Inverter Equipment Pads and Substation Foundation. Electrical equipment will be located onsite in multiple locations. There will be one inverter building (that houses two inverters and one associated transformer) for every approximately 7 acres of solar field. One inverter building will house (2) 500-kW inverters, so there will be one inverter building for every 1 MW of solar field. Approximately 7 acres are needed for a 1-MW solar array. As stated in Section 2.6.3, approximately 145 acres of modules will be installed within the 982 acre proposed project area. Up to 75 inverter buildings will be needed. The inverter stations will require a concrete pad of approximately 40 by 10 feet. The inverter buildings will be approximately 10 feet tall. Wiring connecting module arrays to the inverters and the inverters to the substation will need to be run in underground cables (Attachment B, Photos 11, 12, and 13). Trenching is required for the conductors from the inverter buildings to the main substation. Trenching requires removing earth in a section of several feet wide by approximately 2 to 3 feet deep. The substation will require an area of approximately 10 acres. The substation consists of a steel support structure that is 15 to 20 feet tall. The substation will be surrounded by a cyclone fence that is approximately 10 feet tall. The substation will include a small control building, approximately 20 feet wide by 20 feet long, that is enclosed with air conditioning. Pending location of the substation, overhead electrical distribution lines may be required to connect the substation with BPA’s transmission line. Poles supporting the overhead lines will be required approximately every 750 feet. Installation of inverter equipment pads and other foundations will occur over a period of approximately 5 to 6 months.
AutoNDA by SimpleDocs

Related to Inverter Equipment Pads and Substation Foundation

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • Interconnection Facility Options The Intercarrier Compensation provisions of this Agreement shall apply to the exchange of Exchange Service (EAS/Local) traffic between CLEC's network and Qwest's network. Where either Party acts as an IntraLATA Toll provider, each Party shall xxxx the other the appropriate charges pursuant to its respective tariff or price lists. Where either Party interconnects and delivers traffic to the other from third parties, each Party shall xxxx such third parties the appropriate charges pursuant to its respective tariffs, price lists or contractual offerings for such third party terminations. Absent a separately negotiated agreement to the contrary, the Parties will directly exchange traffic between their respective networks without the use of third party transit providers.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Equipment Use Lessee agrees that the Equipment will be operated by competent, qualified personnel in connection with Lessee's business for the purpose for which the Equipment was designed and in accordance with applicable operating instructions, laws, and government regulations, and that Lessee shall use all reasonable precautions to prevent loss or damage to the Equipment from fire and other hazards. Lessee shall procure and maintain in effect all orders, licenses, certificates, permits, approvals, and consents required by federal, state, or local laws or by any governmental body, agency, or authority in connection with the delivery, installation, use, and operation of the Equipment.