Engines and Bilges Sample Clauses

Engines and Bilges i. Vessel Owners must use absorbent bilge pads to soak up oil and fuel in the bilge.
AutoNDA by SimpleDocs
Engines and Bilges. Absorbent bilge pads or socks must be used to soak up oil and fuel. Hazardous waste such as fuel, oil, absorbent pads, socks, rags, batteries, engine parts and other contaminated material must not be put into Marina trash receptacles or trash dumpsters. Hazardous waste must be disposed of at local Household Hazardous Waste collection sites. Detergents or emulsifiers must not be used on oil or fuel spills. Notify Dock Master of any spill that occurs.

Related to Engines and Bilges

  • Hardware and Software Requirements In order to access and retain Disclosures electronically, you must satisfy the following computer hardware and software requirements: access to the Internet; an email account and related software capable of receiving email through the Internet; a web browser which is SSL-compliant and supports secure sessions, and hardware capable of running this software.

  • Equipment and Software Requirements In order to view and retain electronic communications that we make available to you, you must have: • A PC or other device with an Internet browser that has “cookies” enabled and supports 128 bit encryption • An Internet connection • An email address • A PDF viewer (such as Adobe Reader) • A printer or computer with sufficient electronic storage space All communications shall be delivered to the last address we have on file for you. These notices will be sent through electronic delivery (email) and will be considered delivered the same day as sent. If you have opted out of electronic delivery, communications sent to you through the United States Postal Service are considered delivered 5 business days after the postmark date. It is your responsibility to notify the Custodian of any email address change or residential address change. We will not be held liable for any losses or damages if you have not provided Custodian with the most current address information. The electronically signed copy of this document should be considered equivalent to a printed hard copy form. It is considered a true and complete record of the document, admissible in arbitration and/or administrative hearings or proceedings. Your electronic signature on the Application and other electronic forms such as the Investment Direction are considered valid and the same as if the paper form or Application were signed.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Accessories, Spare Parts and Tools 1. In determining whether all the non-originating materials used in the production of a good undergo the applicable change in tariff classification or a specific manufacturing or processing operation set out in Annex 2, accessories, spare parts or tools delivered with the good that form part of the good's standard accessories, spare parts or tools, shall be disregarded, provided that:

  • Technology Requirements The Customer is required to obtain and maintain, at the Customer’s own expense, compatible Electronic Channels, hardware, operating systems, and software approved for such use by Royal Bank, and which are up-to-date and unaltered from manufacturer specifications. Royal Bank is not responsible for, and makes no representations or warranties of any nature, with respect to any such Electronic Channels, hardware, operating systems, and software provided by any other Person. Royal Bank has the right, in its sole discretion, without notice, to make changes to this Service from time to time which may result in the Customer’s Electronic Channels, hardware, operating systems, and software no longer being compatible with this Service, and in such event, Royal Bank will have no responsibility or liability to the Customer or any other Person.

  • Interface Requirements 9.3.1 BellSouth shall offer LIDB in accordance with the requirements of this subsection.

  • Fire Fighting Costs of operating and maintaining the fire-fighting equipments and personnel, if any.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

Time is Money Join Law Insider Premium to draft better contracts faster.