Inclement Weather and Electrical Equipment Guidelines Sample Clauses

Inclement Weather and Electrical Equipment Guidelines i) When using elevated work platforms, wind speed should be monitored. The platform must be either be lowered, or operated from ground level, when wind speeds at platform height exceed 40 km/hour or the manufacturer’s limit. ii) If lightning strikes within or approaches a sixteen (16) km radius of any Aerial Platform then all elevated platforms on the worksite should be evacuated. Only after thirty (30) minutes without any subsequent lightning strikes within this radius, can crew members be placed on the platform once again.
AutoNDA by SimpleDocs
Inclement Weather and Electrical Equipment Guidelines i) When using elevated work platforms, wind speed shall be monitored. The platform must be lowered when wind speeds at platform height exceed 40 km/hour or the manufacturer’s limit. Considerations shall be given to any platform rigging or attachments as they increase the wind profile and may reduce the manufacturer's limit. ii) In accordance with AMPTP Safety Bulletins, if lightning strikes within or approaches a 16 km radius of any worksite (set, circus, prep, etc.), the crew shall take shelter. Aerial platforms must be evacuated. Work may resume only when thirty (30) minutes have elapsed after the last strike within a 16 km radius. ARTICLE TWENTY-FOUR - TRAINEES‌ Employing Trainees is encouraged by the Union. All trainee positions must be negotiated on a case-by-case basis with the Motion Picture Business Agent. Only the Union may place trainees in consultation with the Department Head and the Company. *Under no circumstances will anyone be engaged as a trainee under this agreement without prior consultation with The Union. *

Related to Inclement Weather and Electrical Equipment Guidelines

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • NETWORK INTERCONNECTION METHODS 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!