Equipment Labelling. Labelling of all equipment and documentation supplied is part of the works and is the responsibility of the Contractor. The relevant AKZ code shall be included on the label according to the required format, together with plant description. Labels (dimensions and colour) are to be consistent and comply with the standard Eskom specification (document no. 0.61/54385 sheets 1 to 50). Cabling should have labels made of aluminium and the lettering and numbers should be black and engraved. The cable labels must be installed on both ends of the cable. Instrument labels should be made of Graphlex. All text on labelling must be engraved. The labels should be white in colour with black text. The Contractor shall provide labelling in accordance with the “Red Zone” philosophy of Tutuka power station. The equipment and location shall be labelled by the Contractor with the required information.
Appears in 2 contracts
Samples: Nec3 Term Service Contract (Tsc3), Nec3 Term Service Contract (Tsc3)
Equipment Labelling. i. Labelling of all equipment and documentation supplied is shall be part of the works and is the responsibility scope of the Contractorsupply.
ii. The relevant AKZ code shall be is included on the label according to the required format, together with plant description. Labels labels (dimensions and colour) are to be consistent and comply with the standard Eskom Employers specification (document no. 0.61/54385 sheets 1 to 50). Cabling should have labels made of aluminium and the lettering and numbers should be black and engraved. The cable labels must be installed on both ends of the cable.
iii. Instrument labels should be made of Graphlex. All text on labelling must be engraved. The labels should be white in colour with black text. The Contractor shall provide labelling in accordance with the “Red Zone” philosophy of Tutuka power station. The equipment and location shall be labelled by the Contractor with the required informationinformation in line with IEC 60034.
Appears in 1 contract
Equipment Labelling. Labelling of all equipment and documentation supplied is part of the works and is the responsibility of the Contractor. • The relevant AKZ code shall be included on the label according to the required format, together with plant description. • Labels (dimensions and colour) are to be consistent and comply with the standard Eskom specification (document no. 0.61/54385 sheets 1 to 50). • Cabling should have labels made of aluminium and the lettering and numbers should be black and engraved. The cable labels must be installed on both ends of the cable. • Instrument labels should be made of Graphlex. All text on labelling must be engraved. The labels should be white in colour with black text. • The Contractor shall provide labelling in accordance with the “Red Zone” philosophy of Tutuka power station. • The equipment and location shall be labelled by the Contractor with the required information.
Appears in 1 contract
Samples: Nec3 Engineering and Construction Short Contract (Ecsc3)
Equipment Labelling. Labelling of all equipment and documentation supplied is shall be part of the works and is the responsibility scope of the Contractorsupply. The relevant AKZ code shall be is included on the label according to the required format, together with plant description. Labels labels (dimensions and colour) are to be consistent and comply with the standard Eskom Employer specification (document no. 0.61/54385 sheets 1 to 50). Cabling should have labels made of aluminium and the lettering and numbers should be black and engraved. The cable labels must be installed on both ends of the cable. Instrument labels should be made of Graphlex. All text on labelling must be engraved. The labels should be white in colour with black text. The Contractor shall provide labelling in accordance with the “Red Zone” philosophy of Tutuka power station. The equipment and location shall be labelled by the Contractor with the required informationinformation in line with IEC 60034.
Appears in 1 contract