Equipment, Rearing Units, and Transport Vessels Sample Clauses

Equipment, Rearing Units, and Transport Vessels. Equipment used to transfer eggs or fish between Fish Health Management Zones (FHMZ) including fish transfer vessels will be sanitized before being used for any other transport. In addition, it is recommended that all equipment and transport vessels be sanitized after gametes, eggs or fish are transferred to another watershed. Rearing units should be cleaned regularly and the waste disposed of in a way to prevent its discharge into State waters. Rearing units will be thoroughly cleaned in the following situations: ÐBefore introducing a new fish stock into a rearing unit that had previously contained a fish stock that experienced a disease epizootic. ÐBefore introducing a fish stock that will be reared in isolation on RPF water until their transfer or release. Acceptable cleaning methods for rearing units with hard surfaces include, but are not limited to, pressure washing followed by using an approved disinfectant or by leaving it dry for a minimum of 24 hours. The acceptable minimum cleaning method for earthen ponds is to drain them and leave them dry for a minimum of 72 hours. Mortality Removal: Mortalities should be removed from rearing units on a regular basis wherever possible. Mortalities that are removed must be disposed of in a way that prevents their discharge into State waters. Acceptable methods include, but are not limited to, burial, composting, or rendering. Information required for gamete or egg transfers:
AutoNDA by SimpleDocs
Equipment, Rearing Units, and Transport Vessels. Equipment used to transfer gametes, eggs, or fish between Fish Health Management Zones (Appendix 8.3) including fish transfer vessels will be sanitized before being used for any other transport. In addition, it is recommended that all equipment and transport vessels be sanitized after gametes, eggs, or fish are transferred to another watershed • Rearing units will be cleaned regularly whenever and wherever possible and the waste disposed of in a way to prevent its discharge into State waters • Rearing units will be thoroughly cleaned in the following situations: ¦ Before introducing a new fish lot into a rearing unit that had previously contained a fish lot that experienced a disease epidemic ¦ Before introducing a fish lot that will be reared in isolation on regulated pathogen free water until their transfer or release Acceptable cleaning methods for rearing units with hard surfaces include, but are not limited to, pressure washing followed by either using an approved disinfectant or by leaving it dry for a minimum of 24 hours. The acceptable minimum cleaning method for earthen ponds is to drain them and leave them dry for a minimum of 72 hours.

Related to Equipment, Rearing Units, and Transport Vessels

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • DELIVERY TERMS AND TRANSPORTATION CHARGES Deliverables shall be shipped F.O.B. point of delivery unless otherwise specified in the Supplemental Terms and Conditions. Unless otherwise stated in the Offer, the Contractor’s price shall be deemed to include all delivery and transportation charges. The City shall have the right to designate what method of transportation shall be used to ship the deliverables. The place of delivery shall be that set forth the purchase order.

  • Horizontal Movement The Board encourages all unit members to improve their skills through advanced training and, as an inducement thereto, provides extra compensation for those who do so successfully. The Board delegates to the Superintendent the responsibility for assuring that unit members comply with the following regulations when claiming credit for advanced studies.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

Time is Money Join Law Insider Premium to draft better contracts faster.