Common use of Engineering Clause in Contracts

Engineering. A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE as hereinafter stipulated. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) Final B. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES by the ILLINOIS TOLLWAY. C. The PARTIES shall review the plans and specifications which impact the respective PARTIES’ maintained highways within thirty (30) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the plans and specifications. Approval by the individual PARTY shall mean the PARTY agrees with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTY's maintained highways. In the event of disapproval, the PARTY will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Soil and Water Conservation District, DuPage County, including but not limited to the Building & Zoning Department and Division of Transportation, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The PARTIES shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its property and right of way within the PROJECT limits to the ILLINOIS TOLLWAY and/or its agents, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit for right of access and/or temporary use shall not be unreasonably withheld by any of the PARTIES. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 2 contracts

Samples: Intergovernmental Agreement, Intergovernmental Agreement

Engineering. A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE as hereinafter stipulated. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES the COUNTY and the VILLAGE for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) Final B. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES COUNTY and the VILLAGE by the ILLINOIS TOLLWAY. C. The PARTIES COUNTY and the VILLAGE shall review the plans and specifications which impact the their respective PARTIES’ maintained highways and facilities within thirty (30) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY the COUNTY and/or the VILLAGE within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the plans and specifications. Approval by the individual PARTY COUNTY and/or the VILLAGE, respectively, shall mean the PARTY agrees they agree with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTY's their maintained highwayshighways and facilities. In the event of disapproval, the PARTY COUNTY and/or the VILLAGE will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to all PARTIES by the ILLINOIS TOLLWAY. F. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Soil and Water Conservation District, DuPage CountyCOUNTY, including but not limited to the Building & and Zoning Department and Division of Transportation, Illinois Environmental Protection Agency, VILLAGE, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. G. The PARTIES COUNTY and the VILLAGE shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its their property and right of way within necessary for the PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit for right of access and/or for temporary use shall not be unreasonably withheld by any of the PARTIESCOUNTY or the VILLAGE. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The VILLAGE shall enter into an agreement with a professional engineering firm/consultant to perform Phase II engineering services for the INTERCHANGE PROJECT, subject to cost participation and reimbursement by the ILLINOIS TOLLWAY agrees to perform preliminary and final design engineeringthe COUNTY as stipulated. Phase II engineering services will include, obtain but not be limited to, obtaining any necessary surveys, surveys and prepare preparing the final construction plans and specifications for the INTERCHANGE PROJECT, subject . The COUNTY agrees to reimbursement by provide technical assistance to the VILLAGE as hereinafter stipulated. During in the design and preparation administration of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) FinalPhase II engineering services. B. The final approved plans ILLINOIS TOLLWAY and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES by the ILLINOIS TOLLWAY. C. The PARTIES VILLAGE shall review the construction plans and specifications which impact the their respective PARTIES’ maintained highways within thirty fifteen (3015) calendar days of receipt thereof. If the ILLINOIS TOLLWAY COUNTY does not receive comments or objections from any respective PARTY the ILLINOIS TOLLWAY and/or the VILLAGE within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the respective plans and specificationsspecifications submittal. Approval by the individual PARTY ILLINOIS TOLLWAY and the VILLAGE shall mean the PARTY agrees they agree with all specifications in the plans, including alignment and location of the INTERCHANGE PROJECT improvements which impact the PARTY's their maintained highwaysroadways. In the event of disapproval, the PARTY ILLINOIS TOLLWAY and/or the VILLAGE will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAYCOUNTY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. C. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. D. The final approved plans and specifications for the INTERCHANGE PROJECT shall be promptly delivered electronically to the ILLINOIS TOLLWAY and the VILLAGE by the COUNTY. E. The ILLINOIS TOLLWAY agrees to assume the overall INTERCHANGE PROJECT responsibility, including assuring ensuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Cook County Soil and Water Conservation District(SWPPP), DuPage Cook County, including but not limited to the Building & Zoning Department and Division of Transportation, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the INTERCHANGE PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the INTERCHANGE PROJECT. F. The PARTIES DEPARTMENT and the VILLAGE shall grant and consent consent, in a reasonable amount of time, to any and all permits, rights permits for right of access (ingress and and/or egress), ) and/or temporary use of its property and right of right-of-way within the INTERCHANGE PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit permit(s) for right of access and/or access, or temporary use of any of the DEPARTMENT’s or VILLAGE’s property shall not be unreasonably withheld by any of the PARTIESDEPARTMENT or the VILLAGE. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The ILLINOIS TOLLWAY CITY agrees to serve as the lead agency to perform preliminary and final design engineering, obtain necessary surveys, fund a conceptual engineering study for the PROJECT. The COUNTY agrees to serve as the lead agency to perform and prepare the final plans and specifications fund a feasibility study for the PROJECT, subject 75% of the cost of which will be credited to reimbursement by the VILLAGE COUNTY as hereinafter stipulatedpart of its participation cost in the PROJECT. The COUNTY also agrees to serve as the lead agency to perform and fund design engineering for the PROJECT, 75% of the cost of which will be credited to the COUNTY as part of its participation cost in the PROJECT. B. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY COUNTY shall submit the plans and specifications to all PARTIES the ILLINOIS TOLLWAY, the DEPARTMENT, and the CITY for their review and comment at the following stages of plan preparation: 30% Complete 60% Complete (preliminary) 95% Complete (pre-final) Final B. C. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES by the ILLINOIS TOLLWAY. C. The PARTIES , the DEPARTMENT and the CITY shall review the PROJECT plans and specifications which impact the their respective PARTIES’ maintained highways within thirty fifteen (3015) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the plans and specifications. Approval by the individual PARTY ILLINOIS TOLLWAY, the DEPARTMENT, and the CITY shall mean the PARTY agrees they agree with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTY's maintained highwayshighways of the ILLINOIS TOLLWAY, the DEPARTMENT, and the CITY. In the event of disapproval, the PARTY ILLINOIS TOLLWAY, the DEPARTMENT, and/or the CITY will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAYCOUNTY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (including but not necessarily limited to U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District Department of Greater Chicago, Xxxx-DuPage Soil and Water Conservation District, DuPage County, including but not limited to the Building & Zoning Department Environmental Concerns and Division of TransportationHighways, Illinois Environmental Protection Agency, etc.) ), and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.)agreements, as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project PROJECT schedules and deadlines. All The PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federalfederal, Statestate, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The OTHER PARTIES shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its property and right of way within the PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit for right of access and/or access, temporary use shall not be unreasonably withheld by any of the OTHER PARTIES. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016March 2018, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The VILLAGE shall enter into an agreement with a professional engineering firm/consultant to perform Phase II engineering services for the INTERCHANGE PROJECT, subject to cost participation and reimbursement by the ILLINOIS TOLLWAY agrees to perform preliminary and final design engineeringthe COUNTY as stipulated. Phase II engineering services will include, obtain but not be limited to, obtaining any necessary surveys, surveys and prepare preparing the final construction plans and specifications for the INTERCHANGE PROJECT, subject . The COUNTY agrees to reimbursement by provide technical assistance to the VILLAGE as hereinafter stipulated. During in the design and preparation administration of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) FinalPhase II engineering services. B. The final approved plans ILLINOIS TOLLWAY and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES by the ILLINOIS TOLLWAY. C. The PARTIES VILLAGE shall review the construction plans and specifications which impact the their respective PARTIES’ maintained highways within thirty fifteen (3015) calendar days of receipt thereof. If the ILLINOIS TOLLWAY COUNTY does not receive comments or objections from any respective PARTY the ILLINOIS TOLLWAY and/or the VILLAGE within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the respective plans and specificationsspecifications submittal. Approval by the individual PARTY ILLINOIS TOLLWAY and the VILLAGE shall mean the PARTY agrees they agree with all specifications in the plans, including alignment and location of the INTERCHANGE PROJECT improvements which impact the PARTY's their maintained highwaysroadways. In the event of disapproval, the PARTY ILLINOIS TOLLWAY and/or the VILLAGE will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAYCOUNTY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. C. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. D. The final approved plans and specifications for the INTERCHANGE PROJECT shall be promptly delivered electronically to the ILLINOIS TOLLWAY and the VILLAGE by the COUNTY. E. The ILLINOIS TOLLWAY agrees to assume the overall INTERCHANGE PROJECT responsibility, including assuring ensuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Xxxx County Soil and Water Conservation District(SWPPP), DuPage Xxxx County, including but not limited to the Building & Zoning Department and Division of Transportation, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the INTERCHANGE PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the INTERCHANGE PROJECT. F. The PARTIES DEPARTMENT and the VILLAGE shall grant and consent consent, in a reasonable amount of time, to any and all permits, rights permits for right of access (ingress and and/or egress), ) and/or temporary use of its property and right of right-of-way within the INTERCHANGE PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit permit(s) for right of access and/or access, or temporary use of any of the DEPARTMENT’s or VILLAGE’s property shall not be unreasonably withheld by any of the PARTIESDEPARTMENT or the VILLAGE. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE CITY as hereinafter stipulated. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) Final. B. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES CITY by the ILLINOIS TOLLWAY. C. The PARTIES CITY shall review the plans and specifications which impact the respective PARTIES’ CITY's maintained highways within thirty twenty (3020) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY the CITY within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the plans and specifications. Approval by the individual PARTY CITY shall mean the PARTY CITY agrees with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTYCITY's maintained highways. In the event of disapproval, the PARTY CITY will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater ChicagoKane County, Xxxx-DuPage Soil and Water Conservation District, DuPage DeKalb County, including but not limited to the Building & Zoning Department of Environmental Concerns and Division of TransportationHighways, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The PARTIES CITY shall grant and consent to any and all construction permits, temporary or construction rights of access (ingress and egress), temporary use of its property and temporary right of way within the PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit for temporary right of access and/or or temporary use shall not be unreasonably withheld by any of the PARTIESCITY. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE COUNTY as hereinafter stipulated. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) Final. B. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES COUNTY by the ILLINOIS TOLLWAY. C. The PARTIES COUNTY shall review the PROJECT plans and specifications which impact the respective PARTIES’ maintained COUNTY's highways within thirty fifteen (3015) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY the COUNTY within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval by the COUNTY of the plans and specifications. Approval by the individual PARTY COUNTY shall mean the PARTY COUNTY agrees with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTYCOUNTY's maintained highwayshighways and the BRIDGES. In the event of disapproval, the PARTY COUNTY will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (including but not necessarily limited to U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Du Page Soil and Water Conservation District, DuPage County, including but not limited to the Building & Zoning Department of Environmental Concerns and Division of TransportationHighways, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.)agreements, as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project PROJECT schedules and deadlines. All The PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The PARTIES In conjunction with the PROJECT, upon review and satisfaction of federal, state and local statutes, rules, regulations and ordinances, the COUNTY shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its property and right of way within to the PROJECT limits ILLINOIS TOLLWAY, without charge to the ILLINOIS TOLLWAY and/or its agents, without charge of permit fees to by the ILLINOIS TOLLWAYCOUNTY. Any permit for right of access and/or access, temporary use shall not be unreasonably withheld by any of the PARTIESCOUNTY. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The PARTIES acknowledge that the VILLAGE served as the lead agency to perform preliminary engineering and has coordinated all necessary aspects so related pertaining to the improvements associated with the PROJECT. B. The ILLINOIS TOLLWAY agrees to serve as the lead agency to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for for, and construct the PROJECT, subject to reimbursement by the VILLAGE as hereinafter stipulated. . C. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES the VILLAGE, the COUNTY and the DEPARTMENT for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) Final B. D. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES by the ILLINOIS TOLLWAY. C. The OTHER PARTIES shall review the plans and specifications which impact the respective OTHER PARTIES’ maintained highways roadways within thirty fifteen (3015) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY the OTHER PARTIES within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the plans and specifications. Approval by any of the individual PARTY OTHER PARTIES shall mean the PARTY agrees indicate agreement with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTY's OTHER PARTIES maintained highwaysroadways. In the event of disapproval, any of the PARTY OTHER PARTIES will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. E. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. F. The final approved plans and specifications for the PROJECT shall be promptly delivered to each of the OTHER PARTIES by the ILLINOIS TOLLWAY. G. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT engineering responsibility, including assuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Du Page Soil and Water Conservation District, DuPage County, including but not limited to the Building & Zoning Department and Division of Transportation, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. The ILLINOIS TOLLWAY agrees to prepare the Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report. The ILLINOIS TOLLWAY also agrees to prepare preliminary roadway and drainage structure plans and make or cause to be made such traffic studies and counts and special intersection studies as may be required to furnish sufficient data for the design of the proposed improvement. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. H. The OTHER PARTIES shall grant and consent to any and all permits, rights of access (ingress and egress), or temporary use of its property and right of way within the PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit for right of access and/or access, temporary use shall not be unreasonably withheld by any of the OTHER PARTIES. G. I. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016March 2018, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE XXXX XXXX, ITASCA and BENSENVILLE as hereinafter stipulated. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all that affect the PARTIES for their review and comment at the following stages stage of plan preparation: 60% Complete 95% Complete (pre-final) Final B. The final approved plans and specifications for the PROJECT improvements that affect the PARTIES shall be promptly delivered via hard copy and DVD format to the PARTIES by the ILLINOIS TOLLWAY. C. The PARTIES shall review the plans and specifications which impact the their respective PARTIES’ maintained highways and facilities within thirty (30) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval of the plans and specifications. Approval by the individual PARTY PARTIES respectively shall mean the PARTY agrees PARTIES agree with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTY's their maintained highways. In the event of disapproval, the PARTY disapproving will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Soil and Water Conservation District, DuPage County, including but not limited to the Department of Building & Zoning Department and the Division of Transportation, Illinois Environmental Protection Agency, City of Wood Xxxx, the Village of Itasca, Village of Bensenville, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.), as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project schedules and deadlines. All PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The PARTIES respectively shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its property and right of way within the PROJECT limits to the ILLINOIS TOLLWAY and/or its agentsTOLLWAY, without charge of permit fees to the ILLINOIS TOLLWAY. Any permit for right of access and/or access, temporary use shall not be unreasonably withheld by any of the PARTIESPARTY. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement

Engineering. A. The ILLINOIS TOLLWAY agrees to perform preliminary and final design engineering, obtain necessary surveys, and prepare the final plans and specifications for the PROJECT, subject to reimbursement by the VILLAGE COUNTY as hereinafter stipulated. During the design and preparation of the plans and specifications, the ILLINOIS TOLLWAY shall submit the plans and specifications to all PARTIES for their review and comment at the following stages of plan preparation: 60% Complete 95% Complete (pre-final) Final. B. The final approved plans and specifications for the PROJECT shall be promptly delivered via hard copy and DVD format to the PARTIES COUNTY by the ILLINOIS TOLLWAY. C. The PARTIES COUNTY shall review the PROJECT plans and specifications which impact the respective PARTIES’ maintained COUNTY's highways within thirty fifteen (3015) calendar days of receipt thereof. If the ILLINOIS TOLLWAY does not receive comments or objections from any respective PARTY the COUNTY within this time period, or receive a request for an extension of time, which request shall be reasonably considered, the lack of response shall be deemed approval by the COUNTY of the plans and specifications. Approval by the individual PARTY COUNTY shall mean the PARTY COUNTY agrees with all specifications in the plans, including alignment and location of the PROJECT improvements which impact the PARTYCOUNTY's maintained highwayshighways and the BRIDGES. In the event of disapproval, the PARTY COUNTY will detail in writing its objections to the proposed plans and specifications for review and consideration by the ILLINOIS TOLLWAY. D. The PARTIES shall work cooperatively to address and resolve the review comments and objections. Any dispute concerning the plans and specifications shall be resolved in accordance with Section IX of this AGREEMENT. E. The ILLINOIS TOLLWAY agrees to assume the overall PROJECT responsibility, including assuring that all permits and approvals (including but not necessarily limited to U.S. Army Corps of Engineers, Illinois Department of Natural Resources, Metropolitan Water Reclamation District of Greater Chicago, Xxxx-DuPage Du Page Soil and Water Conservation District, DuPage County, including but not limited to the Building & Zoning Department and Division of Transportation, Illinois Environmental Protection Agency, etc.) and joint participation and/or force account agreements (County, Township, Municipal, Railroad, Utility, etc.)agreements, as may be required by the PROJECT, are secured by the PARTIES hereto in support of general project PROJECT schedules and deadlines. All The PARTIES hereto agree to cooperate, insofar as their individual jurisdictional authorities allow, with the timely acquisition and clearance of said permits and agreements and in complying with all applicable Federal, State, and local regulations and requirements pertaining to work proposed for the PROJECT. F. The PARTIES In conjunction with the PROJECT, upon review and satisfaction of federal, state and local statutes, rules, regulations and ordinances, the COUNTY shall grant and consent to any and all permits, rights of access (ingress and egress), temporary use of its property and right of way within to the PROJECT limits ILLINOIS TOLLWAY, without charge to the ILLINOIS TOLLWAY and/or its agents, without charge of permit fees to by the ILLINOIS TOLLWAYCOUNTY. Any permit for right of access and/or access, temporary use shall not be unreasonably withheld by any of the PARTIESCOUNTY. G. The ILLINOIS TOLLWAY shall require all construction performed within the ILLINOIS TOLLWAY's rights of way to comply with the current Illinois Department of Transportation Standard Specifications for Road and Bridge Construction and the ILLINOIS TOLLWAY Supplemental Specifications for construction, issued April 2016, as amended, and shall require all work performed within the DEPARTMENT's rights of way to conform to the same current Standards and Specifications. H. The PROJECT is being constructed by the ILLINOIS TOLLWAY to accommodate 2030 projected traffic volumes.

Appears in 1 contract

Samples: Intergovernmental Agreement