Drainage Report and Engineering Drawings Sample Clauses

Drainage Report and Engineering Drawings. Referenced in Schedule “H” hereto are reports, accepted in principle by the Township and by the Conservation Authority, which set out generally all matters which may require consideration with respect to the drainage area of which the Subdivision forms part. The Approved Drawings referred to therein describe the Works which are necessary to provide proper drainage of all land included in the Subdivision and adjacent lands which drain through the Subdivision, and including any Works necessary for drainage to an outlet outside the Subdivision. Such Works shall include the construction of a ditch and culvert system and/or storm sewers to service the Subdivision and adjacent road allowances as are provided for in the drainage system specifications set out in Schedule “S” hereto and the approved reports and drawings referred to in Schedule “H” hereto.
AutoNDA by SimpleDocs

Related to Drainage Report and Engineering Drawings

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • Engineering Reports (a) Not less than 30 days prior to each Scheduled Borrowing Base Redetermination Date, commencing with the Scheduled Borrowing Base Redetermination to occur on or around March 15, 2007, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report. The Reserve Reports delivered in connection with each March 15 Scheduled Borrowing Base Redetermination, commencing March 15, 2007, shall be prepared by certified independent petroleum engineers or other independent petroleum consultant(s) acceptable to the Administrative Agent. The Reserve Reports delivered in connection with each September 15 Scheduled Borrowing Base Redetermination, commencing September 15, 2007, shall be prepared by or under the supervision of the chief engineer of the Borrower and a Responsible Officer shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Scheduled Borrowing Base Redetermination Reserve Report. (b) In the event of an unscheduled redetermination, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report prepared by or under the supervision of the chief engineer of the Obligors together with the certificate of a Responsible Officer who shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Reserve Report. For any unscheduled redetermination requested by the Lenders or the Borrower pursuant to Section 2.08(d), the Borrower shall provide such Reserve Report with an “as of” date as required by the Lenders as soon as possible, but in any event no later than 30 days following the receipt of the request by the Administrative Agent. (c) With the delivery of each Reserve Report, the Borrower shall provide, or cause to be provided, to the Administrative Agent and the Lenders, a certificate from a Responsible Officer certifying that, to the best of his knowledge and in all material respects: (i) the information contained in the Reserve Report and any other information delivered in connection therewith is true and correct, (ii) the Obligors and the Partnerships own good and marketable title to the Oil and Gas Properties evaluated in such Reserve Report and such Properties are free of all Liens except for Liens permitted by Section 9.03, (iii) except as set forth on an exhibit to the certificate, on a net basis there are no gas imbalances, take or pay or other prepayments with respect to its Oil and Gas Properties evaluated in such Reserve Report which would require any Obligor to deliver Hydrocarbons produced from such Oil and Gas Properties at some future time without then or thereafter receiving full payment therefor, (iv) none of Obligor’s or and the Partnerships’ Oil and Gas Properties have been sold since the date of the last Borrowing Base determination except as set forth on an exhibit to the certificate, which certificate shall list all of its Oil and Gas Properties sold and in such detail as reasonably required by the Administrative Agent, (v) attached to the certificate is a list of its Oil and Gas Properties added to and deleted from the immediately prior Reserve Report and a list showing any change in working interest or net revenue interest in its Oil and Gas Properties occurring and the reason for such change, (vi) attached to the certificate is a list of all Persons disbursing proceeds to the Obligors from their Oil and Gas Properties, and (vii) all of the Oil and Gas Properties evaluated by such Reserve Report are Mortgaged Property except as set forth on a schedule attached to the certificate.

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin. b) The Supplier shall be entitled to disclaim responsibility for any design, data, drawing, specification or other document, or any modification thereof provided or designed by or on behalf of the Procuring Entity, by giving a notice of such disclaimer to the Procuring Entity. c) Wherever references are made in the Contract to codes and standards in accordance with which it shall be executed, the edition or the revised version of such codes and standards shall be those specified in the Schedule of Requirements. During Contract execution, any changes in any such codes and standards shall be applied only after approval by the Procuring Entity and shall be treated in accordance with GCC Clause 33.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Construction Reports Each Constructing Entity shall issue reports to each other Construction Party on a monthly basis, and at such other times as reasonably requested, regarding the status of the construction and installation of the Interconnection Facilities. Each Construction Party shall promptly identify, and shall notify each other Construction Party of, any event that the Construction Party reasonably expects may delay completion, or may significantly increase the cost, of the Interconnection Facilities. Should a Construction Party report such an event, Transmission Provider shall, within fifteen days of such notification, convene a technical meeting of the Construction Parties to evaluate schedule alternatives.

  • Architect/Engineer (A/E) means a person registered as an architect pursuant to Tex. Occ. Code Xxx., Chapter 1051, as a landscape architect pursuant to Tex. Occ. Code Xxx., Chapter 1052, a person licensed as a professional engineer pursuant to Tex. Occ. Code Xxx., Chapter 1001 and/or a firm employed by Owner or a design-build contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • Final Working Drawings Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Tenant shall cause the approved Final Space Plan to be converted by the Architect and the Engineers to complete architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits (collectively, the “Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord’s receipt of the Final Working Drawings for the Premises if the same is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall immediately revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith. Landlord and Tenant acknowledge that the Final Space Plans may not depict certain structural elements of the Building and/or various elements of the Building systems which may result in material modifications to the Final Working Drawings (“Space Plan Modifications”) Furthermore, the Final Space Plans for the construction of the Tenant Improvements may require modification to account for the requirements of building codes and other legal requirements of applicable governmental entities, including, but not limited to, Title 24 and the Americans with Disabilities Act (collectively the “Building Codes”). The Final Working Drawings shall materially conform to the Final Space Plans, taking into account (i) Space Plan Modifications, (ii) the requirements of the Building Codes, (iii) other modifications resulting from physical constraints of the Premises and (iv) modifications requested by Tenant and consented to by Landlord, which consent shall not be unreasonably withheld. Tenant agrees that, in addition to other factors and considerations Landlord may take into account, it shall not be unreasonable for Landlord to withhold its consent to any matters set forth in the Final Working Drawings and not contained in the Final Space Plans, (i) if such requested modifications would not comply with the Building Codes or any laws, (ii) subject to Section 7 if such requested modifications would cause the anticipated cost of the Tenant Improvements to exceed the Tenant Improvement Allowance (unless Tenant agrees to be responsible for all such costs, and provide evidence satisfactory to Landlord of Tenant’s ability to pay such amounts, including escrow the funds if required by Landlord), (iii) if such requested modifications would not increase the value of the Tenant Improvements, (iv) if such requested modifications would increase the burden on the Building systems, either during construction or after completion of same.