Internal Evacuation System Sample Clauses

Internal Evacuation System. SPPD shall provide inter-connection facilities from the Project switchyard to the nearest Inter-connection Point including 132 kV Transmission line and bay/s for transmission system in the switchyard in the interconnection point. SPD shall be responsible for making arrangements of construction of 33kV/132kV project switchyard and connecting the project switchyard to the 132kV transmission line at the project boundary.
AutoNDA by SimpleDocs
Internal Evacuation System. APGCL will provide 220 kV connectivity by constructing a LILO line up to the plant boundary.
Internal Evacuation System a) GIPCL will provide necessary evacuation facilities such as the 33/400 kV PSS-I & PSS-II and the associated 400 KV transmission lines for interconnection of the 600 MW Phase-I with CTUIL’s 400/ 765 KV Khavda PSS-2 and evacuation of power up- to the interconnection point.

Related to Internal Evacuation System

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Information Systems The Official Agency in conjunction with the Authority will meet the relevant requirements of Articles 131 to 136 of Regulation (EU) 2017/625 and Implementing Regulation (EU) 2019/1715 as appropriate to the Official Agency. The Official Agency shall record appropriate data in the Official Agency Premises Inspection database (OAPI), which will be further developed over the life of the contract. Data should be entered into the database on an ongoing basis but shall be entered within one month of the activity taking place, unless otherwise agreed with the Authority.

  • Communication Systems The Parties agree to share the use of communication systems, radios and radio frequencies for the implementation of this Agreement. Sharing of frequencies must be approved only by authorized personnel for each Party and documented in the AOP.

  • Internet Connectivity School must provide sufficient hardline internet connectivity and the required network configurations (provided in Exhibit A) for each Pixellot System to allow live broadcasts. PlayOn will provide the point-to-point wireless internet base station (“Point to Point”) when needed to deliver hardline internet connectivity to Pixellot Systems installed in outdoor venues; provided that PlayOn is able to select the make and model of the Point to Point system. In the event that School requests, or requires, a specific Point to Point system that is different from what is provided by PlayOn, then School must provide and install the Point to Point system at its own expense.

  • Management Information System The M&E Plan will describe the information system that will be used to collect data, store, process and deliver information to relevant stakeholders in such a way that the Program information collected and verified pursuant to the M&E Plan is at all times accessible and useful to those who wish to use it. The system development will take into consideration the requirement and data needs of the components of the Program, and will be aligned with existing MCC systems, other service providers, and ministries.

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Management Information Systems A. The CONTRACTOR shall maintain a process that collects, analyzes, integrates, and reports data. (42 C.F.R. § 438.242(a); Cal. Code Regs., tit. 9, § 1810.376.) This process shall provide information on areas including, but not limited to, utilization, claims, grievances, and appeals. (42 C.F.R. § 438.242(a).)

  • Connectivity User is solely responsible for providing and maintaining all necessary electronic communications with Exchange, including, wiring, computer hardware, software, communication line access, and networking devices.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!