Information architecture for WPC Sample Clauses

Information architecture for WPC. The purpose of this section is to describe generic Information solution architecture for OBECs’ Use Cases URLs Inventory of enterprises and Variables in the ICT usage in enterprise survey (Figure 4 and Figure 5, respectively). The description is based on BREAL Information architecture. Figure 4 - Information solution architecture for OBECs’ Use Cases URLs Inventory of enterprises. Figure 5 - Information solution architecture for OBECs’ Use Cases Variables in the ICT usage in enterprise survey. The Raw data Layer describes the OBECs’ initial data sources in terms of BREAL. It covers the Acquisition and Recording process of OBEC. The Convergence Layer describes the information entities derived from source data through Data Wrangling and Data Representation processes of OBEC. The Statistical Layer describes the information entities derived from Convergence Layer information sources trough Modelling and Interpretation and Shape Output processes of OBEC. Enterprise Website entity The main data source for OBECs’ use cases are the enterprises’ websites. The websites are structured in HTML format, but due to the large number of sites with different HTML structures and the placement of relevant information in a text, this data source generally provides unstructured information. Generally, the enterprise characteristics could be found on the first page of the website, but for better coverage, it is recommended to look at list to the second level pages. The web pages could be stored as HTML, text or term matrix in files, SQL or NoSQL stores. The volume of stored information could vary according to the format or country size – from hundreds of MB to hundreds of GB. The characteristics of enterprise on its site are relatively stable from year to year, although the content could change daily or be outdated. As hole, this OBEC data source is at rest for at list several months or years. Search Engines, APIs, Yellow Pages entity These OBECs’ data sources are of well-known structure, due to their small number. They usually provide the information in structured formats like JSON and XML or semi-structured like HTML. The search engines are usually well-known international ones and in some cases, a country specific could be used. The Yellow Pages are usually country specific ones and in some cases, international could be used. Search Engines, Yellow Pages, Government registers or Business organisation registers could provide APIs as OBEC data sources. The volume of the informa...
AutoNDA by SimpleDocs

Related to Information architecture for WPC

  • Information Technology Enterprise Architecture Requirements If this Contract involves information technology-related products or services, the Contractor agrees that all such products or services are compatible with any of the technology standards found at xxxxx://xxx.xx.xxx/iot/2394.htm that are applicable, including the assistive technology standard. The State may terminate this Contract for default if the terms of this paragraph are breached.

  • NYS OFFICE OF INFORMATION TECHNOLOGY SERVICES NOTIFICATION All New York State Agencies must notify the Office of Information Technology Services of any and all plans to procure IT and IT -related products, materials and services meeting required thresholds defined in Technology Policy NYS–P08-001: xxxxx://xxx.xx.xxx/sites/default/files/documents/NYS-P08-001.pdf, as may be amended, modified or superseded. SALES REPORTING REQUIREMENTS Contractor shall furnish OGS with quarterly sales reports utilizing Appendix I - Report of Contract Sales. Purchases by Non- State Agencies, political subdivisions and others authorized by law shall be reported in the same report and indicated as required. All fields of information shall be accurate and complete. OGS reserves the right to unilaterally make revisions, changes and/or updates to Appendix I - Report of Contract Sales or to require sales to be reported in a different format without processing a formal amendment and/or modification. Further, additional related sales information and/or detailed Authorized User purchases may be required by OGS and must be supplied upon request. Reseller Sales Product sold through Reseller(s) must be reported by Contractor in the required Appendix I – Report of Contract Sales. Due Date The Appendix I - Report of Contract Sales will be quarterly (January - March, April - June, July - September and October - December). Reports will be due 1 month after the closing quarter. SERVICE REPORTS FOR MAINTENANCE/SUPPORT AND WARRANTY WORK Service Reports for Authorized User An Authorized User in an RFQ may require compliance with any or all of this section. If requested by the Authorized User, the Contractor shall furnish the Authorized User with service reports for all Maintenance/support and warranty work upon completion of the services. The service reports may include the following information in either electronic or hard copy form as designated by the Authorized User:  Date and time Contractor was notified  Date and time of Contractor’s arrival  Make and model of the Product  Description of malfunction reported by Authorized User  Diagnosis of failure and/or work performed by Contractor  Date and time failure was corrected by Contractor  Type of service – Maintenance/support or warranty  Charges, if any, for the service Service Reports for OGS

  • Additional Information for Product Development Projects Outcome of product development efforts, such copyrights and license agreements. • Units sold or projected to be sold in California and outside of California. • Total annual sales or projected annual sales (in dollars) of products developed under the Agreement. • Investment dollars/follow-on private funding as a result of Energy Commission funding. • Patent numbers and applications, along with dates and brief descriptions.  Additional Information for Product Demonstrations: • Outcome of demonstrations and status of technology. • Number of similar installations. • Jobs created/retained as a result of the Agreement.

  • Research Use Reporting To assure adherence to NIH GDS Policy, the PI agrees to provide annual Progress Updates as part of the annual Project Renewal or Project Close-out processes, prior to the expiration of the one (1) year data access period. The PI who is seeking Renewal or Close-out of a project agree to complete the appropriate online forms and provide specific information such as how the data have been used, including publications or presentations that resulted from the use of the requested dataset(s), a summary of any plans for future research use (if the PI is seeking renewal), any violations of the terms of access described within this Agreement and the implemented remediation, and information on any downstream intellectual property generated from the data. The PI also may include general comments regarding suggestions for improving the data access process in general. Information provided in the progress updates helps NIH evaluate program activities and may be considered by the NIH GDS governance committees as part of NIH’s effort to provide ongoing stewardship of data sharing activities subject to the NIH GDS Policy.

  • Information Technology Accessibility Standards Any information technology related products or services purchased, used or maintained through this Grant must be compatible with the principles and goals contained in the Electronic and Information Technology Accessibility Standards adopted by the Architectural and Transportation Barriers Compliance Board under Section 508 of the federal Rehabilitation Act of 1973 (29 U.S.C. §794d), as amended. The federal Electronic and Information Technology Accessibility Standards can be found at: xxxx://xxx.xxxxxx-xxxxx.xxx/508.htm.

  • Implementation Report Within 150 days after the Effective Date, Extendicare shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include:

  • Electronic and Information Resources Accessibility and Security Standards a. Applicability: The following Electronic and Information Resources (“EIR”) requirements apply to the Contract because the Grantee performs services that include EIR that the System Agency's employees are required or permitted to access or members of the public are required or permitted to access. This Section does not apply to incidental uses of EIR in the performance of the Agreement, unless the Parties agree that the EIR will become property of the State of Texas or will be used by HHSC’s clients or recipients after completion of the Agreement. Nothing in this section is intended to prescribe the use of particular designs or technologies or to prevent the use of alternative technologies, provided they result in substantially equivalent or greater access to and use of a Product.

  • Enterprise Information Management Standards Grantee shall conform to HHS standards for data management as described by the policies of the HHS Office of Data, Analytics, and Performance. These include, but are not limited to, standards for documentation and communication of data models, metadata, and other data definition methods that are required by HHS for ongoing data governance, strategic portfolio analysis, interoperability planning, and valuation of HHS System data assets.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

Time is Money Join Law Insider Premium to draft better contracts faster.