Direct Connectors Sample Clauses

Direct Connectors. DB Contractor shall design and construct direct connectors (a) at the approximate location and with the tie-ins or connections to facilities having the orientation shown on the Schematic Design, and (b) consistent with the pavement types shown in the “Oak Hill Parkway Pavement Designations” document included in the RIDs. For example, a direct connector shown on the Schematic Design as having a tie-in to/from the right lane(s) of a facility shall not be designed and constructed to have a tie-in to/from the left lane(s) of that facility, even if the direct connector is designed at the approximate location shown on the Schematic Design.
AutoNDA by SimpleDocs
Direct Connectors. DB Contractor shall design and construct direct connectors consistent with the Schematic Design and as set forth below: ▪ S410-ELNB: Northbound I-410 mainlanes to northbound I-35 elevated lanes ▪ ELSB-S410: Southbound I-35 elevated lanes to southbound I-410 mainlanes ▪ ELSB-GB: Southbound I-35 elevated lanes to southbound I-35 frontage road between Xxxxxxxxxx Xx. and Petroleum Dr.
Time is Money Join Law Insider Premium to draft better contracts faster.