GENERAL EXCAVATION Sample Clauses

GENERAL EXCAVATION. 12 1.2.1 Classification of Excavation 12 1.2.2 Construction Requirements 13 1.2.3 Method of Measurement 13
AutoNDA by SimpleDocs
GENERAL EXCAVATION. This Work shall consist of excavating the earthwork platforms removing and satisfactorily disposing of all materials taken from within the limits of the work, and shall include all excavation, preparation and completion of all platforms, embankments and slopes, as directed, and in conformity to the grades, and cross-section shown on the plans or established by the Engineer or his Representative.
GENERAL EXCAVATION. A. The trench shall be dug so that the utilities can be laid to the alignment and depth specified. Unless otherwise allowed by ENGINEER, trenches shall not be excavated more than 100 feet in advance of pipe laying. Earth excavation shall include all excavation except rock as hereinafter defined. Included in earth excavation shall be removal of street paving of all types, existing structures, existing improvements and trees smaller than 4 inches in diameter measured 4 feet above the ground, all as necessary to complete the pipe installation.
GENERAL EXCAVATION. The contractor shall inform and satisfy himself as to the character, quantity and distribution of all materials to be excavated. Except as otherwise provided in these specifications, materials excavated will be measured in excavation to the lines shown on the drawings or as provided in this specification, and all materials required to be excavated will be paid for at the applicable price bid in the schedule for excavation. No additional allowance above the price bid in the schedule will be made on account of any of the material being wet. Contractors must assume all responsibility for deducting and concluding as to the nature of the materials to be excavated and the difficulty of making and maintaining the required excavation. The Government does not represent that the excavation can be performed or maintained at the pay line described in this specification or as shown on the drawings.
GENERAL EXCAVATION. AND GRADING -The clearance, excavating, filling, backfilling, grading and landscaping of all sites for all purpose and all labor connected therewith, including chainmen, rodmen, grade markers, etc.

Related to GENERAL EXCAVATION

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!