Elm Road Monitoring Site Sample Clauses

Elm Road Monitoring Site. WEC or its contractor agrees to install, maintain and operate an air monitoring station at a location to be mutually agreed upon between WEC and the City within 1200 feet of the intersection of Elm Road and the Chicago and Northwestern Railroad line to monitor for particulate matter measured as Total Suspended Particulates ("TSP"), PM10 and PM2.5 consistent with appropriate state and/or federal ambient air quality monitoring requirements except that the monitoring shall occur on a daily basis. Meteorological data including wind speed, wind direction and temperature shall also be collected at this location. The air monitors at this location shall be operational as soon as practicable, but no later than 150 days after the date of this Agreement and shall continue for a period of no less than two years after commencement of construction of the first of any of the New Facilities approved by the PSC. If after two years following commencement of construction of the first of any of the New Facilities no exceedences of state or national ambient air quality standards attributable to any WEC operations are detected, the frequency of the monitoring can be reduced to a sampling frequency of once every three days for each of the above air pollutants. Monitoring shall continue thereafter unless the provisions of Paragraph E.4 apply.
AutoNDA by SimpleDocs

Related to Elm Road Monitoring Site

  • Monitoring Services IDT staff shall, using methods that include face-to-face and other contacts with the member, monitor the services a member receives. This monitoring shall ensure that:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Service Monitoring Customer gives express consent for Vodafone to monitor Customer’s use of the Service (and disclose and otherwise use the information obtained) only to: (a) the extent allowed by Applicable Law; (b) comply with Applicable Law; (c) protect the Network from misuse; (d) protect the integrity of the public internet and/or Vodafone’s systems and Networks; (e) the extent necessary to determine if Customer has breached any conditions or restrictions on use of the Service; (f) provide the Service; and/or (g) take other actions agreed or requested by Customer.

  • Project Monitoring The Developer shall provide regular status reports to the NYISO in accordance with the monitoring requirements set forth in the Development Schedule, the Public Policy Transmission Planning Process Manual and Attachment Y of the OATT.

  • SERVICE MONITORING, ANALYSES AND ORACLE SOFTWARE 11.1 We continuously monitor the Services to facilitate Oracle’s operation of the Services; to help resolve Your service requests; to detect and address threats to the functionality, security, integrity, and availability of the Services as well as any content, data, or applications in the Services; and to detect and address illegal acts or violations of the Acceptable Use Policy. Oracle monitoring tools do not collect or store any of Your Content residing in the Services, except as needed for such purposes. Oracle does not monitor, and does not address issues with, non-Oracle software provided by You or any of Your Users that is stored in, or run on or through, the Services. Information collected by Oracle monitoring tools (excluding Your Content) may also be used to assist in managing Oracle’s product and service portfolio, to help Oracle address deficiencies in its product and service offerings, and for license management purposes.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!