Each Engine Sample Clauses

Each Engine. (i) shall be in a serviceable condition, as determined from a manufacturer’s on-wing power assurance run and borescope inspection (pursuant to the procedure set forth in Section 3.1, below); (ii) shall have been subject to a Maintenance Program equivalent to or better than the Manufacturer’s maintenance program for such Engine; (iii) shall have been operated for no more than the same number of Engine Hours that it had been at Sublease Termination since the last removal of such Engine from the Aircraft under the Engine’s Maintenance Program for (A) replacement of life-limited parts, (B) scheduled maintenance or (C) inspections or modifications required by any AD that cannot be performed on-wing (a “Scheduled Removal”); and (iv) shall have at least the same number of Engine Cycles remaining as it had at Sublease Termination since the last removal of such Engine from the Aircraft under the Engine’s Maintenance Program for a Scheduled Removal.
AutoNDA by SimpleDocs

Related to Each Engine

  • Engine A. Any internal repairs or replacement of internal components, or replacement of engine assembly.

  • Engines POSITION SERIAL NO. TOTAL HOURS TOTAL CYCLES HRS/CYCLES SINCE LAST SHOP VISIT Time Remaining to Next LIFE LIMITED PART REMOVAL PART NAME HOURS CYCLES MSN MSN

  • Sick Leave Reporting and Verification Employees must promptly notify their supervisor on their first day of sick leave and each day after, unless there is mutual agreement to do otherwise. If an employee is in a position where a relief replacement is necessary if they are absent, they will notify their supervisor at least two (2) hours prior to their scheduled time to report to work (excluding leave taken in accordance with the Domestic Violence Act). Unless otherwise precluded by law, the Employer has reason to suspect abuse, the Employer may require a written medical certificate for any sick leave absence. An employee returning to work after any sick leave absence may be required to provide written certification from their health care provider that the employee is able to return to work and perform the essential functions of the job with or without reasonable accommodation.

  • Aircraft This peril includes self-propelled missiles and spacecraft.

  • AIRCRAFT CONFIGURATION The guarantees defined below (the “Guarantees”) are applicable to the A319-100 Aircraft as described in the Standard Specification Ref. J 000 01000 Issue 6 dated 1st March 2007 equipped with:

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.