End-to-End Testing Sample Clauses

End-to-End Testing. A. After the Lessee (or its designee) has established end-to-end connectivity on the fibers during initial construction, it shall: o perform bi-directional end-to-end tests, o test continuity to confirm that no fibers have been "frogged" or crossed in any of the splice points, 134 o record loss measurements using a light source and a power meter, and o take OTDR traces and record splice loss measurements.
AutoNDA by SimpleDocs
End-to-End Testing. After the contractor has provided end-to-end connectivity on the fibers, bi-directional end-to-end testing will be done. Continuity tests will be done to verify that no fibers have been "frogged" or crossed in any of the splice points. Loss measurements will be recorded using a laser source and a power meter. OTDR traces will be taken and splice loss measurements will be recorded. The Constructing Party will also store OTDR traces on diskette.
End-to-End Testing. A. After Xxxxxxxx has established end-to-end connectivity on the fibers during initial construction, it shall: o perform bi-directional end-to-end tests, o test continuity to confirm that no fibers have been "frogged" or crossed in any of the splice points,
End-to-End Testing i. The Contractor shall complete as appropriate development, Unit/Assembly Testing, System Integration/Regression Testing, and Performance/Security Testing prior to the commencement of End to End testing.
End-to-End Testing. A. After Williams xxx xxxxblished end-to-end connectivity on the fibers during initial construction, it shall: ? perform bi-directional end-to-end tests, ? test continuity to confirm that no fibers have been "frogged" or crossed at any splice points, ? record loss measurements using a light source and a power meter, and ? take OTDR traces and record splice loss measurements.
End-to-End Testing. After tester has provided end-to-end connectivity on the fibers, continuity tests will be done to verify that no fibers have been transposed or crossed in any of the splice points. Loss measurements will be recorded using a laser source and a power meter at 1310 and 1550nm. OTDR traces will be taken at 1310 and 1550nm and splice loss measurements will be recorded. Fiber Technologies will save each OTDR trace to diskette and provide to customer for evaluation. In addition, Fiber Technologies is to provide power meter test data to customer in hard copy on supplied forms. It is imperative to verify that all fibers have one to one continuity on the new cable. This will be done at the fiber level, not just the pigtail level. For each pigtail, visual inspection will be used to verify fiber color and buffer color. Once the fiber color and the buffer color have been recorded, power meters will be attached. Then at the far end, visual inspection should be used to verify the fiber color and the buffer tube color of the fiber receiving the signal. Then power level readings should be taken in the opposite direction. The power measurements should be made at 1310 and 1550nm unless otherwise specified. The test results for the bi-directional OTDR testing are as follows:
End-to-End Testing. Synacor will provide end to end system testing in Synacor’s pre-production environment that will include testing of authenticated Users. To make this possible, AT&T will provide Synacor with availability to their systems and end points as well as provide Synacor with all necessary test accounts. Synacor will report end to end test failures to AT&T as part of the normal sprint release cycle activities.
AutoNDA by SimpleDocs
End-to-End Testing. 5.10 If the SD wishes to use its Data Interchange Interface it must participate in End to End Testing in accordance with this clause 5 on the INMS System and the SD System, and in combination with other CSP systems connected to the INMS System.
End-to-End Testing. At IRU Xxxxxxx’s request and at Xxxxxxx’s expense, Grantor shall perform the bi-directional end- to-end tests. Grantor shall measure and verify losses for each splice point in both directions and average the loss values. Grantor shall mark any splice points as Out-of-Spec (OOS) if they do not meet the specifications set forth in Exhibit BB. In the event that such test(s) do not meet the specifications set forth in Exhibit BB and such failure is not caused by any act or omission of IRU Grantee, such test shall not be at Grantee’s expense.
End-to-End Testing. The cables are to be tested for continuity of pairs and electrical and transmission characteristics of the cable pairs, between MDF and pillar in case of primary cables and pillar and DPs in case of distribution cables separately. Broadly the following Parameters are tested I. Insulation
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!