Early Stage Review - Assessment Sample Clauses

Early Stage Review - Assessment. 3.1 The Council shall assess the Development Viability Information submitted pursuant to paragraph 2.1 of Part 1 of this Schedule 7 and assess whether in its view any Surplus Profit is available to provide an Additional Affordable Housing Amount and/or an Additional Affordable Housing Contribution or whether the level of Affordable Housing for the Development shall remain as per the provisions in Schedule 1 of this Agreement.
AutoNDA by SimpleDocs

Related to Early Stage Review - Assessment

  • Project Review A. Programmatic Allowances

  • Independent Review and Inspection The Owner may undertake independent inspection of the installation of the Work. Such independent inspector shall operate on behalf of the Owner and shall act to protect the best interests of the Owner.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Title Review Seller shall be obligated to clear any and all encumbrances of title of an ascertainable monetary amount (“Seller Liens”), which Seller’s Liens Seller shall cause to be satisfied and or released at or prior to Closing (with Seller having the right to apply the Purchase Price or a portion thereof for such purpose). Notwithstanding the foregoing, prior to the Due Diligence Date, Purchaser shall give notice (“Purchaser’s Title Notice”) to Seller of the existence of any encumbrances and defects in title to which Purchaser objects and that are not Permitted Encumbrances (“Title Objections”). Seller shall, within five (5) business days from receipt of Purchaser’s Title Notice, notify Purchaser of those Title Objections that Seller elects not to attempt to remove or correct, provided that failure of Seller to give said notice shall be deemed to mean that Seller shall remove or correct all of Purchaser’s Title Objections. In the event Seller elects to attempt to remove or correct Title Objections(s) and by the later of the Due Diligence Date or the date which is thirty (30) business days following Seller’s receipt of Purchaser’s Title Notice, Seller has not arranged for removal or correction of said Title Objections, then Purchaser shall either (i) terminate this Agreement in which event the Deposit shall be returned to Purchaser and the parties hereto shall have no further rights or obligations hereunder, except for rights and obligations which, by their terms, survive the termination hereof, or (ii) accept the condition of the title to the Property as it then is, without diminution of the Purchase Price. If Purchaser fails to elect (i) above, then Purchaser shall be deemed to have elected (ii) above. Encumbrances and defects to title that are not included in Purchaser’s Title Objections and those Title Objections that are accepted pursuant to this subsection shall be deemed to be Permitted Encumbrances. Notwithstanding anything herein to the contrary, Seller’s Liens shall not be deemed Permitted Encumbrances. Recording fees for recording documents to discharge Title Objections and Seller’s Liens shall be borne by Seller.

  • Agreement Review If, pursuant to section 25.10 (Review of Agreement) of the Bilateral Agreement, the Bilateral Agreement is reviewed after three or five years, or both, of the effective date of the Bilateral Agreement, and any changes to the Bilateral Agreement are required as a result, the Parties agree to amend the Agreement as necessary and in a manner that is consistent with such changes.

  • Review Stages The Project Architect shall submit documents to the Owner for review at completion of the Schematic Design Phase, Design Development Phase and at the following stages of completion of the Construction Documents Phase as follows: 50%, 75%, 100%

  • Impact Assessment If Service Provider desires to make any change, upgrade, replacement or addition that may have an adverse impact or require changes as described in Section 9.6(c) or increase the risk of Service Provider not being able to provide the Services in accordance with this Agreement or violate or be inconsistent with DIR Standards or Strategic Plans, then Service Provider shall prepare a written risk assessment and mitigation plan (1) describing in detail the nature and extent of such adverse impact or risk, (2) describing any benefits, savings or risks to DIR or the DIR Customers associated with such change, and (3) proposing strategies to mitigate any adverse risks or impacts associated with such change and, after consultation and agreement with DIR, implement the plan.

  • Post Review With respect to each contract not governed by paragraph 2 of this Part, the procedures set forth in paragraph 4 of Appendix 1 to the Guidelines shall apply.

Time is Money Join Law Insider Premium to draft better contracts faster.