Installation of Electrical Equipment Sample Clauses

Installation of Electrical Equipment. EPC Contractor shall and shall cause each Subcontractor to install all electrical equipment, conduit and wiring included in the Work in accordance with National Electrical Code standards, as and to the extent required by the authority having jurisdiction in the city, county or state in which the Premises are located, and all Legal Requirements and Utility Requirements. Wiring must be UL listed, with labeling to show the voltage rating.
AutoNDA by SimpleDocs
Installation of Electrical Equipment. In the electrical cabinet, wire should be equipped neatly and marked clearly. Every exposed live part should be installed guard Electrical connection between the equipment units is from the terminal access. All electrical components installed should paste plastic signs of electrical code according to paper. Power socket (220v) should be installed in control cabinet for maintenance. Using terminal sign on the equipment Power line mode: three-phase four -wire system. Equipment with all connecting cable and mental hose between electrical cabinets, cable connection takes terminal wiring.

Related to Installation of Electrical Equipment

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the equipment or parts in the required locations at no additional charge, unless otherwise specified in the Price Sheets. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the equipment or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the equipment or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!