Fill Placement and Compaction Sample Clauses

Fill Placement and Compaction. A. Required compaction densities shall be specified as percentages of maximum dry densities obtained from standard xxxxxxx laboratory tests in accordance with ASTM D698 (Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort). B. Prior to placing any fill, the excavation base shall be scarified to a minimum depth of 150 mm and compacted to a minimum of 95 percent of the standard xxxxxxx maximum dry density, as determined by ASTM D698. C. Place backfill material in uniform lifts not exceeding 150 mm compacted thickness up to the grades indicated on the Final Design. Compact each lift before placing the subsequent lift. D. Compact each lift to the minimum requirements specified in the Valley Line West LRT Roadways Design and Construction Standards, or to higher densities as specified by the Engineer of Record based on Good Industry Practice. Under no circumstances shall the compacted field density be less than 98 percent of the standard xxxxxxx maximum dry density. E. Backfill material shall be compacted at moisture contents within  2 percent of the optimum moisture content, as determined from standard xxxxxxx laboratory tests in accordance with ASTM D698.
AutoNDA by SimpleDocs

Related to Fill Placement and Compaction

  • Scope and Order Placement These terms may be used by Customer either for a single Order or as a framework for multiple Orders. In addition, these terms may be used on a global basis by the parties’ “Affiliates”, meaning any entity controlled by, controlling, or under common control with a party. The parties can confirm their agreement to these terms either by signature where indicated at the end or by referencing these terms on Orders. Affiliates participate under these terms by placing orders which specify product or service delivery in the same country as the HP Affiliate accepting the Order, referencing these terms, and specifying any additional terms or amendments to reflect local law or business practices.

  • Placement of DNS probes Probes for measuring DNS parameters shall be placed as near as possible to the DNS resolvers on the networks with the most users across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • BUYER'S FACILITIES 1. Buyer will maintain at its own expense facilities from the delivery point to the point of use and the burners and equipment for using gas, and Buyer will at all times keep gas-using equipment on said premises in a condition conforming with such reasonable rules and regulations as may be prescribed therefore by regulatory authority having jurisdiction thereover and with the requirements of any valid law thereto appertaining. In the event that rules are not prescribed by a regulatory authority, Buyer will abide by codes as used in the gas industry. 2. Seller shall not approve sale of gas on an interruptible basis to Buyer until and unless Seller is satisfied that Buyer has, or will, install adequate stand-by facilities to meet its full fuel requirements during periods of sustained interruptions. 3. Seller shall not approve sales of gas to Buyer unless Seller is satisfied that Buyer has not, or will not interconnect downstream fuel piping of natural gas for use in different priority-of• service categories.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

  • Placement of RDDS probes Probes for measuring RDDS parameters shall be placed inside the networks with the most users across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

  • New Facilities For all new Generating Facilities to be interconnected pursuant to the Tariff, other than wind- powered and other non-synchronous generation facilities, the Generation Interconnection Customer shall design its Customer Facility to maintain a composite power delivery at continuous rated power output at a power factor of at least 0.95 leading to 0.90 lagging. For all new wind- powered and other non-synchronous generation facilities the Generation Interconnection Customer shall design its Customer Facility with the ability to maintain a composite power delivery at a power factor of at least 0.95 leading to 0.95 lagging across the full range of continuous rated power output. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after November 1, 2016, the power factor requirement shall be measured at the high-side of the facility substation transformers. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. For all wind-powered and other non-synchronous generation facilities entering the New Service Queue on or after May 1, 2015, and before November 1, 2016, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of more than 20 MW, other than wind- powered and other non-synchronous Generating Facilities, the power factor requirement shall be measured at the generator’s terminals. For new generation resources of 20 MW or less, and all wind-powered and other non-synchronous generation facilities entering the New Service Queue prior to May 1, 2015, the power factor requirement shall be measured at the Point of Interconnection. Any different reactive power design criteria that Transmission Provider determines to be appropriate for a wind-powered or other non-synchronous generation facility shall be stated in the Interconnection Service Agreement. A Transmission Interconnection Customer interconnecting Merchant D.C. Transmission Facilities and/ or Controllable A.C. Merchant Transmission Facilities shall design its Customer Facility to maintain a power factor at the Point of Interconnection of at least 0.95 leading and 0.95 lagging, when the Customer Facility is operating at any level within its approved operating range.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • STANDARDS OF MANAGEMENT AND OPERATIONS In performing its obligations hereunder, during the term of this ESA, the Competitive Supplier shall exercise reasonable care to assure that its facilities are prudently and efficiently managed; that it employs an adequate number of competently trained and experienced personnel to carry out its responsibilities; that it delivers or arranges to deliver a safe and reliable supply of such amounts of electricity to the Point of Delivery as are required under this ESA; that it complies with all relevant industry standards and practices for the supply of electricity to Participating Consumers; and that, at all times with respect to Participating Consumers, it exercises good practice for a Competitive Supplier and employs Commercially Reasonable skills, systems and methods available to it.

  • Placement of EPP probes Probes for measuring EPP parameters shall be placed inside or close to Registrars points of access to the Internet across the different geographic regions; care shall be taken not to deploy probes behind high propagation-­‐delay links, such as satellite links.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!