Driveway Paving Sample Clauses

Driveway Paving. The Purchaser shall pay to the Vendor as an Adjustment on the Closing Date with respect to the Vendor completing the final coat of asphalt on the driveway, as outlined in the TARION Schedule "O- B" attached hereto.
AutoNDA by SimpleDocs
Driveway Paving. 14. If a paved driveway is included in this Agreement, then the Purchaser acknowledges that settlement of the driveway will occur and, as a result, the driveway may not be paved until after the Closing Date as the case may be. The Vendor covenants and agrees to pave the driveway of the Property within thirty (30) months after the Closing Date. The Vendor will notify the Purchaser prior to the date on which paving is to be completed and the Purchaser agrees to ensure that the driveway is free and clear of all vehicles and other obstructions to facilitate completion of such work. After paving has been completed, the Purchaser acknowledges that settlement of the driveway may still occur. The Vendor shall have no obligation to complete any further work on the driveway after paving has been completed notwithstanding further settlement. The Purchaser acknowledges and agrees that the Vendor shall not be required to give a separate undertaking to the Purchaser on the Closing Date to complete the driveway and the Purchaser shall not be entitled to a holdback of any amount due and payable to the Vendor on the Closing Date as security for the Vendor’s obligations in this regard. The Purchaser agrees that they will not alter the width of the driveway. LANDSCAPING, RETAINING WALLS, FENCES, BERMS AND STRUCTURES OR FEATURES AND LOT SIZE
Driveway Paving. The Purchaser shall pay to the Vendor on Closing with respect to the Vendor completing the final coat of asphalt on the driveway.

Related to Driveway Paving

  • Driveways 2.8 The Shop Response must include the possible impact description as well as a timeframe for restoration of Utility or work area. End users and O&M must be made aware of the possible impact in case of failure of redundant system/equipment. End user(s) and O&M must have some say of the date and time it may take place.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.

  • Roadways Roadways shall be designed in accordance with design data and criteria of the Ministry of Transportation as revised from time to time. Roadways shall be constructed in the locations and to the widths and grades indicated within Schedules "A-1" and "E" and set out in Schedule "D" attached hereto.

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Parking Throughout the Lease Term, Tenant shall have the exclusive right to use, free of charges, the number of parking spaces set forth in Section 12 of the Summary, which parking spaces constitute the entirety of the parking under the Building and the adjacent surface parking, being all of the parking in the Project. Tenant shall comply with the Parking Rules and Regulations which are in effect on the date hereof, as set forth in the attached Exhibit D and all reasonable modifications and additions thereto which are prescribed from time to time for the orderly operation and use of the Parking Areas by Landlord, and/or Landlord’s Parking Operator (as defined below); provided that such modifications or alterations do not effect Tenant’s use of or access to the Parking Areas. Landlord specifically reserve the right to change the size, configuration, design, layout, of the Parking Areas, and Tenant acknowledges and agrees that Landlord may, without incurring any liability to Tenant and without any abatement of Rent under this Lease, from time to time, temporarily close-off or restrict access to the Parking Areas, so long as Tenant retains access to the number of parking spaces set forth in Section 12 of the Summary. Landlord may delegate its responsibilities hereunder to a parking operator (the “Parking Operator”) in which case the Parking Operator shall have all the rights of control attributed hereby to Landlord. Any parking tax or other charges imposed by governmental authorities in connection with the use of such parking shall be paid directly by Tenant or the parking users, or, if directly imposed against Landlord, Tenant shall reimburse Landlord for all such taxes and/or charges within thirty (30) days after Landlord’s demand therefor. The parking rights provided to Tenant pursuant to this Article 23 are provided solely for use by Tenant’s own personnel visitors and invitees and such rights may not be transferred, assigned, subleased or otherwise alienated by Tenant without Landlord’s prior approval, except in connection with an assignment of this Lease or sublease of the Premises made in accordance with Article 14 above.

  • Roads 16. (1) The Joint Venturers shall —

  • Landscape Develop and coordinate landscape design concepts entailing analysis of existing conditions, proposed components and how the occupants will use the facility. Include location and description of planting, ground improvements and visual barriers.

Time is Money Join Law Insider Premium to draft better contracts faster.