GENERATOR MAJOR INSPECTION Sample Clauses

GENERATOR MAJOR INSPECTION. A. PRE-SHUTDOWN CHECKS The following will be checked and recorded prior to shutdown: 1. Check double insulated bearings. 2. Recurring problems and discrepancies review 3. Present annunciator drops 4. Operating data 5. Review active TILs. B. MOBILIZE 1. Marshal tools and equipment adjacent to the unit. 2. Establish work crews. 3. Prepare site for work. 4. Conduct site safety meeting. C. REMOVE LAGGING 1. Upper end shield lagging 2. Upper cooler dome lagging D. DISASSEMBLE GENERATOR 1. Disassemble journal bearings, visually inspect, and record clearances and condition, including ball seat contact and pinch checks. 2. Disassemble oil deflectors and hydrogen seals. 3. Disassemble end shield piping. 4. Disassemble/remove collector brush holder rigging. 5. Remove end xxxxxxx and generator field. 6. Remove stator cooler heads.
AutoNDA by SimpleDocs

Related to GENERATOR MAJOR INSPECTION

  • Safety Inspection During inspection of County facilities conducted by the State Division of Occupational Safety and Health for the purpose of determining compliance with the California OSHA requirements, an OCEA designated employee shall be allowed to accompany the inspector while the inspector is in the employee's agency/department. The employee so designated shall suffer no loss of pay when this function is performed during the employee's regularly scheduled work hours.

  • SITE INSPECTION Where a site inspection is required by the Bid Specifications or Project Definition, Bidder shall be required to inspect the site, including environmental or other conditions for pre-existing deficiencies that may affect the installed Product, equipment, or environment or services to be provided and, which may affect Bidder’s ability to properly deliver, install or otherwise provide the required Product. All inquiries regarding such conditions shall be made in writing. Bidder shall be deemed to have knowledge of any deficiencies or conditions which such inspection or inquiry might have disclosed. Bidder must provide a detailed explanation with its Bid if additional work is required under this clause in order to properly complete the delivery and installation of the required Product or provide the requested service.

  • Records; Inspection Reneo shall, and shall cause its Affiliates and Sublicensees to, keep complete, true and accurate books of account and records for the purpose of determining the payments to be made under this Agreement. Such books and records shall be kept for [***] years following the end of the calendar year to which they pertain. Such records shall be open for inspection during such period by independent accountants, solely for the purpose of verifying payment statements hereunder for a period covering not more than the [***] prior to the date of request; provided that no period shall be subject to inspection under this section more than once. Such inspections shall be made no more than once each calendar year, on reasonable notice during normal business hours. The auditor will execute a reasonable written confidentiality agreement with Reneo and will disclose to vTv only such information as is reasonably necessary to provide vTv with information regarding any actual or potential discrepancies between amounts reported and actually paid and amounts payable under this Agreement. The auditor will send a copy of the report to Reneo at the same time it is sent to vTv. The report sent to both Parties will include the methodology and calculations used to determine the results. Any unpaid amounts (plus interest as set forth in Section 3.8) that are discovered shall be paid promptly by Reneo. Inspections conducted under this Section 3.9 shall be at the expense of vTv, unless the inspection discloses an underpayment by Reneo of [***] or more of the amount due for any period covered by the inspection, whereupon all costs relating to the inspection for such period shall be paid promptly by Reneo. If an inspection conducted pursuant to this Section 3.9 discloses an overpayment by Reneo, then Reneo will deduct the amount of such overpayment from amounts otherwise owed to vTv under this Agreement, unless no further payments are due hereunder, in which case the amount of such overpayment shall be refunded by vTv to Reneo.

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Goods Inspection The Commissioner of DAS, in consultation with the Client Agency, shall determine the manner and prescribe the inspection of all Goods and the tests of all samples submitted to determine whether they comply with all of the specifications in the Contract. If any Goods fail in any way to meet the specifications in the Contract, the Client Agency or the Commissioner of DAS may, in its sole discretion, either reject it and owe nothing or accept it and pay for it on an adjusted price basis, depending on the degree to which the Goods meet the specifications. Any decision pertaining to any such failure or rejection shall be final and binding.

  • Inspection/Testing In order to assess Supplier’s work quality and/or compliance with this Order, upon reasonable notice by Buyer: (a) all goods, materials and services related to the items purchased hereunder, including, raw materials, components, assemblies, work in process, tools and end products shall be subject to inspection and testing by Buyer, its customer, representative or regulatory authorities at all places, including sites where the goods are made or located or the services are performed, whether at Supplier’s premises or elsewhere; and (b) all of Supplier’s facilities, books and records relating to this Order shall be subject to inspection by Buyer or its designee. If specific Buyer and/or Buyer’s customer tests, inspection and/or witness points are included in this Order, the goods shall not be shipped without an inspector’s release or a written waiver of test/inspection/witness with respect to each such point; however, Buyer shall not be permitted to unreasonably delay shipment; and Supplier shall notify Buyer in writing at least twenty (20) days prior to each of Supplier’s scheduled final and, if applicable, intermediate test/inspection/witness points. Supplier agrees to cooperate with such/audit inspection including, completing and returning questionnaires and making available its knowledgeable representatives. Buyer’s failure to inspect or test goods, materials or services or Buyer’s failure to reject or detect defects by inspection or testing shall not relieve Supplier from its warranty obligations or any of its other obligations or responsibilities under this Order. Supplier agrees to provide small business as well as minority and/or women owned business utilization and demographic data upon request.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Property Inspection The Servicer is required to inspect each Delinquent Mortgaged Property at such time and in such manner as is in accordance with Prudent Servicing Practices. The Servicer must prepare a Property Inspection Report following each inspection. All Property Inspection Reports must be retained by the Servicer and copies thereof must be forwarded to the Master Servicer promptly upon request. All expenses related to the foregoing shall be recoverable by the Servicer from the Principal or from Liquidation Proceeds, Insurance Proceeds, payments on the related Mortgage Loan or any other source relating to the related Mortgage Loan or the related Mortgaged Property. The foregoing shall not preclude the Servicer from recovering such expenses from the Borrower to the extent permitted by applicable law and the related Mortgage Loan Documents.

  • SITE EXAMINATION Contractor has examined the Site and certifies that it accepts all measurements, specifications and conditions affecting the Work to be performed at the Site. By submitting its quote, Contractor warrants that it has made all Site examination(s) that it deems necessary as to the condition of the Site, its accessibility for materials, workers and utilities, and Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowance of time or money will be allowed as to any other undiscovered condition on the Site.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.