Technical Details. The type and construction of junction boxes shall be subject to the Employer's approval.  Mounting plate  Number of terminals is dependent on cable configuration. Terminals are on DIN rail with end stops and end plates. All terminals must be numbered top and bottom from left to right.  Screen bar  Separate removable gland plate on the bottom.  Glands  Cable trunking at the bottom and the top and at least one side.  Any additional equipment to make a complete assembly.  Powder coated 3CR12 stainless steel.  IP65 degree of protection All cables shall be glanded with suitable compression glands, as far as possible to the back of the gland plate, without affecting the IP65 rating. Provision of spare cores for future expansion shall be made, 25% of the installed base. The Contractor shall familiarise himself with the plant areas and environmental conditions and provide alternative solutions where environmental conditions require higher protection. The Contractor shall label junction boxes in accordance with Employer’s system.
AutoNDA by SimpleDocs
Technical Details. Technical details for the Pseudo-Tie are outlined in Appendix 1 to this Agreement. The Company shall maintain the Facility and its operations consistent with the specifications in Appendix 1 for the duration of the Agreement. Failure to maintain and operate the Facility consistent with the specifications outlined in Appendix 1 will be cause for suspension of the Agreement pursuant to section 11 below.
Technical Details. The technical details of the visit to our site (domain analysis) are registered by us. We use this data for statistical purposes.
Technical Details. When submitting its tender, the Tenderer shall include all of the necessary documents describing the technical performance of its contract, the applicable methods and systems and the resources to be used, in so far as these have not been specified in the Technical Provisions.
Technical Details. (A) At Customer’s expense, APS will provide, operate and maintain an RTU. Customer shall install the RTU enclosure as provided by APS, and APS will install and program the RTU. Customer shall provide a 120 VAC, 15 Amp (minimum) power supply to the RTU, and shall install 2” rigid metallic conduits for all required circuits associated with the RTU. The 120VAC/15A circuit must be from a dedicated feed upstream from the Generator breaker, so it remains energized in the event the Generator breaker is open. The RTU and associated equipment installed at the GF must be located at a Readily Accessible location (available 24 hours) for APS personnel. For all PPA/Customer Owned GF, the dedicated 120 VAC circuit shall not be backed up via Customer provided UPS. (B) The RTU will be housed in an enclosure along with an appropriate communication device (e.g. fiber converter, or modem as specified by APS), and battery backup system. The RTU enclosure typically measures 36”X30”X10”, and is a NEMA 3R outdoor rated cabinet. Additional RTUs may be required if a single RTU cannot be located in the immediate vicinity of the SES and any required metering on the generation output. The top of the RTU cabinet shall not exceed more than 6’ from final grade. (C) Customer is responsible for securing a communication path back to the APS communication system (e.g. fiber optic back to APS Substation). In the event the communication path is disrupted for any reason, Customer is responsible for remedying the issue. In some instances, APS may provide a communication path back to the APS communication system via a MAS radio. Customer will be responsible for all associated costs, and shall also provide a location to install antennas tall enough to provide line of sight from the MAS radio antenna to APS communication towers in the area. (D) In the case the communication system located at the APS Substation (or designated APS location) communicating back to the APS EMS system cannot support the additional data points, Customer will be responsible for upgrading the communication path. The cost of any communication upgrades, and the monthly service fee will be passed on to Customer. (E) Equipment and means of completing the communication path will be determined by APS and communicated to Customer during the Interconnection Study process (refer to Section 16.7). (F) Customer will provide, install and maintain Generator breaker control circuitry (“Breaker Control Scheme”) that will accept two remot...
Technical Details. 20.1 The technical details of the Renewable Energy Generating System and the technical details of its interconnection with the network of RInfra, along with the Single Line Diagram of the same are included in Annexure – 1, attached hereto.
Technical Details. 8.1 EEX AG reserves the right to utilize any of the available connectivity channels and file formats specified by the competent authorities.
AutoNDA by SimpleDocs
Technical Details. AUTHORIZED LOAD ON THE FLOORS - 350Kg/m2 on each floor's floor, including walls - 250Kg/m2 on the floor of the archives - 250Kg/m2 on the parking level
Technical Details. All the reports, data, comments and additional information from the partners should be sent to the WP3 leader in English and in Word (.docx) format, unless otherwise stated.
Technical Details. BSNL will develop advanced solution for ULBs using latest web and mobile technologies in such a manner so that its quickly implementable, easily configurable, modular, flexible to adopt changes, scalable and cost effective. The solution will broadly comprise of following: