Excavation at Road Crossings Sample Clauses

Excavation at Road Crossings. The excavation of trenches in all types of roads including dismantling of asphalt / all type of tiles / CC and WBM shall be done up to a depth such that the top of the RCC pipe Is 1.0 meter below the normal ground level. After excavation of trench, RCC Pipes of 100mm/ 150mm/225mm /300mm dia shall be laid at the road crossings. The roads, which are broad, may be opened for half their width, allowing the other half for use of vehicular traffic. The second half of the width should be opened after laying pipes and reinstating the first half of the trench. Pipes laid in the second half should be coupled firmly with those laid in the first half. Care must be taken to couple the pipes fully. The pipes should be laid with a slight slope from the center to the sides of the road to prevent collection of water. 8 mm PP Rope shall be drawn through the laid pipes to facilitate cleaning and cable pulling at a later date before closing the trench. As the work on road crossings entails lot of inconvenience to vehicular traffic and pedestrians, it is desirable to bury extra pipes for future expansion at the initial stage itself. The spare pipes must be sealed properly at both the ends of the road to obviate the possibility of pipe getting chocked due to settlement of sedimentation etc. The Vendor shall have to provide shoring, wherever necessary, in case the depth of trench is more than one meter. Necessary barricades, night lamps, warning boards and required watchman shall be provided by the Vendor to prevent any accident to pedestrians or vehicles.
AutoNDA by SimpleDocs

Related to Excavation at Road Crossings

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Crossing of Picket Lines 15 Employees in the bargaining unit, while acting in the course of their employment, 16 shall not refuse to cross any picket line established by any labor organization when called 17 upon to cross such picket line in the line of duty. It is understood, however, that no 18 employee shall be disciplined or discharged for refusal to cross a picket line:

  • Firefighters Any truck with an inoperative aerial ladder shall be regularly and routinely staffed with one (1) officer and five (5) firefighters for the period of time that the aerial ladder is inoperative, or until such time as the truck with the inoperative aerial ladder is replaced with a truck with an operative aerial ladder. At 0800 and 2000 hours, all trucks shall be staffed with one (1) officer and four (4) firefighters, and any truck with an inoperative aerial ladder shall be staffed with one (1) officer and five (5) firefighters.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Network Resource Interconnection Service (check if selected)

  • Seat Belt Use The Recipient agrees to implement Executive Order No. 13043, “Increasing Seat Belt Use in the United States,” April 16, 1997, 23 U.S.C. § 402 note, (62 Fed. Reg. 19217), by:

Time is Money Join Law Insider Premium to draft better contracts faster.