Follow-up Emergency Response Activities Sample Clauses

Follow-up Emergency Response Activities. For follow-up activities, subcontracting will be subject to competitive bidding as required under Table 1: Bidding Requirements for Subcontracting Emergency Response and Follow-up Activities and per the MPCA Purchasing Manual.
AutoNDA by SimpleDocs

Related to Follow-up Emergency Response Activities

  • Contingent Emergency Response 1. In order to ensure the proper implementation of contingent emergency response activities under Part 4 of the Project (“Contingent Emergency Response Part”), the Recipient shall ensure that: (a) a manual (“CERC Manual”) is prepared and adopted in form and substance acceptable to the Association, which shall set forth detailed implementation arrangements for the Contingent Emergency Response Part, including: (i) any structures or institutional arrangements for coordinating and implementing the Contingent Emergency Response Part;

  • Emergency Response Partners must develop, maintain, and carry out a response plan for public water system emergencies, including disease outbreaks, spills, operational failures, and water system contamination. Partners must notify DWS in a timely manner of emergencies that may affect drinking water supplies.

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

  • Emergency/Declared Disaster Requirements In the event of an emergency or if Orange County is declared a disaster area by the County, state or federal government, this Contract may be subjected to unusual usage. The Contractor shall service the County during such an emergency or declared disaster under the same terms and conditions that apply during non-emergency/disaster conditions. The pricing quoted by the Contractor shall apply to serving the County’s needs regardless of the circumstances. If the Contractor is unable to supply the goods/services under the terms of the Contract, then the Contractor shall provide proof of such disruption and a copy of the invoice for the goods/services from the Contractor’s supplier(s). Additional profit margin as a result of supplying goods/services during an emergency or a declared disaster shall not be permitted. In the event of an emergency or declared disaster, emergency purchase order numbers will be assigned. All applicable invoices from the Contractor shall show both the emergency purchase order number and the Contract number.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Emergency Calls IP Phones need an additional power supply to operate. In the event of a power failure it is your responsibility to ensure you have the means to make emergency calls. In accordance with paragraph 13.2, we will not be liable for any loss or damage (financial or otherwise) where you fail to do so.

  • University Responsibilities 4.1 The University will provide a room accommodation to The Resident for a period of one academic year or the portion of the academic year remaining when occupancy begins (limited to the subsequent fall and spring semesters) exclusive of the Winter Recess period unless The Resident is assigned to a facility that remains open during this time or is approved to live on-campus during Winter Recess. Services provided by the University begin on the official check-in dates for the specific area and include access to the assigned building and room. 4.2 In accordance with University policy, the University will provide staff that will help facilitate a living experience that complements the academic mission of the University. 4.3 Exclusive of unanticipated weather events and building system failures that may disrupt service and subject to the availability of applicable resources, the University will provide adequate light, heat, electricity, hot water and telecommunication services (limited to video and internet connection) to residents. Student rooms shall be furnished.

  • Additional Federally Required Orders/Directives Both parties agree that they will comply with the following laws and directives, where applicable: 11.20.1 Executive Order 11061, as amended, which directs the Secretary of HUD to take all action which is necessary and appropriate to prevent discrimination by agencies that utilize federal funds. 11.20.2 Public Law 88-352, Title VI of the Civil Rights Act of 1964, which provides that no person in the United States shall, on the basis of race, color, national origin, or sex, be excluded from participation in, denied the benefits of, or subjected to discrimination under any program or activity which receives federal financial assistance. The Agency hereby extends this requirement to the Contractor and its private contractors. Specific prohibited discriminatory actions and corrective action are described in Chapter 2, Subtitle C, Title V of the Anti-Drug Abuse Act of 1988 (42 U.S.C. 19901 et. seq.). 11.20.3 Public Law 90-284, Title VIII of the Civil Rights Act of 1968., popularly known as the Fair Housing Act, which provides for fair housing throughout the United States and prohibits any person from discriminating in the sale or rental of housing, the financing of housing or the provision of brokerage services, including in any way making unavailable or denying a dwelling to any person because of race, color, religion, sex, or national origin. Pursuant to this statute, the Agency requires that the Contractor administer all programs and activities, which are related to housing and community development in such a manner as affirmatively to further fair housing. 11.20.4 The Age Discrimination Act of 1975, which prohibits discrimination on the basis of age. 11.20.5 Anti-Drug Abuse Act of 1988 (42 U.S.C. 11901 et. seq.). 11.20.6 HUD Information Bulletin 909-23 which is the following: 11.20.6.1 Notice of Assistance Regarding Patent and Copyright Infringement; 11.20.6.2 Clean Air and Water Certification; and,

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Substance Abuse Program The SFMTA General Manager or designee will manage all aspects of the FTA-mandated Substance Abuse Program. He/she shall have appointing and removal authority over all personnel working for the Substance Abuse Program personnel, and shall be responsible for the supervision of the SAP.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!