) subject to Section 5.7(b), repairing or replacing Bloom System or BOF components which are defective, damaged, worn or otherwise in need of repair or replacement.

  • PROPERTY ASSESSMENT The Buyer and Seller hereby acknowledge that the Province of Ontario has implemented current value assessment and properties may be re-assessed on an annual basis. The Buyer and Seller agree that no claim will be made against the Buyer or Seller, or any Brokerage, Broker or Salesperson, for any changes in property tax as a result of a re-assessment of the property, save and except any property taxes that accrued prior to the completion of this transaction.

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

  • Site Maintenance The authorized area shall be maintained in a neat, clean, and safe condition, free of any solid waste, debris, or litter, except as specifically authorized herein.

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!