GATE CLOSURE. Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul must be locked or securely fastened in the open position. All gates must be closed at termination of use.
GATE CLOSURE. On the following road(s), Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul must be locked or securely fastened in the open position. All gates must be closed at termination of use. Road Station SECTION 8 – EROSION CONTROL
GATE CLOSURE. On the following road(s), Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul shall be locked or securely fastened in the open position. All gates shall be closed at termination of use. Road Station Comment SUBSECTION GATES AND FENCES 7-75 GATE MAINTENANCE On the following road(s), gate maintenance as listed is required. All old gate material shall be removed from state land by the Purchaser before the termination of the contract. Road Station Requirements
GATE CLOSURE. On the following road, Purchaser shall keep gates closed and locked except during periods of haul. Road Station Comments DRAFT
GATE CLOSURE. On the following road(s), Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul must be locked or securely fastened in the open position. All gates must be closed at termination of use. Road Station PA-S-1000 2+00 SUBSECTION GATES AND FENCES 7-75 GATE MAINTENANCE Purchaser shall conduct gate maintenance as listed. Purchaser shall remove all old gate material from state land before the termination of the contract. Road Station Requirements PA-S-1000 2+00 Gate shall be painted Safety Yellow color using high gloss alkyd enamel paint. Prior to painting, surfaces shall be prepared by cleaning, sanding and removing all loose rust and paint. All surfaces shall be dry at the time of painting. Two coats of paint shall be applied, using the procedures described in the product instructions, with a minimum of eight hours drying time between coats.
GATE CLOSURE. Access to the Facility for Event participants is strictly limited to the access hours agreed upon by the Parties.
GATE CLOSURE. On the following road, Purchaser shall keep gates closed and locked except during periods of haul. All gates must be closed at termination of use. Road Station K1200 3+12 SUBSECTION POST-HAUL MAINTENANCE 9-5 POST-HAUL MAINTENANCE Purchaser shall perform post-haul maintenance in accordance with the FOREST ACCESS ROAD MAINTENANCE SPECIFICATIONS. FOREST ACCESS ROAD MAINTENANCE SPECIFICATIONS Cuts and Fills Maintain slope lines to a stable gradient compatible with the cut slope/fill slope ratios. Remove slides up to 50 cubic yards in volume from ditches and the roadway. Repair fill- failures, in accordance with Clause 4-6 EMBANKMENT SLOPE RATIO, with selected material or material approved by the Contract Administrator. Remove overhanging material from the top of cut slopes. Waste material from slides or other sources shall be placed and compacted in stable locations identified in the road plan or approved by the Contract Administrator, so that sediment will not deliver to any streams or wetlands. Slide material and debris shall not be mixed into the road surface materials, unless approved by the Contract Administrator.
GATE CLOSURE. On the following road(s), Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul must be locked or securely fastened in the open position. All gates must be closed at termination of use. Road Station Comment PA-I-3000 2+50 Open except during periods of high fire danger or by Contract Administrators approval PA-I-3020 6+85 Closed except for periods of haul. DRAFT SUBSECTION GATES AND FENCES 7-75 GATE MAINTENANCE Purchaser shall conduct gate maintenance as listed. Road Station Requirements PA-J-3000 2+50 Gate shall be painted Safety Yellow color using high gloss alkyd enamel paint. Prior to painting, surfaces shall be prepared by cleaning, sanding and removing all loose rust and paint. All surfaces shall be dry at the time of painting. Two coats of paint shall be applied, using the procedures described in the product instructions, with a minimum of eight hours drying time between coats. SUBSECTION REVEGETATION 8-15 REVEGETATION Purchaser shall spread straw and/or hay on all exposed soils including, but not limited to, stream culverts, waste areas, sidecast pullback areas, stream crossing removals, bridge installations, and other areas as directed by the Contract Administrator. Revegetation of exposed soils shall be accomplished by manual dispersal of grass seed unless otherwise detailed in this Road Plan. Other methods of covering must be approved in writing by the Contract Administrator.
GATE CLOSURE. On the following road(s), Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul must be locked or securely fastened in the open position. All gates must be closed at termination of use. Road Station Comment E354420A 45+15 Close and lock gate each day when hauling activities are complete between 12/1 and 3/31 108+48 Close and lock gate each day when hauling activities are complete E354417F 3+00 Close and lock gate each day when hauling activities are complete
GATE CLOSURE. On the following road(s), Purchaser shall keep gates closed and locked except during periods of haul. All gates that remain open during haul must be locked or securely fastened in the open position. All gates must be closed at termination of use. Road Station PA-J-1200 2+15 PA-I-2600 1+00 SUBSECTION GATES AND FENCES DRAFT 7-75 GATE MAINTENANCE Purchaser shall conduct gate maintenance as listed. Road Station Requirements PA-J-1200 2+15 Grease all lubrication points. PA-I-2600 1+00 Grease all lubrication points.