GENERAL EXCAVATION Sample Clauses

GENERAL EXCAVATION. A. The trench shall be dug so that the utilities can be laid to the alignment and depth specified. Unless otherwise allowed by ENGINEER, trenches shall not be excavated more than 100 feet in advance of pipe laying. Earth excavation shall include all excavation except rock as hereinafter defined. Included in earth excavation shall be removal of street paving of all types, existing structures, existing improvements and trees smaller than 4 inches in diameter measured 4 feet above the ground, all as necessary to complete the pipe installation.
AutoNDA by SimpleDocs
GENERAL EXCAVATION. AND GRADING -The clearance, excavating, filling, backfilling, grading and landscaping of all sites for all purpose and all labor connected therewith, including chainmen, rodmen, grade markers, etc.
GENERAL EXCAVATION. The contractor shall inform and satisfy himself as to the character, quantity and distribution of all materials to be excavated. Except as otherwise provided in these specifications, materials excavated will be measured in excavation to the lines shown on the drawings or as provided in this specification, and all materials required to be excavated will be paid for at the applicable price bid in the schedule for excavation. No additional allowance above the price bid in the schedule will be made on account of any of the material being wet. Contractors must assume all responsibility for deducting and concluding as to the nature of the materials to be excavated and the difficulty of making and maintaining the required excavation. The Government does not represent that the excavation can be performed or maintained at the pay line described in this specification or as shown on the drawings.
GENERAL EXCAVATION. 12 1.2.1 Classification of Excavation 12 1.2.2 Construction Requirements 13 1.2.3 Method of Measurement 13
GENERAL EXCAVATION. This Work shall consist of excavating the earthwork platforms removing and satisfactorily disposing of all materials taken from within the limits of the work, and shall include all excavation, preparation and completion of all platforms, embankments and slopes, as directed, and in conformity to the grades, and cross-section shown on the plans or established by the Engineer or his Representative.

Related to GENERAL EXCAVATION

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!