Disposal of Drilling Mud and Cuttings Sample Clauses

Disposal of Drilling Mud and Cuttings. Drill mud and cuttings from drill holes may be disposed of on site, may be buried in shallow sumps, or placed into containers on-site, tested, characterized, and transported to an approved facility for disposal. The sampling and disposal method will be directed by the Geologist prior to beginning the work at the site. All work associated with the disposal will be the responsibility of the Contractor.
AutoNDA by SimpleDocs

Related to Disposal of Drilling Mud and Cuttings

  • DISPOSAL OF WASTE MATERIAL Purchaser may sidecast waste material on side slopes up to 45% if the waste material is compacted and free of organic debris. On side slopes greater than 45%, all waste material must be end hauled or pushed to the designated embankment sites and waste areas identified in Clause 0-00 XXXXX XXXX XXXXXXXX.

  • GARBAGE DISPOSAL, RECYCLING, AND BIODEGRADABLE MATERIALS A. Concessionaire shall be responsible for maintaining the cleanliness of the Concession Premises. Concessionaire shall ensure placement of all garbage and trash generated by the Concession Operation in designated containers and that said containers are emptied daily, or as more frequently required by Department, at a location within the Area designated by Department. Disposal costs from this latter location shall be borne by Department. Concessionaire shall provide such additional trash containers as may be required to keep the immediate Concession Premises clean at all times. The type of trash containers provided by Concessionaire shall be approved by Department prior to use.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Retrenchment At any time during an individual’s service, the individual may be subject to retrenchment in accordance with the provisions of Article 22 of the Agreement. In such cases, the notice provisions and all other terms of that article shall apply, anything above to the contrary notwithstanding.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Rippable Rock Rippable rock is defined as any material that can be ripped with a single-tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances:

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • FABRICATION Making up data or results and recording or reporting them.