Exterior Finishes. Exterior finishes of Affordable Units will be substantially similar to the appearance, finish and durability of the exterior finishes of the Market-Rate Units.
Exterior Finishes. The Contractor acknowledges the requirement to comply fully with the Meccema (2) Design and Development Rules and Town Planning Controls in all respects. 1.7
Exterior Finishes. All Affordable Housing Units shall be comparable in exterior design, materials, and finishes to the Market-Rate Units.
Exterior Finishes. A. Acceptable exterior finishes for:
1. Stops are:
a. steel;
b. concrete;
c. glass;
x. xxxx;
e. standing seam metal roof or mullion-less structural silicone glazing roof;
f. masonry, limited to the Xxxxx Farms Stop Operator washroom; and
g. metal privacy screen, limited to the XxxXxxxx Stop.
2. Stations are:
a. steel;
b. concrete;
c. metal panels;
d. glass;
e. solar shade screens;
f. thermoplastic polyolefin (TPO) roof; and
x. xxxx;
3. Utility Complex enclosures are:
a. pre-cast brick panels; b. metal panels, limited to the 87 Avenue/165 Street Utility Complex and the 107 Street/104 Avenue Utility Complex; c. metal louvres, limited to the 87 Avenue/165 Street Utility Complex; d. pre-cast concrete, limited to the 87 Avenue/165 Street Utility Complex, Xxxxxx Square Utility Complex and the 107 Street/104 Avenue Utility Complex; e. stucco, limited to the 000 Xxxxxx/000 Xxxxxx Xxxxxxx Xxxxxxx;
Exterior Finishes. All structures within the development shall use durable materials on exterior finishes, including brick, stone, Hardie board, architectural metal, or engineered wood on all four (4) of the building’s facades. Aluminum or vinyl siding shall not be used as an exterior finish. Exterior finishes shall be substantially similar to Exhibit C.
Exterior Finishes. LifeBrite® Outdoor Lantern Exterior Finish: As long as the original consumer purchaser or commercial purchaser owns the lantern. This warranty does not cover damage caused by chemicals and harsh cleaners. • Climates® Outdoor Lantern and Fan Exterior Finish: Six (6) years from the date of purchase. This warranty does not cover damage caused by chemicals and harsh cleaners.
Exterior Finishes. No samples of the exterior finishes and associated materials and equipment were collected during the survey to avoid damaging the finishes and associated materials and equipment. Any such materials and equipment shall be considered asbestos-containing until proven otherwise by bulk sampling and analysis.
Exterior Finishes. The exterior of the building, with the exception of the office component of the building, shall be of tilt-up concrete construction. Design of the exterior of the facility shall include not more than five linear, horizontal, chamfered reveal strips not greater than 0.5 inches deep and 3 inches wide. The exterior finish of the building shall include an exterior painting system specified for concrete tilt-up construction, which shall not exceed three (3) colors designated by Weider and reasonably agreed to by SCI. The office area of the building is intended to be of steel structural stud, synthetic plaster, exterior insulation construction ( "Dryvit" or "EIFS") with banded glazing. The Building Shell shall be limited to the wall and roof structure and exterior finishes only. All interior finishes in the office component of the project shall be part of the Tenant Improvements. Except as otherwise noted, the fire suppression system shall be part of the Building Shell. The fire suppression system in the warehouse area shall be an ESFR sprinkler system designed and installed in accordance with NFPA, UBC and local ordinances. If required by law, the fire suppression system in the production areas may incorporate ELO (extra large orifice) heads. The type of commodity to be stored in the warehouse area of this facility is of Type 4. All fire hose cabinets and portable fire extinguishers required under NFPA, UBC and local ordinance shall also be provided as a component of the shell building. Any underground fire line and associated hydrants that are required to be placed on-site shall be part of the Building Shell. If required to deliver and maintain 75 psi system static pressure for the ESFR system, a pump system (including more than one pump if required) will be a Tenant Improvement cost. Those portions of the fire suppression system directly attributable to the Tenant Improvements shall be charged against the Tenant Improvements.
Exterior Finishes. Wall finish of a suitable nature and of appropriate material, having a finished, high quality appearance and decorative quality as designed by Xxxxxxxx's architect.
Exterior Finishes. When the scope of work includes repair or replacement of exterior finishes, the following standards shall apply.
1. All exterior finishes shall be free of holes, loose material, peeling paint, deterioration, mold, dirt, or other defective conditions.
2. All trims and soffits shall be constructed to resist the entry of insects or vermin into concealed spaces of the structure.