Geotechnical Site Investigation Sample Clauses

Geotechnical Site Investigation. A geotechnical site investigation will be performed to assess existing surface and subsurface conditions, and to inspect the existing rock wall. The investigation will include removal of the steel plate(s) and inspection of the existing void, and excavation of one or two test pits behind the rockery. The test pits will be overseen and logged by the Consultant and samples will be collected for laboratory analysis. The test pits locations will be restored with gravel surfacing. The excavator and operator will be organized and provided by the City.
AutoNDA by SimpleDocs

Related to Geotechnical Site Investigation

  • Site Investigation Developer has made a careful investigation of the Site and is familiar with the requirements of the Contract Documents and has accepted the readily observable, existing conditions of the Site.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Geotechnical Engineer « »« » « » « » « » « »

  • BACKGROUND INVESTIGATION The BOARD is prohibited from knowingly employing a person who has been convicted of committing or attempting to commit certain criminal offenses. If the required criminal background investigation is not completed at the time this Contract is signed, and the subsequent investigation report reveals that there has been a prohibited conviction, this Contract shall immediately become null and void.

  • Environmental Review (a) Buyer shall have the right to conduct or cause a consultant (“Buyer’s Environmental Consultant”) to conduct an environmental review of the Assets and Seller’s records pertaining to the Assets (as set forth in Section 3.01) prior to the expiration of the Examination Period (“Buyer’s Environmental Review”). The cost and expense of Buyer’s Environmental Review, if any, shall be borne solely by Buyer. The scope of work comprising Buyer’s Environmental Review shall not include any intrusive test or procedure without the prior written consent of Seller. Buyer shall (and shall cause Buyer’s Environmental Consultant to): (i) consult with Seller before conducting any work comprising Buyer’s Environmental Review, (ii) perform all such work in a safe and workmanlike manner and so as to not unreasonably interfere with Seller’s operations and (iii) comply with all applicable laws, rules, and regulations. Seller shall use commercially reasonable efforts to obtain any Third Party consents and otherwise cooperate with Buyer in conducting Buyer’s Environmental Review and any activities related thereto. Seller shall have the right to have a representative or representatives accompany Buyer and Buyer’s Environmental Consultant at all times during Buyer’s Environmental Review. With respect to any samples taken in connection with Buyer’s Environmental Review, Buyer shall take split samples, providing one of each such sample, properly labeled and identified, to Seller. The Parties shall execute a “common undertaking” letter regarding the confidentiality for the Environmental Review where appropriate. Buyer hereby agrees to release, defend, indemnify and hold harmless Seller from and against all claims, losses, damages, costs, expenses, causes of action and judgments of any kind or character (INCLUDING THOSE RESULTING FROM SELLER’S SOLE, JOINT, COMPARATIVE OR CONCURRENT NEGLIGENCE OR STRICT LIABILITY) to the extent arising out of Buyer’s Environmental Review. Buyer hereby covenants and agrees that it will have at least $2,000,000 of general liability insurance to cover its indemnification hereunder prior to the commencement of the Environmental Review.

  • Environmental Management (a) The Operator must, prior to the commencement of any Train Services (including any new or varied Train Services):

  • Background Investigations OSC policy requires that background investigations be conducted on Contractor Staff who will have access to OSC’s IT systems, access to OSC confidential information/data, or routine access to any OSC facility. For purposes of this policy, “routine access” is defined as access to an OSC facility for five consecutive business days or 10 business days over the annual term of the engagement. Accordingly, with the signing of this Agreement, the Contractor certifies that it has or will conduct a background investigation on Staff to whom the policy applies within the 12 months prior to the Staff commencing Services under this Agreement. The Contractor agrees to undertake a background investigation of any new/replacement Staff during the term of the Agreement. At a minimum, background investigations shall include a review/evaluation of the following: • identity verification, including Social Security Number search; • employment eligibility, including verification of U.S. citizenship or legal immigration status where appropriate; • criminal history/court records (Federal, State and local for the past five years); • work experience/history for the past five years; • pertinent skills, qualifications, and education/professional credentials; and • references. The Contractor must obtain the consent of its Staff to allow OSC, upon request: (i) to review the background investigation records, including all supporting documentation, and (ii) to conduct its own background investigation. Only Staff who have passed the background investigation, and provided such consent shall be assigned to provide Services to OSC under this Agreement. During the term of the Agreement, and in accordance with Appendix A (Section 10, Records), the Contractor must maintain records related to the background investigations performed.

  • Geotechnical Services Engineer will obtain all necessary subsurface investigations, tests, reports, and perform related surveys.

  • SITE INSPECTION Where a site inspection is required by the Bid Specifications or Project Definition, Bidder shall be required to inspect the site, including environmental or other conditions for pre-existing deficiencies that may affect the installed Product, equipment, or environment or services to be provided and, which may affect Bidder’s ability to properly deliver, install or otherwise provide the required Product. All inquiries regarding such conditions shall be made in writing. Bidder shall be deemed to have knowledge of any deficiencies or conditions which such inspection or inquiry might have disclosed. Bidder must provide a detailed explanation with its Bid if additional work is required under this clause in order to properly complete the delivery and installation of the required Product or provide the requested service.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!