Gas Turbine Generator Erection Sample Clauses

Gas Turbine Generator Erection. This section covers the receiving, unloading, storage, protection, installation, erection, finish painting, start-up and testing of the gas turbines and auxiliary equipment as described under Exhibit H. The Contractor shall furnish all labor, tools, services, equipment and material for this work. The Contractor's erection methods and procedures shall conform with accepted good engineering practice, the requirements of applicable codes and standards and in accordance with the procedures furnished and approved by the manufacturer. -------------------------------------------------------------------------------- EPC - Exhibit B TENASKA GEORGIA GENERATION PROJECT --------------- Page 52 of 132 -------------------------------------------------------------------------------- --------------------------------------------------------------------------------
AutoNDA by SimpleDocs

Related to Gas Turbine Generator Erection

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Plant An electrical generating alternative energy resource facility developed by Producer for which IID shall provide transmission service, as specified in Exhibit(s) II, Transmission Service, and in any subsequent Plant Amendments.

  • Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • HEATING, VENTILATING AND AIR CONDITIONING The Tenant will operate and regulate those portions of the heating, ventilating, and air conditioning equipment within and serving the Leased Premises so as to maintain such reasonable conditions of temperature and humidity within the Leased Premises as are determined by the Landlord and its Architect and engineers so that no direct or indirect appropriation of the heating, ventilating and air conditioning from the other portions of the Building occurs. The Tenant shall comply with such stipulations and with all Rules and Regulations of the Landlord pertaining to the operation and regulation of such equipment. The Tenant shall immediately notify the Landlord in the event that any repairs are required to the heating, ventilating and air conditioning equipment serving the Leased Premises and shall reimburse the Landlord as part of its Proportionate Share of Operating Costs for the cost of any maintenance, repairs or replacements made by the Landlord in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises. The Landlord acknowledges that the Tenant shall not be responsible for the cost of capital repairs and capital replacements in respect of the heating, ventilating and air conditioning equipment serving the Leased Premises provided that such capital repairs and capital replacements are not necessitated by the Tenant's incorrect or negligent use of equipment. The Tenant shall not under any circumstances go onto the roof of the Building or make any maintenance repairs or replacements to the heating, ventilating and air conditioning systems in the Building without the prior written consent of the Landlord. If the Tenant fails to comply with such stipulations and Rules and Regulations, the Landlord shall be entitled to take such steps as it deems advisable to correct such defaults (including, without limitation, entering upon the Leased Premises and assuming control of such equipment) without liability to the Tenant, and the Tenant will pay to the Landlord forthwith upon demand as Additional Rent all costs and expenses incurred by the Landlord in so doing. The Landlord represents and warrants to the Tenant that the heating, ventilating and air conditioning equipment serving the Leased Premises and required to be installed by the Landlord pursuant to Schedule "C" is and will be at the Commencement Date in good working order and condition.

  • Electrical Service Subject to the limitation of this Paragraph 4, furnish electrical service to the Premises, including providing and installing all Building standard replacement lighting tubes. If Tenant uses more electrical power than Landlord in good faith considers reasonable or normal for office use, Tenant will pay Landlord on a monthly basis the cost of such excess power consumed by Tenant. Consumption will be determined, at Landlord’s election, either (a) by a survey performed by a reputable consultant selected by Landlord, or (b) through separate meters or submeters installed, maintained and read by Landlord at Tenant’s cost. For purposes of this Paragraph 4 only, “month” and “monthly” shall mean any billing period used by the utility or other power provider supplying electricity. All installations of electrical futures, appliances and equipment within the Premises shall be subject to Landlord’s prior approval, and if they affect the temperature or humidity otherwise maintained, Landlord may, at Tenant’s sole cost and expense (to be paid within (30) days after delivery of written demand supported by invoices or other reasonably satisfactory evidence), install supplemental air conditioning units. Tenant’s use of electricity shall never exceed Tenant’s share of the capacity of existing feeders to the Building or of the risers, wiring installations and transformers serving the floor(s) containing the Premises. Landlord shall provide up to 3.5 xxxxx per usable square foot (demand) of riser and floor panel electrical capacity averaged over the floor being serviced. EXHIBIT C Tenant shall be allocated an approximate 2.0 xxxxx per usable square foot for power and 1.5 xxxxx per usable square foot for lighting. Any risers or wiring necessary to meet Tenant’s excess electrical requirements will be installed by Landlord on Tenant’s request, at Tenant’s sole cost and expense (to be paid in advance), but only if in Landlord’s reasonable good faith belief they are necessary and will not cause damage to the Building or a dangerous condition, entail excessive or unreasonable alterations, repairs or expense, or disturb other occupants.

  • Delivery Points The measurement of and tests for quality of Shipper's Gas redelivered at the Delivery Points shall be governed by and determined in accordance with the requirements of the receiving pipeline at each Delivery Point.

  • Project The Land and all improvements thereon, including the Building, the Parking Facilities, and all Common Areas.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

Time is Money Join Law Insider Premium to draft better contracts faster.