EMC Requirements Sample Clauses

EMC Requirements. ‌ The power supply shall meet the following requirements in the latest edition of standards when operating under typical load conditions and with all ports fully loaded; The Power supply integrated into the shelf is called the component power supply. Manufacturer shall provide the proof of compliance for the component power supply that are required for spare parts shipment. The component power supply shall not contribute any noncompliant conditions to the end-use product. If at any time it is found that a supplier’s component power supply causes the end-use product to fail emissions and/or immunity testing, the supplier will be instructed to investigate and resolve the problem. The power shelf shall have minimum 6dB margin from the Class A limit for the radiated and conducted emissions. Depending on the system manufacturer’s design goals and business needs, more margin may be required when it is integrated into the final end system. The following EMC Standards (the latest version) are applicable to the product. • FCC /ICES-003 • CISPR 32/EN55032 • CISPR 35/EN55035 - Immunity • EN61000-3-2 - Harmonics • EN61000-3-3 - Voltage Flicker • VCCI • KN 32 and KN35 Each individual basic standard for immunity test has the following minimum passing requirement. Higher level of passing criteria may be applied depending on the system manufacturer’s design goals and business needs. • EN61000-4-2 Electrostatic Discharge Immunity o Contact discharge: >4kV o Air discharge: >8kV • EN61000-4-3 Radiated Immunity o > 3V/m • EN61000-4-4 Electrical Fast Transient Immunity o AC Power Line: >1kV o Signal Line: >0.5kV • EN61000-4-5 Surge o AC Power Line: >1kV (Line-to-line), >2kV (Line-to-earth) o Signal Port: >1kV • EN61000-4-6 Immunity to Conducted Disturbances o DC Power Line: > 3Vrms o > 1A/m • EN61000-4-11 Voltage dip and sag
AutoNDA by SimpleDocs
EMC Requirements. REQ-031953/A REQ-031954/A REQ-031955/A REQ-031956/A REQ-031957/A REQ-031958/A The drives shall have EMC compliant metal housing, using stainless steel and/or aluminium. The housing shall allow connection of shielding meshes and earthing. All digital inputs shall be optically insulated. All digital outputs shall be optically insulated from the motor voltage. The configuration interface shall be optically insulated from the motor voltage. The power supply integration shall be EMC compliant, for example using inbuilt filters.

Related to EMC Requirements

  • Basic Requirements To be eligible for PayPal’s Seller Protection program, all of the following basic requirements must be met, as well as any applicable additional requirements: • The primary address for your PayPal account must be in the United States. • The item must be a physical, tangible good that can be shipped, except for items subject to the Intangible Goods Additional Requirements. Transactions involving items that you deliver in person in connection with payment made in your physical store, may also be eligible for PayPal’s Seller Protection program so long as the buyer paid for the transaction in person by using a PayPal goods and services QR code. • You must ship the item to the shipping address on the Transaction Details page in your PayPal account for the transaction. If you originally ship the item to the recipient’s shipping address on the Transaction Details page but the item is later redirected to a different address, you will not be eligible for PayPal’s Seller Protection program. We therefore recommend not using a shipping service that is arranged by the buyer, so that you will be able to provide valid proof of shipping and delivery. • The shipping requirement does not apply to eligible transactions involving items that you deliver in person; provided, however, that you agree to provide us with alternative evidence of delivery or such additional documentation or information relating to the transaction that we may request. • You must respond to PayPal’s requests for documentation and other information in a timely manner as requested in our email correspondence with you or in our correspondence with you through the Resolution Center. If you do not respond to PayPal’s request for documentation and other information in the time requested, you may not be eligible for PayPal’s Seller Protection program. • If the sale involves pre-ordered or made-to-order goods, you must ship within the timeframe you specified in the listing. Otherwise, it is recommended that you ship all items within 7 days after receipt of payment. • You provide us with valid proof of shipment or delivery. • The payment must be marked “eligible” or “partially eligible” in the case of Unauthorized Transaction claims, or “eligible” in the case of Item Not Received claims, for PayPal’s Seller Protection program on the Transaction Details page. • In the case of an Unauthorized Transaction claim, you must provide valid proof of shipment or proof of delivery that demonstrates that the item was shipped or provided to the buyer no later than two days after PayPal notified you of the dispute or reversal. For example, if PayPal notifies you of an Unauthorized Transaction claim on September 1, the valid proof of shipment must indicate that the item was shipped to the buyer no later than September 3 to be eligible for PayPal’s Seller Protection program. PayPal determines, in its sole discretion, whether your claim is eligible for PayPal’s Seller Protection program. PayPal will make a decision, in its sole discretion, based on the eligibility requirements, any information or documentation provided during the resolution process, or any other information PayPal deems relevant and appropriate under the circumstances. Item Not Received additional requirements To be eligible for PayPal’s Seller Protection program for a buyer’s Item Not Received claim, you must meet both the basic requirements and the additional requirements listed below: • Where a buyer files a chargeback with the issuer for a card-funded transaction, the payment must be marked “eligible” for PayPal’s Seller Protection on the Transaction Details page. • You must provide proof of delivery as described below.

  • System Requirements Apple Software is supported only on Apple-branded hardware that meets specified system requirements as indicated by Apple.

  • HIPAA Requirements The Parties agree that the provisions under HIPAA Rules that are required by law to be incorporated into this Amendment are hereby incorporated into this Agreement.

  • Specific Requirements 7.4.1 Workers’ compensation insurance with statutory limits required by South Dakota law. Coverage B-Employer’s Liability coverage of not less than $500,000 each accident, $500,000 disease-policy limit, and $500,000 disease-each employee.

  • Match Requirements There is no match required on the part of the Grantee under this Agreement.

  • Time Requirements The Independent Contractor will not be required to follow or establish a regular or daily work schedule, but shall devote during the term of this Agreement the time, energy and skill as necessary to perform the services of this engagement and shall, periodically or at any time upon the request of the Company, submit information as to the amount of time worked and scope of work performed.

  • Program Requirements A. The parties shall comply with the Disadvantaged Business Enterprise Program requirements established in 49 CFR Part 26.

  • PJM Requirements The DS Supplier acknowledges and agrees that, as a member of PJM, the Company is bound by all PJM operating instructions, policies and procedures as are currently set forth in the PJM Operating Manual, which are available through the Internet on the PJM Home Page (xxxx://xxx.xxx.xxx), as may be revised from time to time, which are needed to maintain the integrity of the PJM system. The DS Supplier acknowledges and agrees that it will cooperate with the Company so that the Company will be in compliance with all PJM Emergency Operations Procedures, which include, but are not limited to, those procedures pertaining to minimum and maximum generation Emergencies, and measures requiring involuntary Customer participation, such as supply voltage reduction or full interruption of Customer load by either manual or automatic means.

  • DBE Requirements A. Notice is hereby given to the CONSULTANT and any SUB-CONSULTANT, and both agree, that failure to carry out the requirements set forth in 49 CFR Sec. 26.13(b) shall constitute a breach of this Contract and, after notification and failure to promptly cure such breach, may result in termination of this Contract or such remedy as INDOT deems appropriate. The referenced section requires the following assurance to be included in all subsequent contracts between the CONSULTANT and any SUB-CONSULTANT: The CONSULTANT, sub recipient or SUB-CONSULTANT shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy, as INDOT, as the recipient, deems appropriate.

  • Local Law Requirements Spain. With respect to Customers domiciled in Spain, in the event of any conflict between any statutory law in Spain applicable to Customer, and the terms and conditions of this Agreement, the applicable statutory law shall prevail.

Time is Money Join Law Insider Premium to draft better contracts faster.