DESIGN REVIEW SUBMITTAL REQUIREMENTS. 1. The A/E will be required to present the plans and specifications for review to UTH at the intervals outlined in the A/E Agreement. Intermediate reviews may be required if the scope of the project has been changed or if an earlier review found the plans and specifications unacceptable either as a whole or in part. 2. The Electrical Engineering consultant(s) will participate in all reviews, work sessions and presentations where this discipline is involved. Items outlined below are to be included for review at each phase or stage of completion. 3. UTH Project Name and Number, north arrows, and graphic scales on drawings. 4. Engineered drawings are required to include the engineering firm’s Texas Registration number and the engineer of record’s Texas PE number. 5. Schematic Design – Refer to Appendix L 6. Design Development – Refer to Appendix L 7. Construction Documents: a. Interim - 50% CD stage presentation: (1) Review of specifications using tracked changes for any modifications made to UTH base specifications. (2) Overall progress made to DD documents prior to those listed for 75% CD. b. Interim - 75% CD stage presentation: (1) All electrical distribution equipment located. (2) Complete lighting and light switching layouts. (3) Lights, receptacles and equipment requiring electric power circuited, but circuit numbering may not be complete. (4) Fixture schedule complete. (5) Electrical symbols schedule complete. (6) Site plan, all services detailed. (7) Panel schedules nearly complete. (8) Separate grounding system design complete. (9) Electrical details nearly complete. (10) One-line or riser diagram complete, except final sizing of protection, transformers and feeders depending upon final mechanical equipment selections. (11) Updated load analysis accurate to 75% CDs. (12) Reflected ceiling plans to match architecture’s. (13) Specifications complete. c. Final - 100% Submittal: (1) Design complete. Corrections required from Final Review Comments to be included on either another final submittal or as addenda, depending upon the extent and severity of comments. (2) Engineer of Record’s seal shall be on all drawings.
Appears in 2 contracts
Samples: Owner's Design Guidelines Agreement, Owner's Design Guidelines Agreement
DESIGN REVIEW SUBMITTAL REQUIREMENTS.
1. The A/E will be required to present the plans and specifications for review to UTH OFPC at the intervals outlined in the A/E Agreement. Intermediate reviews may be required if the scope of the project has been changed or if an earlier review found the plans and specifications unacceptable either as a whole or in part.
2. The Electrical Engineering consultant(s) will participate in all reviews, work sessions and presentations where this discipline is involved. Items outlined below are to be included for review at each phase or stage of completion.
3. UTH CPO Project Name and Number, north arrows, and graphic scales on drawings.
4. Engineered drawings are required to include the engineering firm’s Texas Registration number and the engineer of record’s Texas PE number.
5. Schematic Design – Refer to Appendix L 6. Design Development – Refer to Appendix L 7. Construction Documents:
a. Interim - 50% CD stage presentation:
(1) Review of specifications using tracked changes for any modifications made to UTH OFPC base specifications.
(2) Overall progress made to DD documents prior to those listed for 75% CD.
b. Interim - 75% CD stage presentation:
(1) All electrical distribution equipment located.
(2) Complete lighting and light switching layouts.
(3) Lights, receptacles and equipment requiring electric power circuited, but circuit numbering may not be complete.
(4) Fixture schedule complete.
(5) Electrical symbols schedule complete.
(6) Site plan, all services detailed.
(7) Panel schedules nearly complete.
(8) Separate grounding system design complete.
(9) Electrical details nearly complete.
(10) One-line or riser diagram complete, except final sizing of protection, transformers and feeders depending upon final mechanical equipment selections.
(11) Updated load analysis accurate to 75% CDs.
(12) Reflected ceiling plans to match architecture’s.
(13) Specifications complete.
c. Final - 100% Submittal:
(1) Design complete. Corrections required from Final Review Comments to be included on either another final submittal or as addenda, depending upon the extent and severity of comments.
(2) Engineer of Record’s seal shall be on all drawings.
Appears in 1 contract
Samples: Owner’s Design Guidelines Agreement
DESIGN REVIEW SUBMITTAL REQUIREMENTS.
1. The A/E will be required to present the plans and specifications for review to UTH OFPC at the intervals outlined in the A/E Agreement. Intermediate reviews may be required if the scope of the project has been changed or if an earlier review found the plans and specifications unacceptable either as a whole or in part.
2. The Electrical Engineering consultant(s) will participate in all reviews, work sessions and presentations where this discipline is involved. Items outlined below are to be included for review at each phase or stage of completion.
3. UTH OFPC Project Name and Number, north arrows, and graphic scales on drawings.
4. Engineered drawings are required to include the engineering firm’s Texas Registration number and the engineer of record’s Texas PE number.
5. Schematic Design – Refer to Appendix L 6. Design Development – Refer to Appendix L 7. Construction Documents:
a. Interim - 50% CD stage presentation:
(1) Review of specifications using tracked changes for any modifications made to UTH OFPC base specifications.
(2) Overall progress made to DD documents prior to those listed for 75% CD.
b. Interim - 75% CD stage presentation:
(1) All electrical distribution equipment located.
(2) Complete lighting and light switching layouts.
(3) Lights, receptacles and equipment requiring electric power circuited, but circuit numbering may not be complete.
(4) Fixture schedule complete.
(5) Electrical symbols schedule complete.
(6) Site plan, all services detailed.
(7) Panel schedules nearly complete.
(8) Separate grounding system design complete.
(9) Electrical details nearly complete.
(10) One-line or riser diagram complete, except final sizing of protection, transformers and feeders depending upon final mechanical equipment selections.
(11) Updated load analysis accurate to 75% CDs.
(12) Reflected ceiling plans to match architecture’s.
(13) Specifications complete.
c. Final - 100% Submittal:
(1) Design complete. Corrections required from Final Review Comments to be included on either another final submittal or as addenda, depending upon the extent and severity of comments.
(2) Engineer of Record’s seal shall be on all drawings.