Common use of Dispatch and Scheduling Clause in Contracts

Dispatch and Scheduling. 6.1.1 The SPD shall be entirely responsible to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPD. 6.1.2 The SPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.

Appears in 8 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Dispatch and Scheduling. 6.1.1 The SPD RPD shall be entirely responsible to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Codes/Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDRPD. 6.1.2 The SPD RPD shall be responsible for directly coordinating and dealing with the Buying EntityEntity(ies), State Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD RPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD RPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable prevailing regulations. UI charges on this account shall be directly paid by the SPDRPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/Central/ State regulations. 6.1.5 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPDRPD, until rectification of the above error.

Appears in 6 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD WPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDWPD. 6.1.2 The SPD WPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Wind Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD WPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power Wind Power contracted under this Agreement. 6.1.3 The SPD WPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDWPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, to all the Buying Entities which have signed their respective Power Sale Agreements with SECI under the referred RfS. (to be deleted in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned a single Buying Entity for the corridor of entire awarded capacity under the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.RfS)

Appears in 4 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD HPD shall be entirely responsible to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDHPD. 6.1.2 The SPD HPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD HPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD HPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDHPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/Central/ State regulations. 6.1.5 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPDHPD, until rectification of the above error.

Appears in 3 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD WPD shall be entirely responsible to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDWPD. 6.1.2 The SPD WPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD WPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD WPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDWPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPDWPD, until rectification of the above error.

Appears in 3 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD HPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDHPD. 6.1.2 The SPD HPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power hybrid Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD HPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD HPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDHPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/Central/ State regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, in case of any difference in scheduled energy at the interfaces of to all the RLDCs concerned for Buying Entities which have signed their respective Power Sale Agreements with SECI under the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.referred RfS.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPD. 6.1.2 The SPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Solar Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power Solar Power contracted under this Agreement. 6.1.3 The SPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, in case of any difference in scheduled energy at the interfaces of to all the RLDCs concerned for Buying Entities which have signed their respective Power Sale Agreements with SECI under the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.referred RfS.

Appears in 2 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD HPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDHPD. 6.1.2 The SPD HPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCenters, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power hybrid Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD HPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD HPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDHPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/Central/ State regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, in case of any difference in scheduled energy at the interfaces of to all the RLDCs concerned for Buying Entities which have signed their respective Power Sale Agreements with SECI under the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.referred RfS.

Appears in 1 contract

Samples: Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPD. 6.1.2 The SPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Solar Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power Solar Power contracted under this Agreement. 6.1.3 The SPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI UI/DSM charges on this account shall be directly paid by the SPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, to all the Buying Entities which have signed their respective Power Sale Agreements with SECI under the referred RfS. (to be deleted in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned a single Buying Entity for the corridor of entire awarded capacity under the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.RfS)

Appears in 1 contract

Samples: Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD WPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDWPD. 6.1.2 The SPD WPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Wind Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD WPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power Wind Power contracted under this Agreement. 6.1.3 The SPD WPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDWPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State concern state regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, in case of any difference in scheduled energy at the interfaces of to all the RLDCs concerned for Buying Entities which have signed their respective Power Sale Agreements with SECI under the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.referred RfS.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs

Dispatch and Scheduling. 6.1.1 The SPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPD. 6.1.2 The SPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Solar Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power Solar Power contracted under this Agreement. 6.1.3 The SPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State state regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, in case of any difference in scheduled energy at the interfaces of to all the RLDCs concerned for Buying Entities which have signed their respective Power Sale Agreements with SECI under the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.referred RfS.

Appears in 1 contract

Samples: Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD OWPD shall be entirely responsible to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDOWPD. 6.1.2 The SPD OWPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD OWPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The SPD OWPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDOWPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPDOWPD, until rectification of the above error.

Appears in 1 contract

Samples: Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD WPD shall be entirely responsible required to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPDWPD. 6.1.2 The SPD WPD shall be responsible for directly coordinating and dealing with the Buying Entity, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Wind Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD WPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ intermediary procurer/ trading licensee is not a Grid connected entity in respect of the power Wind Power contracted under this Agreement. 6.1.3 The SPD WPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPDWPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 FurtherEnergy procured from the Project under the PPA shall be allocated on a pro-rata basis, in case of any difference in scheduled energy at the interfaces of to all the RLDCs concerned for Buying Entities which have signed their respective Power Sale Agreements with SECI under the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.referred RfS.

Appears in 1 contract

Samples: Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD shall be entirely responsible to schedule its power as per the applicable regulations / requirements / guidelines of CERC / SERC UPERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and shall be required to maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPD. 6.1.2 The SPD shall directly or through the Lead SPD be responsible for directly for, coordinating and dealing with the Buying Entity, State Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and anpd dispatch of power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD and Buying Entity are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreement. 6.1.3 The Power Project shall comply with the provisions of UPERC (Forecasting, Scheduling, Deviation Settlement and related matters Of Solar and generator Sources) regulations 2018 and its amendments thereof. 6.1.4 The SPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable regulations. UI charges on this account shall be directly paid by the SPD. 6.1.4 6.1.5 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 6.1.6 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI the Buying Entity / UPPCL will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.

Appears in 1 contract

Samples: Power Purchase Agreement

Dispatch and Scheduling. 6.1.1 The SPD shall be entirely responsible and shall be required to schedule its power declare the Availability and Declared Capacity for the Project and arrange for dispatch of Contracted Capacity in a composite manner under this Agreement as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC or any other competent agency and same being recognized by the RLDC/SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Codes/Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the schedule Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the SPD. 6.1.2 The SPD shall be responsible for directly coordinating and dealing with the Buying EntityDVC, State Load Dispatch CentresCentre’s, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of power Solar Power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the SPD and Buying Entity procurer are the Grid connected entities and SECI as an Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the power contracted under this Agreemententities. 6.1.3 The SPD shall be responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable prevailing regulations. UI charges on this account shall be directly paid by the SPD. 6.1.4 Auxiliary power consumption will be treated as per the concerned Central/State regulations. 6.1.5 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the SPD, until rectification of the above error.

Appears in 1 contract

Samples: Power Purchase Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!