Construction Schedules. Construction Manager shall incorporate the relevant portions of the Project Schedule, into its Construction Schedules. Construction Manager shall include with its Estimated Contract Sum preliminary Construction Schedules for Owner Parties’ review. After Owner approves the Project budget, Construction Manager shall update and distribute with the Progress Report its approved Construction Schedules throughout the duration of the Work. Each such updated Construction Schedule shall conform to the Contract Documents’ requirements and shall accurately reflect progress and remaining estimated durations of applicable Work.
Construction Schedules. 10.1 Within seven (7) days of the University’s issuance of a purchase order, the Contractor shall submit to the Project Coordinator three (3) copies of a Construction Schedule for this Project. The Schedule shall be in bar chart form and shall include all aspects of the work, the interrelationship of the various trades and the critical path of the job. The schedule shall include a timeline for the submission, review and approval of shop drawings for critical path items and delivery and installation dates for those same critical path, or long lead time items, (such as electrical transformers and elevator). The Schedule shall coincide with the Contractor’s approved Schedule of Values. The Schedule shall indicate a completion date in advance of the date established for Substantial Completion. The Schedule shall be acceptable to the Architect/Engineer and the Project Coordinator. It shall be revised and reissued at the beginning of every month for the duration of the project. This monthly update progress Schedule shall include a summary comparison of the original schedule and the latest updated schedule (previous month) showing all activity description and dates. These comparison schedules shall be in the form of a summary bar chart, an activity listing report and actual to target comparisons. The reports may include critical activities, float time, duration of each activity, dates of each activity and the network logic (including successors and predecessors of each activity). Included with the written report and electronic copy of the schedule submission noting the above referenced requirements. Failure to provide the Architect/Engineer, or the Project Coordinator with an acceptable, revised Schedule, within seven (7) days of the receipt of a written request, may result in the withholding of the Contractor’s monthly progress payments until such a Schedule is received.
Construction Schedules. Design-Builder shall prepare and update Construction Schedules in accordance with Section 5.13 below.
Construction Schedules. DOCUMENTS AND SAMPLES AT THE SITE 3.17 MANUFACTURER’S SPECIFICATIONS
Construction Schedules. Design/Builder shall submit an initial Construction Schedule by the date set forth on Exhibit E; a final Construction Schedule with the Guaranteed Maximum Price proposal; and revised Construction Schedules in accordance with the Design/Build General Terms and Conditions.
Construction Schedules. Design-Builder shall incorporate the relevant portions of the Project Schedule, into its Construction Schedules. After Owner approves a Pricing Amendment, Design- Builder shall update and distribute with the Progress Report its approved Construction Schedule for that Work. Each such updated Construction Schedule shall conform to the Contract Documents’ requirements and shall accurately reflect progress and remaining estimated durations of applicable Work.
Construction Schedules. As part of GMP, XXXX shall submit to Owner for Owner’s review an initial job progress schedule. Once the Notice to Proceed is issued, the Construction Schedule shall be updated to reflect the Contract Time as defined in the Agreement. Unless a specific software application is called for elsewhere in the Contract Documents, XXXX shall use Microsoft Project, SureTrak Project Manager, Primavera Project Planner, or other scheduling software acceptable to Owner to configure all versions of its job progress schedule. XXXX shall prepare the Construction Schedule using the critical path format. Schedule activities shall be of sufficient detail to assure that adequate planning has been done for proper execution of all of XXXX’x work. The job progress schedule shall show the sequence, duration, and interdependence of activities required for the complete performance of all of XXXX’x work. XXXX shall include on the Construction Schedule the schedule for submittals, shop drawings, procurement, fabrication, and delivery for major materials and equipment required for the Project, and shall allow no less than 21 days for Owner’s review of each such submittal. After XXXX’x initial Construction Schedule is accepted by Owner, it will be designated as the “Accepted Construction Schedule”. An Accepted Construction Schedule is a condition precedent to Owner’s obligation to make the initial progress payment to XXXX.
Construction Schedules. These articles are further amplified by Sections 013523 (Safety), 014300/014500 (Quality Assurance/Control) and 013200 (Planning and Scheduling) of the Owner’s Division 1 Specifications.
Construction Schedules. A. The Contractor, promptly after receipt of the Award Letter, shall prepare and submit to the Owner, for approval, a construction schedule for the Work. The Construction Schedule, as approved, shall not exceed the time limits provided in the Contract Documents, shall be revised at appropriate intervals as required by conditions of the Work and the Project, shall be related to the entire Project to the extent required by the Contract Documents and shall provide for the expeditious execution of the Work within the Contract Period.
B. The Contractor shall prepare and keep current, for the Owner's review and approval, a schedule of submittals which is coordinated with the Construction Schedule and is maintained both on the job site and available for the Owners review.
Construction Schedules. 3.15.1 Upon receipt of a Notice to Proceed, XXXX shall promptly prepare and submit a construction schedule for the Work for Director's review. The schedule must reflect the minimum time required to complete the Work not to exceed Contract Time. The Director will define what project management/scheduling software systems will be employed for execution of the Work. XXXX shall make its own arrangements to produce his schedule using the same or approved compatible software. XXXX shall be responsible for assuring that all work, including all subcontractor work, is included in the schedule. XXXX shall be responsible for assuring that all work sequences are logical and that the schedule indicates a coordinated plan. At a minimum, the schedule shall provide information on the sequence of work activities, interdependence of activities, milestone dates and activity duration. XXXX shall maintain the work schedule and provide an update and analysis of the progress on a monthly basis, with the monthly billing. Submission of the work schedule shall not relieve XXXX of overall responsibility for scheduling sequencing and coordinating all work to comply with the requirements of the contract.
3.15.2 XXXX shall give 24-hour written notice to Director before commencing work or resuming work where work has been stopped. XXXX shall also give the same notice to inspectors.
3.15.3 XXXX shall incorporate milestones specified in Summary of Work Specification into the construction schedule. XXXX'x failure to meet a milestone, as determined by Director, may be considered a material breach of the Contract.
3.15.4 Each month, XXXX shall submit to Director a copy of an updated construction schedule indicating actual progress, incorporating applicable changes, and indicating courses of action required to assure completion of the Work within Contract Time.
3.15.5 XXXX shall keep a current schedule of all submittals that correlates with the construction schedules, and shall submit the initial schedule of submittals and any subsequent changes to Director for approval.