Exam Sheet Sample Clauses

Exam Sheet. The part of the Exam Agreement which indicates: the qualification, the code of the qualification (XXXXX), the learning pathway, the level and the date from which the Exam Participant can make use of the examination facilities.
AutoNDA by SimpleDocs

Related to Exam Sheet

  • MFMP Transaction Fee Reports The Contractor shall submit complete monthly MFMP Transaction Fee Reports to the Department. Reports are due 15 calendar days after the end of each month. Information on how to submit MFMP Transaction Fee Reports online can be located at xxxxx://xxx.xxx.xxxxxxxxx.xxx/business_operations/state_ purchasing/myfloridamarketplace/mfmp_vendors/transaction_fee_and_reporting. Assistance with transaction fee reporting is also available by email at xxxxxxxxxxxxx@xxxxxxxxxxxxxxxxxxxx.xxx or telephone at 866-FLA-EPRO (866-352- 3776) from 8:00 a.m. to 6:00 p.m. Eastern Time.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Site Memorandum The Design Professional agrees to comply fully with the requirements of the attached Exhibit F, Site Memorandum. The Design Professional agrees to notify the Owner, at once and in any event within ten calendar days after execution of this Contract, of the amount of money the Owner should budget in order to cover costs identified in the Site Memorandum. The Design Professional agrees that, without cost to the Owner, the Design Professional shall make such proper and reasonable changes in the Site Plan and preliminary foundation design that are either necessary or desirable as required by the Stage One statement and subsequent investigation by the geotechnical engineer (see Subparagraph 1.1.2.6.3) obtained pursuant to the Site Memorandum. All information should be incorporated into the final Site Plan and final foundation design for the Stage Two statement. The Design Professional shall file copies with the Owner and accompany them with a current Statement of Probable Construction Cost, in the format shown in the Forms Packet, as a part of the next submittal required by this Contract. (See ASTM Standard Practice E 1804-02, August 2002, Section 8.4 for guidance on information which is generally developed in site development documents.)

  • Construction Schedules 10.1 Within seven (7) days of the University’s issuance of a purchase order, the Contractor shall submit to the Project Coordinator three (3) copies of a Construction Schedule for this Project. The Schedule shall be in bar chart form and shall include all aspects of the work, the interrelationship of the various trades and the critical path of the job. The schedule shall include a timeline for the submission, review and approval of shop drawings for critical path items and delivery and installation dates for those same critical path, or long lead time items, (such as electrical transformers and elevator). The Schedule shall coincide with the Contractor’s approved Schedule of Values. The Schedule shall indicate a completion date in advance of the date established for Substantial Completion. The Schedule shall be acceptable to the Architect/Engineer and the Project Coordinator. It shall be revised and reissued at the beginning of every month for the duration of the project. This monthly update progress Schedule shall include a summary comparison of the original schedule and the latest updated schedule (previous month) showing all activity description and dates. These comparison schedules shall be in the form of a summary bar chart, an activity listing report and actual to target comparisons. The reports may include critical activities, float time, duration of each activity, dates of each activity and the network logic (including successors and predecessors of each activity). Included with the written report and electronic copy of the schedule submission noting the above referenced requirements. Failure to provide the Architect/Engineer, or the Project Coordinator with an acceptable, revised Schedule, within seven (7) days of the receipt of a written request, may result in the withholding of the Contractor’s monthly progress payments until such a Schedule is received.

  • Offering Circular The Xxxxxxx Mac STACR® Debt Notes, Series 2015-HQ2 Offering Circular dated June 2, 2015 (including any related Supplement thereto).

  • Evaluation Schedule CLIENT REFERENCES The Tenderer shall provide details of his performance on each of the previous projects listed in the “Relevant Experience” returnable schedule. “Client Reference Scorecards” will be completed by each of the respective Clients for the projects listed in the “Relevant Experience” returnable schedule. The following are to be completed by the Client and Principal Agent and is to be supported in each case by a letter of award and the works completion certificate. Both Client and Principal Agent must sign and stamp the documents, failure to obtain both signatures and stamps will result in no allocation of points. PROJECT NAME and SCOPE OF WORK: Principal agent: ................................................................................................................................. Client: .. ..............................................................................................................................................

  • GRIEVANCE REPORT FORM Grievance # School District Distribution of Form 1. Superintendent

  • Disclosure Statement for Xxxx IRAs 1. Am I Eligible to Contribute to a Xxxx XXX? Anyone with compensation income whose Modified Adjusted Gross Income (AGI) does not exceed the limits described below is eligible to contribute to a Xxxx XXX. (For convenience, all future references to compensation are deemed to mean “earned income” in the case of a self- employed individual.) Employers may also contribute to Xxxx IRAs established for the benefit of their employees. You may also establish a Xxxx XXX to receive rollover contributions or transfers from another Xxxx XXX or, in some cases, from a Traditional IRA. A Qualified Rollover Contribution can be made to a Xxxx XXX and is a distribution from an IRA that meets the requirements of section 408(d)(3), a rollover from a designated Xxxx account described in section 402A, or a rollover from an eligible retirement plan as described in section 402(c)(8)(B).

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • LEAD WARNING STATEMENT Housing built before 1978 may contain lead-based paint. Lead from paint, paint chips, and dust can pose health hazards if not managed properly. Lead exposure is especially harmful to young children and pregnant women. Before renting pre-1978 housing, lessors must disclose the presence of lead-based paint and/or lead-based paint hazards in the dwelling. Student must also receive a federally approved pamphlet on lead poisoning prevention. That pamphlet is available at xxxx://xxx0.xxx.xxx/lead/protect-your-family-lead-your-home-1

Time is Money Join Law Insider Premium to draft better contracts faster.