Horizontal Site Limits. All components of the P3CF Contractor’s project are to be located within the specified leased area with the exception of extension of utilities to their points of connection or electrical lines extending off the P3CF or Cogeneration Facility Site to their delivery point with the MCASM and/or wholesale electrical buyer.
AutoNDA by SimpleDocs

Related to Horizontal Site Limits

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Horizontal Movement The Board encourages all unit members to improve their skills through advanced training and, as an inducement thereto, provides extra compensation for those who do so successfully. The Board delegates to the Superintendent the responsibility for assuring that unit members comply with the following regulations when claiming credit for advanced studies.

  • Site Access Dell requires the right to access the APEX System in a timely way and as provided in the Service Offering Description to provide the Support Services. Failure to ensure that Customer provides Dell with timely access to a Site will relieve Dell of the Support Services obligations and Dell may also, at Dell’s discretion, suspend the APEX Service.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Access Roads The Company is to construct a public access road from Xxxxx Avenue to the Town Centre together with all other roads shown on the Land Tenure Plan. All roads are to be paved and drained to the satisfaction of the City.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Fire Safety 9.5.1 Residents found in violation of the following fire safety stipulations not only put themselves at risk but also jeopardizes the safety of the entire community.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

Time is Money Join Law Insider Premium to draft better contracts faster.