Electric General Plant Sample Clauses

Electric General Plant. Depreciation Reserve shall equal the general plant depreciation reserve balance as recorded in FERC Account No. 108 associated with Electric General Plant.
AutoNDA by SimpleDocs
Electric General Plant. 390 Structures and improvements 2.51 391.01 Office furniture, equipment 4.55 391.20 Office furniture equipment (Data Processing Equipment) 20.00 392.22 Transportation Equipment 3.33 394 Tools, shop, garage equipment 4.55 395 Laboratory equipment 4.55 396 Power operated equipment 4.55 397.01 Communication equipment – Radio 4.55 397.02 Communication equipment – Telephone 12.50 397.50 &.60 Communication equipment – Network 4.55 398.01 Power and Supervisory Control 4.55 Common General Plant 390 Structures and improvements 2.57 391.10 Office furniture and equipment 4.55 391.21 Data Processing Equipment 20.00 392.21 Transportation Equipment – Aircraft 7.50 393 Stores equipment 4.55 394 Tools, shop and garage equipment 4.55 395 Laboratory equipment 4.55 396 Power operated equipment 4.55 397.10 Communication equipment – Radio 4.55 397.20 Communication equipment – Telephone 12.50 397.30 Communication equipment – Network 4.55 398 Miscellaneous equipment 4.55

Related to Electric General Plant

  • Electric Systems Are there any problems with electrical fuses, circuit breakers, outlets or wiring? Yes No. Unknown Comments:

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Building Commissioning Services The Owner may provide as a part of its testing services the Building Commissioning services involving the project’s HVAC and exhaust systems, temperature control systems, fire detection and alarm systems, emergency power and lighting system, fire suppression system, security locks and security locking control systems, food service equipment (if applicable), and laundry equipment (if applicable). In the event the Using Agency’s Program specifies additional commissioning services, the Owner shall procure such services as well. The Owner, through its Executive Administrator, may engage an independent Commissioning Authority. It is the intent of this Article that the Commissioning Authority enforce the requirements mentioned herein and certify that the systems and equipment listed all function properly prior to the initiation of each final inspection.

  • Utility Services Company agrees to pay the full cost and expense associated with its use of all utilities, including but not limited to water, sanitary sewer, electric, storm drainage, and telecommunication services.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

Time is Money Join Law Insider Premium to draft better contracts faster.