House Connections. Plan locations and invert elevations, for all house connections at the street line, shall be shown on the drawings. Minimum fall on house connections shall be 2%; maximum 8%. Where the depth of sewer is excessive, a riser may be used over the main sewers. Shop manufactured “Tee” connections shall be used for house connections to the main sewer. Each service lateral shall be complete with a manufactured “Wye” connection and 100 mm diameter cleanout that shall extend to the ground surface level. The top of the cleanout shall be installed flush with the ground surface 300 mm from the lot line. A cap of approved manufacture shall be installed on each service lateral termination at the street line and made watertight. The ends of all services shall be marked by a 50 mm x 100 xx xxxx post extending from the service to 300 mm above the surface of the ground and the top section painted fluorescent green. Connections to manholes shall enter the manhole no higher than 0.5 m above the lowest invert, except as otherwise approved by the General Manager of Infrastructure and Development .
House Connections. 19. All portions of any water, storm sewer, sump pump and sanitary sewer connections, from water and sewer mains to the limit of all roads shall be installed according to the specifications set out in Schedules “B” and “E” attached hereto and forming part of this Agreement, and shall be subject to the approval of the Township Official. Any connections that will involve the tunneling or cutting of a traveled or graded portion of any road shall be made before constructing the granular base course of the roads. All connections made through any drainage ditch shall be made in such a manner that the ditch is restored to the designed grade and cross-section. The Township shall not be responsible for future repairs or maintenance of water services located outside of the Township’s Right of Way. Service location sheets shall be provided for all lots to be serviced.