EXPLANATION OF DRAWINGS Sample Clauses

EXPLANATION OF DRAWINGS. 1.2.1 These construction documents are intended to be diagrammatic and reflect the scope, quality, and character of the work to be performed; all miscellaneous materials and work, though not specifically mentioned, shall be furnished and installed by the Contractor. 1.2.2 The Contractor shall confirm sizes, dimensions, weights and locations of all equipment prior to installation. Dimensioned architectural drawings shall take precedence over diagrammatic layouts shown on these contract documents. 1.2.3 The specifications and the drawings are an integral document and shall be considered complementary to each other. In the case of a conflict between the specifications and the drawings, the more constricting condition shall be enforced. 1.2.4 The Contractor shall be responsible for reporting any discrepancies, errors, or omissions noted prior to bid. 1.2.5 It is the intent of the drawings to indicate schematic routing and placement of devices, fixtures, equipment and conduit. Exact locations shall be dimensioned on these documents or in other trade documents (architectural, mechanical, etc.). Offsets, elbows, or extensions shall be furnished and installed by the Contractor as necessary to avoid structure, piping, clearances and to provide a complete and workmanlike installation.
AutoNDA by SimpleDocs

Related to EXPLANATION OF DRAWINGS

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Explanatory Note The explanatory note prepared in accordance with clause 25E of the Regulation must not be used to assist in construing this document.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Determinations to Honor Drawing Requests In determining whether to honor any request for drawing under any Letter of Credit by the beneficiary thereof, the Issuing Lender shall be responsible only to determine that the documents and certificates required to be delivered under such Letter of Credit have been delivered and that they comply on their face with the requirements of such Letter of Credit.

  • Determination to Honor Drawing Request In determining whether to honor any request for drawing under any Letter of Credit by the beneficiary thereof, Agent shall be responsible only to determine that the documents and certificates required to be delivered under such Letter of Credit have been delivered and that they comply on their face with the requirements of such Letter of Credit and that any other drawing condition appearing on the face of such Letter of Credit has been satisfied in the manner so set forth.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Explanatory Notes (a) The references to "contracting party" in the provisions of GATT 1994 shall be deemed to read "Member". The references to "less-developed contracting party" and "developed contracting party" shall be deemed to read "developing country Member" and "developed country Member". The references to "Executive Secretary" shall be deemed to read "Director-General of the WTO". (b) The references to the CONTRACTING PARTIES acting jointly in Articles XV:1, XV:2, XV:8, XXXVIII and the Notes Ad Article XII and XVIII; and in the provisions on special exchange agreements in Articles XV:2, XV:3, XV:6, XV:7 and XV:9 of GATT 1994 shall be deemed to be references to the WTO. The other functions that the provisions of GATT 1994 assign to the CONTRACTING PARTIES acting jointly shall be allocated by the Ministerial Conference. (i) The text of GATT 1994 shall be authentic in English, French and Spanish. (ii) The text of GATT 1994 in the French language shall be subject to the rectifications of terms indicated in Annex A to document MTN.TNC/41. (iii) The authentic text of GATT 1994 in the Spanish language shall be the text in Volume IV of the Basic Instruments and Selected Documents series, subject to the rectifications of terms indicated in Annex B to document MTN.TNC/41. (a) The provisions of Part II of GATT 1994 shall not apply to measures taken by a Member under specific mandatory legislation, enacted by that Member before it became a contracting party to GATT 1947, that prohibits the use, sale or lease of foreign-built or foreign-reconstructed vessels in commercial applications between points in national waters or the waters of an exclusive economic zone. This exemption applies to: (a) the continuation or prompt renewal of a non-conforming provision of such legislation; and (b) the amendment to a non-conforming provision of such legislation to the extent that the amendment does not decrease the conformity of the provision with Part II of GATT 1947. This exemption is limited to measures taken under legislation described above that is notified and specified prior to the date of entry into force of the WTO Agreement. If such legislation is subsequently modified to decrease its conformity with Part II of GATT 1994, it will no longer qualify for coverage under this paragraph. (b) The Ministerial Conference shall review this exemption not later than five years after the date of entry into force of the WTO Agreement and thereafter every two years for as long as the exemption is in force for the purpose of examining whether the conditions which created the need for the exemption still prevail. (c) A Member whose measures are covered by this exemption shall annually submit a detailed statistical notification consisting of a five-year moving average of actual and expected deliveries of relevant vessels as well as additional information on the use, sale, lease or repair of relevant vessels covered by this exemption. (d) A Member that considers that this exemption operates in such a manner as to justify a reciprocal and proportionate limitation on the use, sale, lease or repair of vessels constructed in the territory of the Member invoking the exemption shall be free to introduce such a limitation subject to prior notification to the Ministerial Conference. (e) This exemption is without prejudice to solutions concerning specific aspects of the legislation covered by this exemption negotiated in sectoral agreements or in other fora.

  • Selection of Architect/Construction Drawings Landlord shall retain, on behalf of Tenant, FPBA Architects (the “Architect”) to prepare the “Construction Drawings,” as that term is defined in this Section 3.1. Landlord shall retain, on behalf of Tenant, engineering consultants and/or design-build consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing and HYAC work of the Improvements and any relevant components of the Landlord Work. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the “Construction Drawings.” All Construction Drawings shall comply with the drawing format and specifications as determined by Landlord, and shall be subject to Landlord’s approval as more particularly set forth in Sections 3.2 and 3.3, below. Notwithstanding Landlord’s retention of the Architect and Engineers, Tenant shall be responsible for, and shall fully cooperate and coordinate in good faith with Landlord, the Architect and the Engineers to supply all of the necessary information within Tenant’s possession to allow the Architect and the Engineers to initially prepare and then complete, the Construction Drawings. Landlord hereby agrees (at no cost to Landlord) to cooperate, on a commercially reasonable basis, with Tenant to assist Tenant in the preparation of the Construction Drawings. Landlord’s review of the Construction Drawings applicable to the Improvements (as opposed to Landlord Work) and as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Improvement-related portions of such Construction Drawings are reviewed by Landlord, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in such portions of the Construction Drawings, and Tenant’s waiver and indemnity set forth in this Lease shall specifically apply to such portions of the Construction Drawings.

  • Explanation of Variable Rates If the Prime Rate increases, variable APRs (and corresponding DPRs) will increase. In that case, you may pay more interest and may have a higher Minimum Payment Due. When the Prime Rate changes, the resulting changes to variable APRs take effect as of the first day of the billing period. The Daily Periodic Rate (DPR) is 1/365th of the APR, rounded to the nearest one ten-thousandth of a percentage point. The variable penalty APR will not exceed 29.99%. How Rates and Fees Work

  • Final Working Drawings Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Tenant shall cause the approved Final Space Plan to be converted by the Architect and the Engineers to complete architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits (collectively, the “Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord’s receipt of the Final Working Drawings for the Premises if the same is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall immediately revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith. Landlord and Tenant acknowledge that the Final Space Plans may not depict certain structural elements of the Building and/or various elements of the Building systems which may result in material modifications to the Final Working Drawings (“Space Plan Modifications”) Furthermore, the Final Space Plans for the construction of the Tenant Improvements may require modification to account for the requirements of building codes and other legal requirements of applicable governmental entities, including, but not limited to, Title 24 and the Americans with Disabilities Act (collectively the “Building Codes”). The Final Working Drawings shall materially conform to the Final Space Plans, taking into account (i) Space Plan Modifications, (ii) the requirements of the Building Codes, (iii) other modifications resulting from physical constraints of the Premises and (iv) modifications requested by Tenant and consented to by Landlord, which consent shall not be unreasonably withheld. Tenant agrees that, in addition to other factors and considerations Landlord may take into account, it shall not be unreasonable for Landlord to withhold its consent to any matters set forth in the Final Working Drawings and not contained in the Final Space Plans, (i) if such requested modifications would not comply with the Building Codes or any laws, (ii) subject to Section 7 if such requested modifications would cause the anticipated cost of the Tenant Improvements to exceed the Tenant Improvement Allowance (unless Tenant agrees to be responsible for all such costs, and provide evidence satisfactory to Landlord of Tenant’s ability to pay such amounts, including escrow the funds if required by Landlord), (iii) if such requested modifications would not increase the value of the Tenant Improvements, (iv) if such requested modifications would increase the burden on the Building systems, either during construction or after completion of same.