Entrance Hall Sample Clauses

Entrance Hall. With intercom access system, large storage cupboard and doors leading to; Bedroom 1 17'3" x 10'5" (5.26 x 3.18) Master bedroom being a double bedroom with window to fore and door leading to Ensuite. Ensuite has a wc, wash hand basin and corner shower. Bedroom 2 9'7" x 6'8" (2.93 x 2.05) Single bedroom with window to rear and Airing Cupboard.
AutoNDA by SimpleDocs
Entrance Hall. A common concept of the entrance hall of the JDE building, preserving the identity of each Committee, shall be established according to the following roadmap: A call for tenders for an architectural study shall be launched before the end of October 2015. The result of this study shall be presented before the end of March 2016. The final decision about the future arrangement of the entrance hall shall be taken after consultation of the PMG during the first half of 2016. Both Committees underline that security issues need to be seriously tackled, particularly the question of security for larger groups of visitors.
Entrance Hall. The Entrance Hall is entered through two pairs of plate glass doors fitted with stainless steel ironmongery and fittings set within the fully glazed entrance screen. Signage for the building name or occupier can be provided on the glazed screen; above the entrance doors but below the level of the canopy. The entrance has a canopy constructed from glass and steel. Parts of the steel structure are encased in anodised aluminium shaped casings. All of the steel work is finished in polyester powder coating. There is a concealed gutter which discharges into the rainwater system within the building. The pavement immediately outside the Entrance Hall is of York stone paving. The same brickwork with rustications, as used generally, returns towards the fully glazed screen. There are two pairs of entrance doors. The entrance screen is as fully glazed as practicable. There is no over door heater as the Entrance Hall is regarded as a transition zone between outside and the Reception Area. There are "heating only" fancoil units within the Entrance Hall. Three discharge over the entrance screen and three over the opening between Entrance hall and Reception Area. A matwell extends for a distance of two metres inside the line of the entrance doors. The mat incorporates natural coir set within aluminium strips and is removable for cleaning. The entire floor width ramps slightly to deal with the difference in levels between pavement and Reception Area. This way there are no steps or ramp edges nor requirements for handrails or balustrades. The York stone, bedded on a screed extends to the top of the ramp and into the Reception Area beyond. The area is heated by under floor hot water trench heating, with grilles to each side of the Entrance Hall running the entire length of the side wall, in combination with the high level fancoil units. The walls are clad full height in sealed limestone. The side walls incorporate horizontal rustications which follow Moleanos through on the lines of the external rustications. The wall through to the Reception Area incorporates similarly sized rustications both horizontally and vertically. The ceiling is of demountable plaster tiles on an exposed grid and lighting is provided by a grid pattern of Concorde metal halide downlighters. The spacing of the grid matches that of the rustications in the walls. Switches and sockets will be brushed stainless steel. There is a stainless steel fire alarm repeater panel immediately outside the entrance scr...
Entrance Hall. The entrance door opens to a spacious hallway with radiator, doors to lounge, kitchen, bedroom, bathroom and two good sized storage cupboards (one of which houses the hot water tank). Living Room

Related to Entrance Hall

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!