Documentation Management System Sample Clauses

Documentation Management System. The contractor shall establish a document management system which is a comprehensive system for the management of documentation. The relevant documentation must be maintained and updated as changes are made until the completion of the project. Any change shall be automatically propagated through to all related documentation. “Redline” approach will be accepted during implementation phase. Two copies of the system engineering and design stage documentation for technical clarification shall be presented to the Project Manager seven working days prior to the start of the respective formal technical clarification discussions. The system engineering and design stage documentation clarify the respective plant system The Contractor will obtain the acceptance of the system engineering and design stage documentation in the form of design freeze from the Project Manager during the process of the technical clarification meetings. The Project Manager’s acceptance is a requirement for commencement of the production engineering stage of the works.
AutoNDA by SimpleDocs
Documentation Management System. A comprehensive documentation management system is provided. All documentation is maintained and updated until Completion. Any change is propagated automatically to all related documentation. All documentation forms an integral part of the documentation system. The AKZ plant position codes are identified in the documentation. AKZ codes, down to third level, are to be used. The Contractor includes the Project Manager accepted drawing head on all drawings submitted to the Project Manager. The format of all documents is submitted to the Project Manager for acceptance. Automatic prevention of duplication of numbering or ambiguity is built into the system.
Documentation Management System. The Contractor plans the supply of the documentation during the various project stages and provides the documents in accordance with the key scheduled project milestone dates. A comprehensive documentation management system is provided. The Contractor submits all documentation on a formal transmittal form in triplicate to the Project Manager. All manuals, documents and engineering documentation shall be presented in British English.

Related to Documentation Management System

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • PERFORMANCE MANAGEMENT SYSTEM 6.1 The Performance Plan (Annexure A) to this Agreement sets out – 6.1.1 The standards and procedures for evaluating the Employee’s performance; and 6.1.2 The intervals for the evaluation of the Employee’s performance. 6.2 Despite the establishment of agreed intervals for evaluation, the Employer may in addition review the Employee’s performance at any stage while the contract of employment remains in force; 6.3 Personal growth and development needs identified during any performance review discussion must be documented in a Personal Development Plan as well as the actions agreed to and implementation must take place within set time frames; 6.4 The Employee’s performance will be measured in terms of contributions to the goals and strategies set out in the Employer’s Integrated Development Plan (IDP) as described in 6.6 – 6.12 below; 6.5 The Employee will submit quarterly performance reports (SDBIP) and a comprehensive annual performance report at least one week prior to the performance assessment meetings to the Evaluation Panel Chairperson for distribution to the panel members for preparation purposes; 6.6 Assessment of the achievement of results as outlined in the performance plan: 6.6.1 Each KPI or group of KPIs shall be assessed according to the extent to which the specified standards or performance targets have been met and with due regard to ad-hoc tasks that had to be performed under the KPI, and the score of the employer will be given to and explained to the Employee during the assessment interview. 6.6.2 A rating on the five-point scale shall be provided for each KPI or group of KPIs which will then be multiplied by the weighting to calculate the final score; 6.6.3 The Employee will submit his self-evaluation to the Employer prior to the formal assessment; 6.6.4 In the instance where the employee could not perform due to reasons outside the control of the employer and employee, the KPI will not be considered during the evaluation. The employee should provide sufficient evidence in such instances; and 6.6.5 An overall score will be calculated based on the total of the individual scores calculated above.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity 1.1.02 Identify at least one individual to act as the program contact in the following areas: 1. Immunization Program Manager;

  • Financial Management System Subrecipient shall establish and maintain a sound financial management system, based upon generally accepted accounting principles. Contractor’s system shall provide fiscal control and accounting procedures that will include the following: i. Information pertaining to tuition rates, payments, and educational assistance payments; and

  • Construction Management Services a. A-E may be required to review and recommend approval of submittals, shop drawings, Request for Information (RFI) and/or calculations for temporary structures such as trench shoring, false work and other temporary structural forms. b. A-E may be required to review and advise the County Representative on the overall project schedule, including staging and completion dates, duration, milestones, and interfaces. Immediately notify Representative if the proposed work schedule does not conform to the contract documents, including the plans, specifications, and permits or that may require special inspection or testing, or work stoppage. c. Review on a monthly basis the project schedule and/or Critical Path Method (CPM) schedule submitted by the Construction Contractor. Make recommendations concerning the Construction Contractor’s adherence thereto. Recommend possible solutions to scheduling problems so as to complete the project on time, within budget, and in accordance with the contract drawings and specifications. d. Review scope of work and identify potential contract change orders. Prepare independent cost estimates for any changes resulting from design revisions or change in field conditions. Prepare and recommend for approval all contract change orders. e. Evaluate the merit of any potential claims or requests for equitable adjustment submitted by the Construction Contractor. Prepare analysis of potential claims include recommendations regarding settlement of the claims. f. Assist County staff in project related issues with other Agencies, or departments, engineering and material testing support firms, CEQA consultants, utilities agencies, etc. g. Assist in community outreach meetings and media relations h. Review for acceptance/approval of Storm Water Pollution Prevention Plan (SWPPP) in accordance with the general Permit of Discharges of Storm Water Associated with Construction Activity (Construction General Permit, including dewatering/diversion plans per the State’s DeMinimus Permit).

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Information Management Information and Records

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following: