Final Design 100% Contract Documents. Based on comments received from the City and NHDES, Xxxxxx-Xxxxxx will prepare 100% stamped plans and specifications ready for bidding, including final quantities and estimate of construction cost. Plans and specifications will be in compliance with SRF requirements. Electronic copies (in PDF) and three paper copies shall be submitted to the City, and one copy shall be submitted to NHDES.
AutoNDA by SimpleDocs

Related to Final Design 100% Contract Documents

  • Contract Documents The contract documents shall consist of the following:

  • Construction Contract Documents The Construction Contract Documents shall consist of the plans and specifications prepared by the Engineer, and any addenda and change orders thereto, and the Owner-Contractor Agreement, all of which shall be compatible and consistent with this Agreement.

  • OGS Contract Documents This Centralized Contract is composed of the following documents:  The Contract (that portion preceding the signatures)  Appendix A - Standard Clauses for New York State Contracts (January 2014)  Appendix B - General Specifications January 2015 22772 Project Based Information Technology Consulting (Statewide)  Appendix C - Contract Modification Procedure  Appendix D – Pricing Schedule  Appendix E – Report of Contract Purchases  Appendix F – Project Based Information Technology Consulting Services Processes and Forms o Attachment 1- Mini-Bid Template o Attachment 2- How to Use This Contract o Attachment 3- Enhancement Request Template o Attachment 4- No Cost Change Request Template o Attachment 5- Mini-Bid Participation Interest Template  Appendix G – Contractor and OGS Information

  • Design Documents Prepare and submit the following documents to the DAS - Records Management Office with a copy of the transmittal letter submitted to the respective Project Manager:

  • THE CONTRACT DOCUMENTS The Contract Documents consist of the State-Contractor Agreement, the Conditions of the Contract (General, Supplementary and other Conditions), the Drawings, the Specifications, and all Addenda issued prior to bid opening and any Change Orders after execution of the Contract.

  • INTENT OF CONTRACT DOCUMENTS 1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or portion thereof) to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for. When words which have a well-known technical or trade meaning are used to describe work, materials or equipment, such words shall be interpreted in accordance with that meaning. Reference to standard specifications, manuals or codes of any technical society, organization or association or to the laws or regulations of any governmental authority having jurisdiction over the Project, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, law or regulation in effect at the time the Work is performed, except as may be otherwise specifically stated herein.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Design Development Documents See Section 2, Part 1, Article 2.1.5.

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.