Dispatch and Scheduling. 6.1.1 The BESSD, in consultation with Buying Entity(ies), shall be required to charge/ discharge the Battery System as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC/ NLDC or any other competent agency and same being recognized by the SLDC/NLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the BESSD. 6.1.2 The BESSD shall be responsible for directly coordinating and dealing with the Buying Entity(ies), RLDCs, SLDCs, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of charging and discharging power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the BESSD and Buying Entities are the Grid connected entities and SECI as an intermediary procurer/ trading licensee is not a Grid connected entity in respect of the Battery Storage Capacity contracted under this Agreement. 6.1.3 DSM penalties, if any, shall be levied separately on the BESSD and the Buying Entity as applicable, at their respective ends for the charging and discharging activities. UI charges on this account shall be directly paid by the BESSD or the Buying Entity as per applicable regulations. Reactive power charges shall be on account of the Buying Entity/BESSD at their respective ends during charging and discharging, as per CERC/SERC regulations. 6.1.4 The BESSD shall take separate, metered connection for the Auxiliary Power load of XXXX. Cost of Auxiliary power shall be borne by the BESSD as per the concerned Central/State regulations. 6.1.5 Capacity procured from the Project awarded under this RfS shall be allocated on back-to-back basis to the Buying Entities at the discretion of SECI, in consultation with Buying Entities. 6.1.6 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the BESSD, until rectification of the above error.
Appears in 1 contract
Dispatch and Scheduling. 6.1.1 The BESSD, in consultation with Buying Entity(ies), RPD shall be entirely responsible and shall be required to charge/ discharge declare the Battery System Availability and Declared Capacity for the RE Project along with power from any other source(s) and arrange for dispatch of Contracted Capacity in a composite manner under this Agreement as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC/ NLDC RLDC or any other competent agency and same being recognized by the SLDC/NLDC SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the BESSDRPD.
6.1.2 The BESSD RPD shall be responsible for directly coordinating and dealing with the Thermal Generator, Buying Entity(ies), RLDCs, SLDCsState Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of charging and discharging power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the BESSD RPD and Buying Entities Entity are the Grid connected entities and SECI as an intermediary procurer/ Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the Battery Storage Capacity power contracted under this Agreement.
6.1.3 DSM penalties, if any, The RPD shall be levied separately responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable prevailing regulations. For RE component of the BESSD and the Buying Entity total power supplied, DSM as per RE regulations shall be applicable, at their respective ends and for Thermal component, the charging and discharging activities. UI DSM as per Thermal regulations shall be applicable Deviation Settlement Mechanism (DSM) charges on this account shall be directly paid by the BESSD or the Buying Entity as per applicable regulations. Reactive power charges shall be on account of the Buying Entity/BESSD at their respective ends during charging and discharging, as per CERC/SERC regulationsRPD.
6.1.4 The BESSD shall take separate, metered connection for the Auxiliary Power load of XXXX. Cost of Auxiliary power shall consumption will be borne by the BESSD treated as per the concerned Central/Central/ State regulations.
6.1.5 Capacity procured It is to be noted that the summation of generation schedule of RE and Power from any other source(s) cannot be more than the Project awarded under this RfS shall be allocated on backContracted capacity in any 15 minutes’ time-to-back basis to the Buying Entities at the discretion of SECI, in consultation with Buying Entitiesblock.
6.1.6 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the BESSD, until rectification of the above error.
Appears in 1 contract
Samples: Power Purchase Agreement
Dispatch and Scheduling. 6.1.1 The BESSDAt the commencement of each Contract Year, the RPD shall declare changes in consultation with Buying Entity(ies)the rated capacity of the Thermal Power Component tied up under this Agreement. Pursuant to this, the RPD shall be entirely responsible and shall be required to charge/ discharge declare the Battery System Availability and Declared Capacity for the RE Project along with Thermal Power Project and arrange for dispatch of RE power and the Thermal Power in a composite manner under this Agreement as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC/ NLDC RLDC or any other competent agency and same being recognized by the SLDC/NLDC SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the BESSDRPD.
6.1.2 The BESSD RPD shall be responsible for directly coordinating and dealing with the Thermal Generator, Buying Entity(ies), RLDCs, SLDCsState Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of charging and discharging power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the BESSD RPD and Buying Entities Entity are the Grid connected entities and SECI as an intermediary procurer/ Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the Battery Storage Capacity power contracted under this Agreement.
6.1.3 DSM penalties, if any, The RPD shall be levied separately responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable prevailing regulations. For RE component of the BESSD and the Buying Entity total power supplied, DSM as per RE regulations shall be applicable, at their respective ends and for Thermal component, the charging and discharging activities. UI DSM as per Thermal regulations shall be applicable Deviation Settlement Mechanism (DSM) charges on this account shall be directly paid by the BESSD or the Buying Entity as per applicable regulations. Reactive power charges shall be on account of the Buying Entity/BESSD at their respective ends during charging and discharging, as per CERC/SERC regulationsRPD.
6.1.4 The BESSD shall take separate, metered connection for the Auxiliary Power load of XXXX. Cost of Auxiliary power shall consumption will be borne by the BESSD treated as per the concerned Central/State regulations.
6.1.5 Capacity procured from It is to be noted that the Project awarded under this RfS shall summation of generation schedule of RE and Thermal Power cannot be allocated on backmore than the Contracted capacity in any 15 minutes’ time-to-back basis to the Buying Entities at the discretion of SECI, in consultation with Buying Entitiesblock.
6.1.6 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the BESSD, until rectification of the above error.
Appears in 1 contract
Samples: Power Purchase Agreement
Dispatch and Scheduling. 6.1.1 The BESSD, in consultation with Buying Entity(ies), RPD shall be entirely responsible and shall be required to charge/ discharge declare the Battery System Availability and Declared Capacity for the RE Project along with power from any other source(s) and arrange for dispatch of Contracted Capacity in a composite manner under this Agreement as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC/ NLDC RLDC or any other competent agency and same being recognized by the SLDC/NLDC SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Codes/Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the BESSDRPD.
6.1.2 The BESSD RPD shall be responsible for directly coordinating and dealing with the Non-RE Generator, Buying Entity(ies), RLDCs, SLDCsState Load Dispatch Centres, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of charging and discharging power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the BESSD RPD and Buying Entities Entity are the Grid connected entities and SECI as an intermediary procurer/ Intermediary Procurer/ trading licensee is not a Grid connected entity in respect of the Battery Storage Capacity power contracted under this Agreement.
6.1.3 DSM penalties, if any, The RPD shall be levied separately responsible for any deviation from scheduling and for any resultant liabilities on account of charges for deviation as per applicable prevailing regulations. For RE component of the BESSD and the Buying Entity total power supplied, DSM as per RE regulations shall be applicable, at their and for Non-RE component including Thermal component, the DSM as per respective ends for the charging and discharging activities. UI regulations shall be applicable Deviation Settlement Mechanism (DSM) charges on this account shall be directly paid by the BESSD or the Buying Entity as per applicable regulations. Reactive power charges shall be on account of the Buying Entity/BESSD at their respective ends during charging and discharging, as per CERC/SERC regulationsRPD.
6.1.4 The BESSD shall take separate, metered connection for the Auxiliary Power load of XXXX. Cost of Auxiliary power shall consumption will be borne by the BESSD treated as per the concerned Central/Central/ State regulations.
6.1.5 Capacity procured It is to be noted that the summation of generation schedule of RE and Power from any other source(s) cannot be more than the Project awarded under this RfS shall be allocated on backContracted capacity in any 15 minutes’ time-to-back basis to the Buying Entities at the discretion of SECI, in consultation with Buying Entitiesblock.
6.1.6 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the BESSD, until rectification of the above error.
Appears in 1 contract
Samples: Power Purchase Agreement
Dispatch and Scheduling. 6.1.1 The BESSD, in consultation with Buying Entity(ies), shall be required to charge/ discharge the Battery System as per the applicable regulations / requirements / guidelines of CERC / SERC /SLDC / RLDC/ NLDC RLDC or any other competent agency and same being recognized by the SLDC/NLDC SLDC or any other competent authority / agency as per applicable regulation/ law / direction and maintain compliance to the applicable Codes/ Grid Code requirements and directions, if any, as specified by concerned SLDC/RLDC from time to time. Any deviation from the Schedule will attract the provisions of applicable regulation / guidelines / directions and any financial implication on account of this shall be on the account of the BESSD.
6.1.2 The BESSD shall be responsible for directly coordinating and dealing with the Buying Entity(ies), RLDCs, SLDCs, Regional Power Committees, and other authorities in all respects in regard to declaration of availability, scheduling and dispatch of charging and discharging power and due compliance with deviation and settlement mechanism and the applicable Grid code Regulations, acknowledging that the BESSD and Buying Entities are the Grid connected entities and SECI as an intermediary procurer/ trading licensee is not a Grid connected entity in respect of the Battery Storage Capacity contracted under this Agreement.
6.1.3 DSM penalties, if any, The BESSD shall be levied separately on the BESSD and the Buying Entity as applicable, at their respective ends responsible for the any deviation from scheduling during charging and discharging activitiesfor reasons not attributable to the Buying Entity(ies) and for any resultant liabilities on account of charges for such deviation as per applicable regulations. UI charges on this account shall be directly paid by the BESSD or the Buying Entity as per applicable regulations. Reactive power charges shall be on account of the Buying Entity/BESSD at their respective ends during charging and discharging, as per CERC/SERC regulationsBESSD.
6.1.4 The BESSD shall take separate, metered connection for the Auxiliary Power load of XXXX. Cost of Auxiliary power shall be borne by the BESSD as per the concerned Central/State regulations.
6.1.5 Contracted Capacity procured from the Project awarded under this RfS BESPA shall be allocated on backa pro-to-back basis rata basis, to all the Buying Entities at which have signed their respective BESSA with SECI under the discretion of SECI, in consultation with Buying Entities.
6.1.6 Further, in case of any difference in scheduled energy at the interfaces of all the RLDCs concerned for the corridor of the power flow, including the RLDC of the Buying Entity, SECI will make payments corresponding to the lowest of the individual energy values to the BESSD, until rectification of the above error.referred RfS.
Appears in 1 contract