Gaskets and Packing Sample Clauses

Gaskets and Packing. Gaskets used with push-on joints for DI pipes shall be provided by the Employer along with pipes at 5% in excess of number of pipes. Additional gaskets for jointing of specials, mechanical joints and extra quantity required for cut pipes etc. over and above that provided by the Employer, shall be supplied by the contractor under this contract along with specials. Rubber gaskets used with push-on joints and mechanical joints shall conform to IS: 5382. Rubber gaskets for use with flange joints shall conform to IS: 638. While conveying potable water the gaskets should not deteriorate the quality of water and should not impart any bad test or foul odor. The push-on gaskets shall be tested in accordance with the provisions of IS: 5382 and the contractor shall submit the test report from the manufacturer in that respect.
AutoNDA by SimpleDocs
Gaskets and Packing. Gaskets and O-rings for water service shall be made of Nitrile rubber and readymade matching with respective flanges. Gaskets and O-rings for chemical service including chlorine shall be made of EPDM or Viton. Gaskets cut out from rubber sheets are not acceptable.

Related to Gaskets and Packing

  • Labelling and Packaging C17.1 On dispatch of any consignment of the Goods the Contractor shall send the Authority an advice note specifying the means of transport, the place and date of dispatch, the number of packages and their weight and volume. The Goods shall be packed and marked in a proper manner.

  • Packaging Tangible product shall be securely and properly packed for shipment, storage, and stocking in appropriate, clearly labeled, shipping containers and according to accepted commercial practice, without extra charge for packing materials, cases, or other types of containers. All containers and packaging shall become and remain Customer’s property.

  • FABRICATION Making up data or results and recording or reporting them.

  • Consumables During the design phase, Purchaser may participate in the selection of suppliers of consumables of the Supplier. In such case, the choice regarding the final selection of the said suppliers shall be mutually agreed between the Parties. Two suppliers shall be identified and selected for each type of consumables.

  • Packing 9.1 The supplier shall provide such packing of the goods as is required to prevent their damage or deterioration during transit to their final destination, as indicated in the contract. The packing shall be sufficient to withstand, without limitation, rough handling during transit and exposure to extreme temperatures, salt and precipitation during transit, and open storage. Packing, case size and weights shall take into consideration, where appropriate, the remoteness of the goods’ final destination and the absence of heavy handling facilities at all points in transit.

  • Assembly (1)(a) The Contracting Parties shall have an Assembly.

  • Packaging Materials and Containers for Retail Sale Packaging materials and containers in which a good is packaged for retail sale shall, if classified with the good, be disregarded in determining whether all the non-originating materials used in the production of the good undergo the applicable change in tariff classification set out in Annex 4, and, if the good is subject to a regional value-content requirement, the value of such packaging materials and containers shall be taken into account as originating or non-originating materials, as the case may be, in calculating the regional value content of the good.

  • SAMPLE (i) Unless agreed otherwise, wheeled or track lay- ing equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails approved under B5.1 or B6.422. Purchaser may be required to backblade skid trails and other ground disturbed by Purchaser’s Opera- tions within such areas in lieu of cross ditching required under B6.6. Additional special protection measures needed to protect such known areas are identified in C6.24.

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Packing Materials and Containers for Shipment Packing materials and containers in which a good is packed for shipment shall be disregarded in determining whether:

Time is Money Join Law Insider Premium to draft better contracts faster.